Presentation is loading. Please wait.

Presentation is loading. Please wait.

ITER Issue Cards Joachim Roth, Issue Cards, EU PWI TF Meeting, Ljubljana 2006 Short Information on ITER Design Review and Issue Cards: (an outsider view,

Similar presentations


Presentation on theme: "ITER Issue Cards Joachim Roth, Issue Cards, EU PWI TF Meeting, Ljubljana 2006 Short Information on ITER Design Review and Issue Cards: (an outsider view,"— Presentation transcript:

1 ITER Issue Cards Joachim Roth, Issue Cards, EU PWI TF Meeting, Ljubljana 2006 Short Information on ITER Design Review and Issue Cards: (an outsider view, better ask Franco Federici or Arne Kallenbach) as answer to the growing request for an ITER design review the possibility to submit issue cards appeared on Sept. 12, 2006 evidently, issue cards existed before for internal ITER use

2 ITER Issue Cards Joachim Roth, Issue Cards, EU PWI TF Meeting, Ljubljana 2006

3 ITER Issue Cards Joachim Roth, Issue Cards, EU PWI TF Meeting, Ljubljana 2006 Arne Kallenbach and Peter Stangeby were appointed to lead the collection and consolidation process of issue cards drom the ITPA SOL/DIV on Sept. 21, 2006. by Oct. 11, 2006 the number of issue cards issued by the ITPA had increased to 46 a first compilations of issue cards from the ITPA SOL/DIV shows inconsistencies and contradictions

4 ITER Issue Cards Joachim Roth, Issue Cards, EU PWI TF Meeting, Ljubljana 2006

5 ITER Issue Cards Joachim Roth, Issue Cards, EU PWI TF Meeting, Ljubljana 2006 between Oct. 11 and and Nov. 7, 2006 the issue cards were combined, consolidated, edited and reduced to 14 at the ITPA SOL/DIV meeting on Nov. 7, 2006 all issue cards were discussed, and a final list was compiled. For each card a group of scientists were identified responsible for final editing.

6 ITER Issue Cards Joachim Roth, Issue Cards, EU PWI TF Meeting, Ljubljana 2006

7 ITER Issue Cards Joachim Roth, Issue Cards, EU PWI TF Meeting, Ljubljana 2006 other organisations and associations, such as IPP, are compiling issue cards, partly on identical issues Can the EU PWI Task Force contribute to the ongoing design review? What PWI issues of high priority, requiring ITER design changes, remain unconsidered and need to be formulated in issue cards?


Download ppt "ITER Issue Cards Joachim Roth, Issue Cards, EU PWI TF Meeting, Ljubljana 2006 Short Information on ITER Design Review and Issue Cards: (an outsider view,"

Similar presentations


Ads by Google