Presentation is loading. Please wait.

Presentation is loading. Please wait.

SeaTac International Airport ITS Initiative ITS America 2007 June 4-6 Session 24 Hicham F. Chatila, PE, PTOE.

Similar presentations


Presentation on theme: "SeaTac International Airport ITS Initiative ITS America 2007 June 4-6 Session 24 Hicham F. Chatila, PE, PTOE."— Presentation transcript:

1 SeaTac International Airport ITS Initiative ITS America 2007 June 4-6 Session 24 Hicham F. Chatila, PE, PTOE

2 Outline  Background  Project Goals  ITS Systems  Deployment Challenges  Lessons Learned

3 Background  New third runway  New terminals and buildings  New parking facilities  New control tower  New Light rail line/station  New airport access expressway

4 North Airport Expressway Project MAIN TERMINAL

5 Project Goals  Build a cost effective and scalable ITS system  Leverage existing POS technology & infrastructure  Information dissemination and sharing

6 ITS Systems (Contract 2)  Surveillance and Security  Incident detection and management  Real-time data collection  Information management

7 ITS Components and Technologies CCTV Mpeg-4 video Full matrix DMS Video detection cameras Video image processors RWIS Field Fiber Optic backbone GigE Ethernet switches Communication hubs Fiber Optic patch panels Communications ITS Device Management App. Data Warehousing App. Incident Management App. VM Environment Head-end

8 Surface Operations Passenger Surface Transportation Passenger Parking Passenger Service Security/Safety Surface Travel Information Intermodal Cargo Exchange Air Operations Aircraft Movement Aircraft Servicing Air Traffic Control Flight Safety/Security Traveler Information, on Air Operations Air Cargo Handling Interface Between Air and Surface Operations Fuzzy from an ITS Perspective Airports Operations

9 Traveler Information to Travelers Commercial Vehicle Operations/ Coordination Parking Management Consolidated Car Rental Transportation Management Intermodal Coordination Curbside Management Emergency Management Landside Traveler Safety/ Security Traffic Management Landside Operations

10 Deployment Challenges at Airports  Little staff knowledge of ITS Architecture, Functions, and Standards  No ITS Plans  No systems supporting regional ITS Interoperability  Organizational structure  Institutional

11 Deployment Challenges at SeaTac International  Concurrent deployments  Parking guidance system  CCTV System revamp  911 CAD Upgrade  ICT operational issues  Sound Transit LRT system  Project phasing and commissioning  Future systems

12 Lessons Learned Develop an ITS Plan Prepare a concept of operations Understand the institutional issues Traditional transportation agency approach won’t work for airports


Download ppt "SeaTac International Airport ITS Initiative ITS America 2007 June 4-6 Session 24 Hicham F. Chatila, PE, PTOE."

Similar presentations


Ads by Google