Presentation is loading. Please wait.

Presentation is loading. Please wait.

2010 National Defense Industrial Association - Program Management Systems Committee (NDIA PMSC). All rights reserved.. Gay Infanti NDIA PMSC.

Similar presentations


Presentation on theme: "2010 National Defense Industrial Association - Program Management Systems Committee (NDIA PMSC). All rights reserved.. Gay Infanti NDIA PMSC."— Presentation transcript:

1 Copyright @ 2010 National Defense Industrial Association - Program Management Systems Committee (NDIA PMSC). All rights reserved.. Gay Infanti NDIA PMSC Guides Update Working Group 26 August 2010

2 Copyright @ 2010 National Defense Industrial Association - Program Management Systems Committee (NDIA PMSC). All rights reserved.. Guide Update Process/Timeline Survey conducted in Spring 2009 indicated PMSC Guides require update; in future, guides will be reviewed/maintained on a regular cycle PMSC decision to tackle IBR guide first PMSC Guides Update Team established; government and additional industry participation added in November First draft revised IBR Guide released for public comment in early October; feedback adjudication began in early November; joint team reached agreement on main body of guide Significant update to Pre-Award IBR section in December Second draft release in January. Comments addressed and incorporate; revised draft distributed on 4/14/10 Formal PMSC membership voted to approve IBR Guide as working draft, for 2-month use/comment period prior to final publication IBR Guide, Revision 1, dated 9/1/2010, approved for publication on 25 August 2010

3 Copyright @ 2010 National Defense Industrial Association - Program Management Systems Committee (NDIA PMSC). All rights reserved.. Guide Update Process/Timeline (continued) Surveillance Guide team formed and update begun in April Draft Surveillance Guide, Revision 1 (7/28/10) distributed to PMSC members review/comment on 3 August 2010 Final revision targeted for completion by 1 October Vote to approve for publication tentatively scheduled for November 10th Acceptance Guide update started; completion date is TBD Application Guide update started; lead is TBD Intent Guide updated last Spring to incorporate corrections and align with EIA 748-B – Currently awaiting feedback from DCMA’s EVMC – Collecting recommendations from other sources, e.g., the Scheduling WG – Will likely recommend an out-of-cycle revision to the Intent Guide for PMSC Board and PMSC membership concurrence 3

4 Copyright @ 2010 National Defense Industrial Association - Program Management Systems Committee (NDIA PMSC). All rights reserved.. Guides Update Project Organization 4

5 Copyright @ 2010 National Defense Industrial Association - Program Management Systems Committee (NDIA PMSC). All rights reserved.. 5 IBR Guide Update Team Matt Pflieger - Battelle Marty Doucette – Pilgrim Companions Bill Mendelsohn - ITT Scott Gring - Lockheed Mitzi Shepard - Lockheed Ruth Taylor – Lockheed Dave Roberts – Navigant ( IBR Guide Lead) Todd Schulzetenberg - Raytheon Ed Silva - Raytheon Dale Gillam – SAIC Jim Brasell – Unisys Pam Brooker – Battelle Pete Wynne – Lockheed Gay Infanti – NGC (Guides Update Lead) Evelyn Neely – Raytheon Frank Malsbury – Raytheon Richard Childress – Unisys Fred Meyer – Air Force Bob Loop - Air Force Keith Samuels – Army Mia Lasat – Army Jesse Stewart – DAU Robert Pratt – DAU Roberta Tomasini - DAU Dennis Chapman – DCMA EVMC Brian Kong – DOE Matt Gonzales – JPL Ken Poole – NASA Beau Willis – Navy Anita Cukr – Navy Ted Rogers – NAVAIR Annette Junek - NAVAIR David Driver – Navy Aaron Risdal – Navy Lt Col David Arrieta – OSD Industry Participants Government Participants

6 Copyright @ 2010 National Defense Industrial Association - Program Management Systems Committee (NDIA PMSC). All rights reserved.. IBR Guide Status Working draft of IBR Guide unanimously approved in May for publication on NDIA PMSC website as a working draft for use and comment Formal comments were requested during a two-month period ending 15 July 2010 33 formal comments and recommendations were received from PMSC member companies and government agencies – All were adjudicated, documented along with the rationale for acceptance or rejection (23 accepted in whole or in-part;10 rejected), and ratified by the PMSC Board – A documented Summary and Disposition of Comments was distributed with the final revision of the document to the PMSC membership and individually included in formal responses sent by PMSC to the companies and agencies to acknowledge and thank them for their comments Yesterday, the final revision was approved for publication on the NDIA PMSC website effective 9/1/10 6

