1 WSDP Whole School Development Plan
Gujarat

2 WSDP A holistic school development plan
Combination of educational plan that guides the infrastructure plan and its effective usage in learning processes Reflects the vision of a school & ways to achieve it Master plan and base document for school educational as well as infrastructure works & its development in phases

3 WSDP: Guiding Principles
Child as an important stakeholder in the planning process Address the goals of SSA-RTE and NCF Better use of available existing facilities Verify the available infrastructure as per standards & norms Integration of multiple planning inputs Improve the present and plan for future Simplified documentation Ownership by community

4 WSDP In Gujarat

5 WSDP: Planning WSDP for 32749 Govt. schools
Development of Infrastructure Survey Form Survey by In house Engineers Measure of school campus Online Software development Analysis of Data as per RTE Data used for WSDP

6 WSDP: Implementation Process
Development of Infrastructure Survey Form Status of built environment Compare the status with standard norms Form developed with help of Block/District/ SPO Engineers Training given to Engineers Pilot Study: 2 Schools per block by each Engineer Finalization of Survey Form

7 WSDP: Implementation Process
Topics covered in Infrastructure Survey Form General information of School Location of School Campus (Out Door Environment) Each Building Design Each Class Room Environment Toilet Block Drinking Water MDM Kitchen Shed Comments/ Remarks Form

8 WSDP: Implementation Process
Survey by In house Engineers 25 District Project Engineers 20 Architecture at District level 387 Block level Engineers 32749 Schools surveyed Survey period: Sep to Dec’2011

9 WSDP: Implementation Process
Measure of school campus Using GPS/DGPS and total station equipment Preparation of plan showing All the structures in the school premises Location of big trees, green fence School Campus Surrounding Level at 5 mtr. Grid Interval of School campus Four photographs of school taken from different angles Three hard copy and Softcopy in AutoCAD format Survey done by Agency Plan

10 Photographs of school taken from different angles

11 WSDP: Implementation Process
Online Software development Web based application developed DISE data used as source for School Master Different level users created State (1) District (26) Block (224) Status Reports created School level information available at all level users for monitoring Data Entry done by Engineers Screen Shot

12 WSDP: Implementation Process
Analysis of Data Requirement of ACR / HM Room Primary/Upper Primary School Toilet Block (Boys/Girls) Compound Wall (Actual RMT) MDM Kitchen Shed (Area Base) Water Facility Ramp and Railing Electricity Condition of Existing infrastructure Usable Repairable (Major / Minor) Damage Excel File

13 Thanks