Presentation is loading. Please wait.

Presentation is loading. Please wait.

1 Nick Yamasaki Chair, TSG-S 04 December 2008 Review of TSG-S Activities in 2008.

Similar presentations


Presentation on theme: "1 Nick Yamasaki Chair, TSG-S 04 December 2008 Review of TSG-S Activities in 2008."— Presentation transcript:

1 1 Nick Yamasaki Chair, TSG-S 04 December 2008 Review of TSG-S Activities in 2008

2 2 1. In general, in addition to ordinary work re requirements, architecture, project management, security and OAM&P, TSG-S greatly contributed to cross-TSG discussion and coordination. (host joint meeting, lunch-time meeting, joint meeting hosted by the other group, etc) 2.Combining WG2 (Architecture) and WG5 (OAM&P), both groups are with less participants 3.Hosted Joint Strategy Session for IMT-Advanced Initiatives, that leaded to Osaka Future Workshop 4.Input Presentation in Osaka Workshop “TSG-S System and Service Aspects” proposing drafting of Vision Document 5.Clif Barber served Secretary for the Workshop 6.TSG-S 3GPP2 Vision Ad-Hoc reactivated by direction from SC 7.UMB-1 Release Guide 8.WG1/3 met, but WG2/4 did not meet in September 9.Number of new Work Items proposal decreasing 10.WG4 published 9 documents in spite of limited resources TSG-S (Overview)

3 3 1. Stage1 / SRD Publication : 31 Docs S.R0006-000-A v2.0S.R0006-000-A v2.0 Wireless Features Description (3 Docs) S.R0106-A v1.0S.R0106-A v1.0 Packet-Switched Video Telephony - Stage 1 S.R0125-000-0 v1.0S.R0125-000-0 v1.0 VoIP Supplementary Services Descriptions (21 Docs) S.R0126-0 v1.0S.R0126-0 v1.0 System Requirements for Femto Cell Systems S.R0128-0 v1.0S.R0128-0 v1.0 HRPD and WiMAX Inter-Technology Handoff - Stage 1 Requirements S.R0129-0 v1.0S.R0129-0 v1.0 HRPD/1xRTT and 3GPP E-UTRAN (LTE) Interworking and Inter-Technology Handoff - Stage 1 Requirements S.R0130-0 v1.0S.R0130-0 v1.0 Interworking and Inter-Technology Handoff for UMB and UTRA/E-UTRA Technologies - Stage 1 Requirements S.R0131-0 v1.0S.R0131-0 v1.0 IMS Centralized Services - Stage 1 Requirements S.R0136-0 v1.0S.R0136-0 v1.0 System Requirements for MSC Pool WG1 (Chair : Alex Gogic)

4 4 2. SC Level Document Publication : 2 Docs - SC.P4004-0 v1.0 UIM ID Manufacturer’s Code Assignment Guidelines and Procedures - SC.P4002-0 MEID GHA Assignment Guidelines and Procedures 3. Working on - Joint Discussion re Femto Equipment ID with WG4 - Correspondence with CDG ETO re FEID - V&V disposition : S.R0126 Femto Cell SRD S.R0106-A PSVT Stage 1 S.R0006-A Parts 000, 807, 808 - Coordination for collaboration with OMA re Device Management - Coordination with TR45.8 for Clarification of Document Status WG1

5 5 3. Other Activities - WG1 Hosted Joint Meetings - Moving Forward with MEID and EUIMID due to ESN Exhaust - Joint Meeting with TSG-C on Femto Cell issue - Joint Meeting with TSG-C on UMB Enhancement - Joint Meeting to address Emergency Callback - Other TSG Hosted Joint Meetings - Joint meeting re Femto Architecture hosted by TSG-X - Joint meeting re Common IMS Issues hosted by TSG-X MMD - Joint TSG Femto AdHoc hosted by TSG-X ERA - Joint meeting re IMS Centralized Services hosted by MMD - Preparation of Presentation on Common IMS Requirements Overview for submission to the 3GPP/3GPP2 Workshop on Common IMS - Common IMS Requirements input to 3GPP SA/SA1 - Contribution to TSG-S Presentation in Osaka Workshop - Coordination with TIA TR45.8 - Document Status Table WG1

6 6 1.Combined with WG5 since May 2008 Co-Chairs : Scott Marin (Architecture) Randy Scheer (OAM&P) 2.Specifications/Reports Publication : 3 Docs S.R0124-0 v1.0S.R0124-0 v1.0 Ultra Mobile Broadband Network Architecture Model S.S0028-D v1.0S.S0028-D v1.0 OAM&P for cdma2000 (Overview, 3GPP R7 Delta Specification, 3GPP2 Network Resource Model IRP) S.S0093-0 v3.0S.S0093-0 v3.0 cdma2000 Network Performance Measurement Types WG2

