Presentation is loading. Please wait.

Presentation is loading. Please wait.

QAD Master Scheduling Workbench (QAD MSW) Carianne Nieuwstraten – Sr. Product Manager – MFG/SC Brent Shooltz – Sr. Business Systems Analyst – MFG/SC MMUG.

Similar presentations


Presentation on theme: "QAD Master Scheduling Workbench (QAD MSW) Carianne Nieuwstraten – Sr. Product Manager – MFG/SC Brent Shooltz – Sr. Business Systems Analyst – MFG/SC MMUG."— Presentation transcript:

1 QAD Master Scheduling Workbench (QAD MSW) Carianne Nieuwstraten – Sr. Product Manager – MFG/SC Brent Shooltz – Sr. Business Systems Analyst – MFG/SC MMUG - 03/22/2010

2 QAD Proprietary Agenda  MFG/SC - Key Strategic Initiative  Master Scheduling Objective & Challenges  Workbench Framework Introduction  Roadmap  Master Scheduling Futures  Demo  Early Adopter Program  Wrap Up

3 QAD Proprietary Key Strategic Initiative Provide a workbench for each key role in the Manufacturing and Supply Chain areas

4 QAD Proprietary Master Scheduler’s Objective  Establish an item’s most optimum build schedule that meets customer demand – Measurements : Improved Customer Service – On time deliveries – Reduced back orders Reduced Inventories – Inventory turns – Reduced inventory investment Stable Manufacturing Schedule – Increased production efficiency – Reduced set up costs/time – Reduced overtime costs

5 QAD Proprietary Master Scheduler’s Challenge Finance Engineering Executives Manufacturing Sales There’s too much cash tied up in inventory! There’s a new product introduction scheduled for the fall! But we need more time for design! Service levels are down. I need more inventory! Whatever it takes to keep the customer happy! ROI must improve; the stockholders are not happy! There are too many changes! Provide fixed schedules and the correct parts and delivery will improve.

6 QAD Proprietary Master Scheduling Challenge

7 QAD Proprietary Common Planning Situation

8 MSW & PSW Framework Introduction

9 QAD Proprietary Planning & Scheduling – Future Flow Period - > Month - > Week - > Day - > Shift - > Interval - > hour Initial plan is created by the system MRP (traditional) Leveling (new) GRC (new) Demand Received Balance demand / supply /resources to ensure a feasible and level production plan. Production Planned Sequence production orders by item attributes and resource allocations to Optimize shop floor Production Scheduled Verify materials available Release orders Print work orders and schedules Production Dispatched Monitor Production & Manage Production Order Production Reported Base MSW PSW Production Planned (MSW) Capacity & Load Planning Capacity & Load Planning Manage Scheduling Horizon Manage Scheduling Horizon Apply Data Groupings/Filters Apply Data Groupings/Filters Select Views (daily-weekly-monthly) Select Views (daily-weekly-monthly) Apply Totaling (KYB) Apply Totaling (KYB) Apply Leveling (KYB) Apply Leveling (KYB) Production Planned (MSW) Capacity & Load Planning Capacity & Load Planning Manage Scheduling Horizon Manage Scheduling Horizon Apply Data Groupings/Filters Apply Data Groupings/Filters Select Views (daily-weekly-monthly) Select Views (daily-weekly-monthly) Apply Totaling (KYB) Apply Totaling (KYB) Apply Leveling (KYB) Apply Leveling (KYB) Production Planned (Base) Auto-Firm Auto-Firm Manage Production Order Manage Production Order  Header Attributes  Operation Attributes  Date & Times Production Planned (Base) Auto-Firm Auto-Firm Manage Production Order Manage Production Order  Header Attributes  Operation Attributes  Date & Times Many new capabilities + 60> reports, inquiries, maintenance and process programs rolled up into the new Production Scheduler Production Planned Production Scheduled Production Dispatched Production ReportedDemand received CAC Demand Received (MSW) Exception Based Visual Indicators Exception Based Visual Indicators Filtering by Exceptions Filtering by Exceptions Control Content - Demand/Supply Control Content - Demand/Supply Control Demand Sources Control Demand Sources Demand Received (MSW) Exception Based Visual Indicators Exception Based Visual Indicators Filtering by Exceptions Filtering by Exceptions Control Content - Demand/Supply Control Content - Demand/Supply Control Demand Sources Control Demand Sources Demand Received (Base) Integrated CRP calculates operation dates Integrated CRP calculates operation dates Demand Detail Drilldown Demand Detail Drilldown Monitor Inventory Monitor Inventory Demand Received (Base) Integrated CRP calculates operation dates Integrated CRP calculates operation dates Demand Detail Drilldown Demand Detail Drilldown Monitor Inventory Monitor Inventory Production Dispatched (PSW) Multi-Select Multi-Select Auto Release Auto Release Export Dispatch List To Excel Export Dispatch List To Excel(MSW) Export Schedule To Excel Export Schedule To Excel Production Dispatched (PSW) Multi-Select Multi-Select Auto Release Auto Release Export Dispatch List To Excel Export Dispatch List To Excel(MSW) Export Schedule To Excel Export Schedule To Excel Production Dispatched (Base) Integrated Component Availability Check Integrated Component Availability Check Integrated Single & Multi WO Print Integrated Single & Multi WO Print View only security for shop floor personnel View only security for shop floor personnel Production Dispatched (Base) Integrated Component Availability Check Integrated Component Availability Check Integrated Single & Multi WO Print Integrated Single & Multi WO Print View only security for shop floor personnel View only security for shop floor personnel Production Reported (PSW) (MSW) Monitor activity with visual completion indicators Monitor activity with visual completion indicators Production Reported (PSW) (MSW) Monitor activity with visual completion indicators Monitor activity with visual completion indicators Production Reported (Base) Monitor WIP of production order Monitor WIP of production order Monitor WIP of operations Monitor WIP of operations Monitor WIP of production cum Monitor WIP of production cum Production Reported (Base) Monitor WIP of production order Monitor WIP of production order Monitor WIP of operations Monitor WIP of operations Monitor WIP of production cum Monitor WIP of production cum MSW PSW Base CAC MSW/PSW/CAC Together - Consolidation of 50 maintenance, report and inquiry programs - New capabilities (production scheduling, integrated component checking)

