Presentation is loading. Please wait.

Presentation is loading. Please wait.

Ralf Herzog AP OP QSPG, SAP AG Version 1.0.0 November 23, 2005 Modeling and PIC Governance.

Similar presentations


Presentation on theme: "Ralf Herzog AP OP QSPG, SAP AG Version 1.0.0 November 23, 2005 Modeling and PIC Governance."— Presentation transcript:

1 Ralf Herzog AP OP QSPG, SAP AG Version 1.0.0 November 23, 2005 Modeling and PIC Governance

2  SAP AG 2005, Modeling and PIC Governance / Ralf Herzog / 2 Revision Log DateAction Nov 23, 2005 V1.0.0 confirmed by AP Engineering Management Team, AP OP Process Network Nov, 2005 Creation and Review of Draft Version with: Ralf Herzog, Anton Dillinger, Nicole Leuchter, Frank Hering, Rolf Schulte-Rebbelmund

3  SAP AG 2005, Modeling and PIC Governance / Ralf Herzog / 3 Product View Integration View Internal Functional View Models for Product Definition and Implementation Choreograph messages for each process interaction Agents, interfaces, message data types BO Models and ESR Cross-deployment unit process integration BOs, Nodes, Elements XI messages (A2A/B2B) Specification/design Platform map Functional building blocks, F&F Integration scenario catalog Deployment units with their BOs Concept Process interaction map Requirement specification for new platform development Application Platform Portfolio View Business Model View Implementation View Detailed Model High-Level Model

4  SAP AG 2005, Modeling and PIC Governance / Ralf Herzog / 4 PIL@AP Development Model Define Phase Engineer & Develop Roll- In Define High Level Modeling Functions & Features Portofolio Cases = Modeling = Implementation Test Validation Design (SDD) Detailed Modeling Specification (SRS) Unittests Documentation Configuration Software = InventDefineEngineer & DevelopDeploy

5  SAP AG 2005, Modeling and PIC Governance / Ralf Herzog / 5 Process Integration Content – Modeling and Governance Modeling Processes take place early in development Governance processes ensure engineering excellence The Iterative approach covers all externalized aspects of a business object Change Requests Platform Portfolio IP Secure Intellectual Property Community Process Alignment: mySAP/A1S/B1 [as of Release 2] Implementation and Rollout High-Level Modeling Detailed Modeling Change Requests mySAP consol. Business Object PIC node structure elements actions, interfaces.. PIC1PIC2PIC3 GDT PIC PIC0 Business Object Coordination

6  SAP AG 2005, Modeling and PIC Governance / Ralf Herzog / 6 Process Gates PIC 0 and PIC 1,2,3 PIC 0 1 PIC 0 2 PIC 0 3 PIC 1 PIC 2 PIC 3 GDT PIC ESA Entity Identification & Cut Integration Scenario Structure Service Orchestration Identification of BO’s, PC’s, DU’s (Name and Semantics) Identification of PC’s and PC interactions within Integration Scenario (Name and Semantics) Identification and cut of Service Operations and Interfaces within PC interaction (Name and Semantics) Definition of Node Structure of BO Node Structure Elements Actions, Queries, Interfaces GDT’s Detailed Definition of Global Data Types Assignment GDT’s to BO nodes Definition of Actions, Queries, compound services PIC 01 approval Required to start PIC 1 PIC 0 3 approval of PCIM’s (Interfaces and Serv. Operations) required to start PIC 3 Change Requests

7 Global Data Type Modeling – GDT PIC Further Readings Process Modeling – PIC0 Business Object Modeling – PIC 1-3

8  SAP AG 2005, Modeling and PIC Governance / Ralf Herzog / 8 From business scope to high quality implementation in a structured and efficient way Portfolio/Scope Functional Building Blocks Features & Functions Integration Scenario Catalog BO/DU Map Level 1: Deployment Unit Level 2: Process Component Level 3: Business Object Service Orchestration Process Component Model / Process Component Interaction Model A2A & B2B Services, Process Agents, Integration Scenario Model “Circuit Diagram” Process Components and their interactions Step 1. Identification and Structuring Step 2. Integration Scenario Overview Governance Process PIC0 Content Governance BO Modeling Operation Signature Modeling Step 3. Definition of Service Orchestration

