1 B. Todd AB/CO/MI BIS Audit 18 th September 2006 Test and Monitor with the CIBT

2 benjamin.todd@cern.ch LHC Beam Interlock System 2 of 25 Test and Monitor with the CIBT 2. CIBT Realisation -Serialiser / Deserialiser -BEAM_PERMIT_INFO -CIBTD Display Driver -Remarks 1. CIBT Overview -Location -SPS vs LHC Chassis

3 benjamin.todd@cern.ch LHC Beam Interlock System 3 of 25 Overview CIBT linked to each CIBM -TESTing CIBU -MONITORing CIBU -Drives Beam Permit Info For some CIBU

4 benjamin.todd@cern.ch LHC Beam Interlock System 4 of 25 Overview LHC Type ChassisSPS Type Chassis

5 benjamin.todd@cern.ch LHC Beam Interlock System 5 of 25 Principle Function CIBT primarily acts as a SERialiser DESerilaiser (SERDES), Or.. A fancy MUX / DEMUX of serially encoded signals ‘hot’ redundancy!

6 benjamin.todd@cern.ch LHC Beam Interlock System 6 of 25 TEST and MONITOR Simple signal paths -automatically swaps between broken links inside the controller -appends internal status of the CIBT

7 benjamin.todd@cern.ch LHC Beam Interlock System 7 of 25 Implementation Implemented in Spartan 2 FPGAs 5V compatible I/O It has two other functions.. -Drive BEAM_PERMIT_INFO -Illuminate a small Display Display driver is carried out independantly!

8 benjamin.todd@cern.ch LHC Beam Interlock System 8 of 25 BEAM_PERMIT_INFO Simple circuits, a pair of majority voters… -Extra pins were available, used to increase availability ZTZT ZTZT ZTZT

9 benjamin.todd@cern.ch LHC Beam Interlock System 9 of 25 BEAM_PERMIT_INFO LHC Simple circuits, a pair of majority voters… -B1 versus B2 Circuits exploit RS485 multidrop:

10 benjamin.todd@cern.ch LHC Beam Interlock System 10 of 25 BEAM_PERMIT_INFO SPS Simple circuits, a pair of majority voters… -LEFT & RIGHT Circuits exploit RS485 multidrop:

11 benjamin.todd@cern.ch LHC Beam Interlock System 11 of 25 Display CIBTD Simple display, short circuit can risk only the display FPGA

12 benjamin.todd@cern.ch LHC Beam Interlock System 12 of 25 Functions Explained TESTING -CIBM writes a buffer to the CIBT, serialised comms, not VME -CIBT transmits this information to the CIBU devices twice per second MONITORING CIBT writes a buffer to the CIBM, serialised comms, not VME CIBT writes around 16 bits which represent internal state CIBM transmits this combined information to the CIBM twice per second -N.B. increasing the rate to 1k or thereabouts is planned (DC balancing) BEAM_PERMIT_INFO -CIBT receives two sets of BPI signals, each in TMR --if either is TRUE, it sets the internal BPI to TRUE -RS485 multidrop is used to accommodate all the configurations CIBTD -The data sent back to the CIBM is sent in parallel to the CIBTD -LEDs illumate corresponding to data -Simple board, not critical if it fails!

13 benjamin.todd@cern.ch LHC Beam Interlock System 13 of 25 FIN