10 QAD Proprietary Framework Introduction Master Scheduling (MSW) Scheduling view designed for the purpose of master scheduling

11 QAD Proprietary Framework Introduction Production Scheduling (PSW) Scheduling view designed for the purpose of production scheduling

12 QAD Proprietary Framework Introduction Search Panel extracts content for both workbench views Navigator Panel drives content focus of both workbench views Supporting Frames apply seamlessly to both workbench views

13 MSW: Primary Grid-Set Introduction

14 QAD Proprietary Schedule Primary context of the workbench. All workbench activity and navigational behavior is driven from this panel Capacity Displays information per selected resource/item in the Schedule Grid Supply/Demand Provides demand & supply context for selected item in the Schedule Grid. Primary information used for scheduling decision making and adjustments

15 QAD Proprietary User selects the item row in Schedule Grid. Supporting Panels Enables master scheduling action and decision making. Represents over 30 maintenance programs and reports!

16 MSW: Views Create customized workbench layouts

17 QAD Proprietary Views Provides ability to create different user defined workbench layouts and save them for quick access Saves Panel Size Saves Filter/Sort/Group Settings of each Panel

18 QAD Proprietary Example: Created View with Master Scheduling (MSW) and Production Scheduling (PSW) side-by-side

19 QAD Proprietary 19 201020122014201520112013 Standard Edition June 2010 : QAD 2010 SE release  Core Functionality : - Master Scheduling Workbench (MSW) - MSW integrated Component Check Capabilities MSW Roadmap

20 QAD Proprietary 20 201020122014201520112013 Enterprise Edition September 2010 : QAD 2010.1 EE release  Core Functionality : - Master Scheduling Workbench (MSW) - MSW integrated Component Check Capabilities MSW Roadmap

21 QAD Proprietary Futures: MPS Leveling Calculation ….is a planning tool to aid in the creation of a leveled Master Production Schedule

22 QAD Proprietary Leveling the Master Schedule

23 QAD Proprietary QAD MPS Leveling Calculation Solution  A customizable batch program that automatically calculates a level MPS for a specified date range by site  Batch program output can be viewed, modified and re-leveled in MSW

24 Demo

25 QAD Proprietary Master Scheduling Workbench Value  Reduces master scheduling time and complexity  Provides exception alerts to demand, supply and capacity changes  Compresses manufacturing response  Ability to simulate changes  Enables to be proactive

26 QAD Proprietary Interested In Being An Early Adopter?  Early Adopter Criteria: –.Net use with QAD Enterprise Applications – eB2.1, SP4 or higher – Using QAD Enterprise Applications Discrete Work Orders or Advanced Repetitive No or verified customizations – High data integrity/accuracy BOM’s, inventory records, clean MRP data etc. – Verified business need for MSW, PSW and integrated component check capabilities – Resource availability from May 10 th through around July 12 th Project Manager, Master Scheduler, Production Scheduler, Material Planner availability – Go live within the May 10 th – July 12 th time period

27 QAD Proprietary QAD Demo Center  MSW and PSW  Tuesday, March 23 rd : 8:30 – 11:30am  Step through specific business scenarios You ask, we show  Come talk to us!

28 QAD Proprietary Contact Information  Carianne Nieuwstraten E-mail: czn@qad.comczn@qad.com Phone: 503-236-0025  Brent Shooltz E-mail: bws@qad.combws@qad.com Phone: 616-285-6617


Download ppt "QAD Master Scheduling Workbench (QAD MSW) Carianne Nieuwstraten – Sr. Product Manager – MFG/SC Brent Shooltz – Sr. Business Systems Analyst – MFG/SC MMUG."

Similar presentations


Ads by Google