9  SAP AG 2005, Modeling and PIC Governance / Ralf Herzog / 9 BO PIC (1-3) for Integration Scenarios SAP-wide Review Process Governance Process for Process Integration Modeling KEY MESSAGE The BO, PC and DU identification is part of a Governance Process PIC0. Only Objects that have passed the process will be part of the Enterprise Services Repository. In scope of this Governance Process are Core BOs, Replicated BOs, PCs and DUs. Other Object Types such as Maximal BO Modeling Templates, Adapted Objects, Dependent Objects, Business View Objects are not subjects of the Governance Process for Object Identification. A dedicated Governance Process for these Objects is currently under discussion. Development prepares content, coaching by Gov. team AP Architects Review AP Management Review Gov. Team Gate AP Architects Gate AP Mgmt Gate AP Mgmt final approval AP Review Process P2D sign off SAP Mgmt

10 Global Data Type Modeling – GDT PIC Further Readings Process Modeling – PIC0 Business Object Modeling – PIC 1-3

11  SAP AG 2005, Modeling and PIC Governance / Ralf Herzog / 11 BO PIC Governance Governance Coaching, Steering, Approval Business Objects Elements Interfaces / Operations PIC 1PIC 3PIC 2 Scoping, Identification Definition Implementation StructureElementsFinal Goals of the Governance Process for Business Objects (BOs) consistency of semantics across development units reuse wherever possible similar treatment of similar objects (customer invoice – supplier invoice) identical modeling and documentation rules => “high quality” Business Process Platform (from a conceptual viewpoint) Dev Close P2D PIC0

12  SAP AG 2005, Modeling and PIC Governance / Ralf Herzog / 12 Governance Process for Process Integration Content Review Part 1 Sign-Off Phase PIC Meeting document creation Escalation Objections AP OPSBO ExpertsCoaching Team Owner and Integration Expert SAP wide Review Review feasible? Critical Issue? Review Part 2 Document Accepted? Final Document created PIC Final Release Document Accepted?

13  SAP AG 2005, Modeling and PIC Governance / Ralf Herzog / 13 Governance Process for Process Integration Content Review by experts Sign-Off Phase Creation of document according to guidelines Escalation Inform SVP AP OPS BO Experts Coaching Team Owner and Integration Expert Discussion in Q&A document monitoring by Coaching Team Inform owner + experts about review details Every 2 weeks status report to SVPs PIC Final Release Owner triggers translation after sign-off and finalization of document Review feasible? Check by coach Final BO Document created Critical Issue? Check by owner Document Accepted? Check by AP OPS Translation ok? Check by owner Document Accepted? Check by AP OPS 7 days 14 days Bilateral Clearing Phase Adress questions in Q/A If coaching within 7 days is not feasible BO Owner can start PIC Review without coaching Review and Sign-Off Phase for Frontrunner II BOs only 7 days overall ≤ 7 days SAP wide Review (only PIC 1 + 3) Consolidation Open Issues PIC Meeting Open Issues PIC Scheduling Objections?

14  SAP AG 2005, Modeling and PIC Governance / Ralf Herzog / 14 PIC Governance Process and Roles for Business Objects Development by Project Integration Experts / Content Owner Governance & Guidance by Coaching Team Business Objects / Nodes / Operations Data Types Methodology Approval by Process Integration Content Council (PIC) Business Objects / Nodes / Operations Data Types A BC Methodology Council: Methodology, Design Rules, Procedure Model D Organizational structure with roles and tasks (A – D, details see BO Guideline)