7 Copyright @ 2010 National Defense Industrial Association - Program Management Systems Committee (NDIA PMSC). All rights reserved.. Summary of IBR Guide Changes Established new standardized format/style for this guide; plan to use on all PMSC guides Improved applicability and use for non-DOD agencies and for in- house IBRs Improved consistency of the IBR process across all stakeholders Added content to address both types of IBRs, pre- and post-award Increased content and focus on risk/opportunity assessment and management Included CAM/PM/IPT risk discussion objectives for each of the following risk areas: technical, cost, schedule, resources & management 7

8 Copyright @ 2010 National Defense Industrial Association - Program Management Systems Committee (NDIA PMSC). All rights reserved.. Summary of IBR Guide Changes Added recommended content for IBR Preparation – Objectives, entrance/exit criteria – Training – Data requests Included typical IBR execution agenda Clarified that IBR is not an EVMS review – EVMS should be reviewed in connection with management system risk only – EVMS risk should be assessed by checking its status via coordination with applicable CFA responsible for EVMS surveillance Additional material/guidance added regarding pre-award IBR – Acquisition planning guidance to identify when pre-award IBRs should be considered – Mechanisms for applying and funding pre-award IBR requirements – Key process differences associated with timing of pre-award IBRs, e.g., availability and maturity of data available prior to contract award 8

9 Copyright @ 2010 National Defense Industrial Association - Program Management Systems Committee (NDIA PMSC). All rights reserved.. Surveillance Guide Update Team 9 Dave Roberts – Navigant Consulting (Team Lead) Laura Ayres, Price Waterhouse Coopers Pam Brooker – Battelle Bill Mendelsohn - ITT Scott Gring – Lockheed Martin Lucy Haines – Lockheed Martin Mitzi Shepard – Lockheed Martin Pete Wynne – Lockheed Martin Marty Doucette – Pilgrim Companions Mike O’Neill- Raytheon Andrew Dorsey – Orbital Sciences Amy Martz – Raytheon Chris Nicholson, Northrop Grumman Gay Infanti, Northrop Grumman (Guides Update lead) Industry Participants Brian Kong – DOE Jim Fountain – DOE Tom Bruder - DOE Aaron Risdal – Navy Government Participants

10 Copyright @ 2010 National Defense Industrial Association - Program Management Systems Committee (NDIA PMSC). All rights reserved.. Surveillance Guide Status Draft revision distributed to PMSC members for review and comment on August 3 rd Comments requested by 1 September 2010 Submit comments to: – Dave Roberts at David.Roberts@navigantconsulting.comDavid.Roberts@navigantconsulting.com – Gay Infanti at gay.infanti@ngc.comgay.infanti@ngc.com All comments are welcome but preferred approaches, which facilitate consolidation and review by the team, are: – Mark-ups of the draft document using M/S Word‘s Track Changes menu command, or – Inserted comments using M/S Word’s Insert Comments menu command Alternatively, you may submit comments via email referencing the sections and paragraphs to which they refer 10

11 Copyright @ 2010 National Defense Industrial Association - Program Management Systems Committee (NDIA PMSC). All rights reserved.. Summary of Surveillance Guide Changes Objective - Update Surveillance guide based on: –Changes in EIA 748-B –Latest government guidance/policy –Survey results –Lessons learned and best practices Increased focus on perceived gaps in earlier version: –Applicability of the PMSC Surveillance Guide (vs. the SSOM) –Risk and opportunity management –Schedules –Subcontractor surveillance –Data anomaly prevention –Accuracy/integrity of management report –Collection, tracking and use of surveillance results for subsequent year surveillance planning and system-level process improvements Replaced most of Section 6.3, deemed too detailed and overly-prescriptive with more generic guidance on collection/use of data and metrics Reformatted and modified terminology/definitions consistent with IBR Guide 11

12 Copyright @ 2010 National Defense Industrial Association - Program Management Systems Committee (NDIA PMSC). All rights reserved.. Next Steps Surveillance Guide – Receive, disposition, and incorporate comments received by 9/1/2010 – Publish final revision by 1 October; distribute to PMSC membership for review – Hold formal vote to approve for publication (tentatively scheduled for November) Acceptance Guide –Buddy Everage leading this team –Tentatively planning a reciprocity workshop for the fall IPM Conference –Currently accepting members; if interested, please notify Buddy (beverage@mcri.com) or Gaybeverage@mcri.com Application Guide –Starting point will be the version of the Acceptance Guide containing the RM/EVM Integration Guidance recommended by the original PMSC Risk Management WG –Currently seeking team lead and members –Targeting year-end for completion of first draft for review/comment Intent Guide –further revision prior to May 2012 is still TBD 12


Download ppt "2010 National Defense Industrial Association - Program Management Systems Committee (NDIA PMSC). All rights reserved.. Gay Infanti NDIA PMSC."

Similar presentations


Ads by Google