Presentation is loading. Please wait.

Presentation is loading. Please wait.

The construction of logistics center in Cheboksary 1.

Similar presentations


Presentation on theme: "The construction of logistics center in Cheboksary 1."— Presentation transcript:

1 The construction of logistics center in Cheboksary 1

2 Сonstruction of logistic center in Cheboksary 2

3 Motivations for development of warehousing property in the Chuvash Republic Advantageous geographical location 3 Concentration of production streams Concentration of trading networks Necessity of new logistics center construction 10 mln. people within a radius of 500 km Federal highway М7 Сenter of the transport corridor «North- South», «West-East» - 70 thousand trucks and trailers daily along the highway of the Volga River District The plants of the biggest foreign companies (Nestle, Danon, PEPSI, Coca-Cola, Chevrolet, Glaverbor) and Russian auto giants (VAZ, GAZ, UAZ, ZMZ) are located within the radius of 300 km Industrial production index is 115% to the level of 2010 The development of federal and regional networks (METRO Cash&Carry, Media Markt, «Perekrestok», «Karusel», «Sportmaster», «DOMO», «Pyaterochka», «Magnit», «Letoile», «Zenit Vola region», «Ruble Boom», etc.) Well-developed transport infrastructure 18 th place in Russia on density of railways 5 th place in Russia on density of roads with hard surface Absence of modern logistics centers

4 “Yesterday’s” market of warehousing property in the Chuvash Republic Old wholesale depots and re-equipped industrial buildings 4 Description of the objects: Date of construction the 1980s The area proposed from 80 to 8000 m2 Rental cost from 90 to 200 RUR./m2 per month Premises are not equipped Heated/unheated Height of ceilings from 4 to 8 m Communications are available or it is possible to connect to them There is lack of areas to organize parking Limited areas (There is no possibility to widen areas by building new ones) Objects are located in the center of the city (The traffic is hindered due to traffic jams) Minimum demand

5 “Today’s” market of warehousing property in the Chuvash Republic New cold and warm warehouses Rapidly erected hangars 5 Description of the objects : Date of construction beginning with 2000 year The area proposed from 50 to 1500 m2 Rental cost from 120 to 500 RUR./m2 Premises are not equipped Heated /Unheated Height of ceilings 4-6 m Communications, Internet, security, office premises In most cases correlation of area and height provides for human processing of freights There is a great demand among small and middle-sized business for the following objects: Automobile sales centers, repair shops Trade warehouses (medical equipment, spare parts for equipment, building materials)

6 “Tomorrow’s” market of warehousing market in the Chuvash Republic 6 Warehousing complexes built by the production companies for their own needs (Akkond, JSC; Buket Chivashii, JSC; Santek Company) Modern warehousing complexes of В+ class Premises are used only for own needs of the companies Responsible storage services and freight processing services for third parties are not rendered

7 Freight turnover in Cheboksary 7 Freight delivery 6 thousand vehicles daily Freight shipment 50 thousand tons daily

8 Concept of the logistics center To create the logistics center in order to receive wholesale freight consignments, to process them and to deliver small- batch lots to sales outlets in Cheboksary and Novocheboksarsk To meet increasing demand for modern warehousing areas among wholesale and retail companies of the region 8

9 Location of the object 9 + proximity to federal highways + proximity to Cheboksary and Novocheboksarsk (more then 60% of main sales outlets of the region) + awareness of the project location + proximity to the city transport stations + level of traffic jams is lower in comparison with Kazan and Nizhny Novgorod

10 Object structure 10 Warehousing complex of В+ class temperature rate fire alarm warehousing control system fiber optics communications video control system Managerial, office premises Hotels Parking for trucks and automobiles Car wash centers Filling stations Repair shops

11 Indices of the project efficiency 11 Total area of the warehouse40 thousand m2 Offices 6 thousand. m2 Project cost 20 mln.EURO (800 mln.RUR.), including Construction16 mln. EURO (640 mln. RUR.) Infrastructure0,4 mln. EURO (16 mln. RUR.) Equipment of the warehouse3,6 mln.EURO (144 mln. RUR.) Investment raised 15 mln.EURO (600 mln. RUR.) Payback period of the project4,2 years Critical point of utilization 65-68% Net present value (NPV) 37,2 mln. EUR (1488 mln. RUR.) Internal rate of return (IRR) 22,9% Rated period of project implementation2012 year Form of cooperationco-financing

12 Prospective lessees 12 Production plants Regional companies Federal networks Regional wholesale and retail companies

13 13 Price increase in building materials Delta between construction cost and rental cost in the region Occupancy rate of the warehousing complex Increase in Payback Period of the investment Risk factors

14 Investors are invited Corporation of Development of the Chuvash Repubblic General director – Danilov Anatoly Email: anikdan@mail.ru Tel: (8352)62-05-50


Download ppt "The construction of logistics center in Cheboksary 1."

Similar presentations


Ads by Google