15  SAP AG 2005, Modeling and PIC Governance / Ralf Herzog / 15 Tasks

16 Global Data Type Modeling – GDT PIC Further Readings Process Modeling – PIC0 Business Object Modeling – PIC 1-3

17  SAP AG 2005, Modeling and PIC Governance / Ralf Herzog / 17 GDT Overview / Goals Business objects and operations are hierarchically structured. Elements of a BO or an operation are uniformly described by data types known as “Global Data Types” (GDT). Global data types are based on a set of basic types, known as core component types (CCT). Core component types were defined by the UN/CEFACT in the ebXML framework and are based on the XML Schema If the same semantic subject appears in (leaf) elements, it is always characterized by the same Global Data Type. GOAL of the GDT PIC-process is to harmonize GDTs SAP-wide

18  SAP AG 2005, Modeling and PIC Governance / Ralf Herzog / 18 Development by Project Integration Experts Guidance by Coaching Team Communication Interfaces Data Types PIC Process and Roles Review by Process Integration Content Council (PIC) Communication, B2B/A2A Interfaces Global Data Types Coaching and Guiding Registration at Coaching Team Quality Check Review of GDTs Communication Review PIC1 InventDefineDevelopDeployOptimize

19  SAP AG 2005, Modeling and PIC Governance / Ralf Herzog / 19 GDT PIC Governance Review by experts SAP wide review Design of GDT according to guidelines Escalation to BOT or DCM AP OPS Experts Coaching Team GDT Owner Creation of GDT in X3R Inform owner + experts about review details Every 2 weeks status report to SVPs Update GDT catalogue Initiate translation of GDT Review feasible? Check by coach Final GDT document Review accepted? Document Accepted? If coaching within 7 days is not feasible GDT Owner can start PIC Review without coaching

20 Global Data Type Modeling – GDT PIC Further Readings Process Modeling – PIC0 Business Object Modeling – PIC 1-3

21  SAP AG 2005, Modeling and PIC Governance / Ralf Herzog / 21 Further Readings Process Modeling and PIC0 Guidelines  ESA Modeling Handbook ESA Modeling Handbook  Content Creation Guideline Content Creation Guideline  Naming Rules for Operations and Interfaces Naming Rules  ARIS Business Designer and Web DesignerBusiness Designer Web Designer Templates  Changerequest Template and Change ProcessTemplateChange Process (can also be found in SAP Portal : AP  Engineering  Process Modelling) BO Modeling and PIC1 – PIC3 Guidelines: \\dwdf029\ap_eng\Content_Governance\40_Guidelines\BO_Guidelines \\dwdf029\ap_eng\Content_Governance\40_Guidelines\BO_Guidelines Templates: \\dwdf029\ap_eng\Content_Governance\10_Business_Object_Governance_&_Coaching\40_Template-and-Pattern \\dwdf029\ap_eng\Content_Governance\10_Business_Object_Governance_&_Coaching\40_Template-and-Pattern GDT Modeling and GDT PIC Guidelines: \\dwdf029\ap_eng\Content_Governance\40_Guidelines\GDT_Guidelines \\dwdf029\ap_eng\Content_Governance\40_Guidelines\GDT_Guidelines Templates: \\dwdf029\pic-coaching\100_ESA_BusinessObjects\00_GDT_Templates \\dwdf029\pic-coaching\100_ESA_BusinessObjects\00_GDT_Templates Templates can be found also in the AP Portal  Quality&Standards  Templates

22 Global Data Type Modeling – GDT PIC Appendix Process Modeling – PIC0 Business Object Modeling – PIC 1-3

23  SAP AG 2005, Modeling and PIC Governance / Ralf Herzog / 23 AP View of the Taxonomy & Governance Processes ARIS PIC0

24  SAP AG 2005, Modeling and PIC Governance / Ralf Herzog / 24 AP View of the Taxonomy & Governance Processes PIC1

25  SAP AG 2005, Modeling and PIC Governance / Ralf Herzog / 25 AP View of the Taxonomy & Governance Processes PIC2

26  SAP AG 2005, Modeling and PIC Governance / Ralf Herzog / 26 AP View of the Taxonomy & Governance Processes PIC3


Download ppt "Ralf Herzog AP OP QSPG, SAP AG Version 1.0.0 November 23, 2005 Modeling and PIC Governance."

Similar presentations


Ads by Google