7 7 3.Other Activities - Co-host joint TSG Femto Cell AdHoc meetings - Progress and synchronize a working version of the S.R0135(Femto NAM) based on PDS discussion consensus - Joint Development with TSG-X MMD on S.P0137-0 Common IMS Impact to 3GPP2 Specifications - OAM&P Specifications Development aligned with Femto NAM and UMB NAM Development - Much of the O&M work handled via conference calls - Recommended WG5 meeting contributions be frozen from further update, but should be retained, not be deleted - So-called Consultant for other TSGs in terms of OAM&P 4. Working on - UMB NAM - Femto NAM - Common IMS Impacts to 3GPP2 Specifications - All-IP NAM - OAM&P related specifications WG2

8 8 1.Work Items Processed 15 New Work Item Worksheets ( 3GPP2-00207 ~) 2.SC Level Document Publication : 5 Docs SC.R1005-0 v1.0 3GPP2 Drafting Rules SC.R1002-0 v3.0 Publication Numbering Guidelines SC.R2005-002-0 v1.0 System Release Guide for the UMB-1 Release of the cdma2000 System Specifications SC.R2005-002-0 v2.0 System Release Guide for the UMB-1 Release of the cdma2000 System Specifications SC.R2005-002-0 v3.0 System Release Guide for the UMB-1 Release of the cdma2000 System Specifications WG3 (Chair : Eileen McGrath)

9 9 3.Other Activities - Lunch-time Meeting - Release Planning for UMB-1 Release Docs (4 times ) - Drafting Rules - 3GPP2 Vision Document - Revision of SC.P1002 to codify Multi-part documents revision practice - Release Planning - Contributed to TSG-S Presentation in Osaka Workshop - 3GPP2 Vision Document Outline Work started from WG3 - Steady Activity for Work Planning together with PMT Manager - TSG-S PMT sponsored teleconference on UMB-1 Release - Guardian for “Rules” and “Procedures” - Mediator for other TSGs WG3

10 10 1. Document Publication : 9 Docs S.S0055-A v4.0 Enhanced Cryptographic Algorithms S.S0055-A v4.0 S.S0078-A v4.0 Common Security AlgorithmsS.S0078-A v4.0 S.S0078-B v1.0 Common Security AlgorithmsS.S0078-B v1.0 S.S0086-B v2.0 IMS Security FrameworkS.S0086-B v2.0 S.S0109-0 v2.0 Generic Bootstrapping Architecture (GBA) FrameworkS.S0109-0 v2.0 S.S0109-A v1.0 Generic Bootstrapping Architecture (GBA) FrameworkS.S0109-A v1.0 S.S0114-0 v2.0 Security Mechanisms Using GBAS.S0114-0 v2.0 S.S0114-A v1.0 Security Mechanisms Using GBAS.S0114-A v1.0 S.S0127-0 v1.0 CAVE Based IMS SecurityS.S0127-0 v1.0 WG4 (Chair : Anand Palanigounder)

11 11 2. Other Activities - Very Active in Joint Discussion with other Groups - TSG-X MMD and TSG-X ERA on Common IMS and Femto architectures - TSG-X PDS and TSG-A to review security architecture for UMB-HRPD inter- working - TSG-X MMD/TSG-S joint meeting on Common IMS - TSG-X PDS to help progress some of the outstanding issues with respect to eHRPD security architecture - Coordinate the further development 1x femto security architecture with TSG-X MMD - TSG-S WG1 on Femto Equipment Identifier (FEID) - TSG-C WG2.2 to review the proposed changes in C.S0067-A(HRPD security) - Working on - HRPD Security - Femto Security, including Femto AP authorization (FEID Format) WG4

12 12 - C.P5003-0 3GPP2 Vision for 2009 and Beyond - Chair : Jane Brownley Vice Chair : Clif Barber Editor : Eileen McGrath - The Ad-Hoc work started in August and met on Monday and Tuesday evenings 5:00-7:00PM. - One Conference Call held in November. - The latest meeting was held 6:00-8:00AM on Monday, 1 st December 2008! ( 7 companies, 15 persons ) - Major Contributions : LGT, ALU, Qualcomm, KDDI - Now in TSG Review by 13 February 2009 - Comment Resolution : 16 February 2009 - To be input to SC Meeting in Shanghai in Feb. - To identify future target areas for 3GPP2 3GPP2 Vision Ad-Hoc

13 13 I greatly appreciate Vice Chairs, Secretary, WG/Ad- Hoc Chairs and all the participants in TSG- S for continuous support! and Thanks for Sponsoring TSG-S Team Building next year, in advance! Merry Christmas & Happy New Year! Nick Yamasaki, TSG-S Chair Many Thanks !


Download ppt "1 Nick Yamasaki Chair, TSG-S 04 December 2008 Review of TSG-S Activities in 2008."

Similar presentations


Ads by Google