Presentation is loading. Please wait.

Presentation is loading. Please wait.

DCN Multi CCU System Exercise 5

Similar presentations


Presentation on theme: "DCN Multi CCU System Exercise 5"— Presentation transcript:

1 DCN Multi CCU System Exercise 5
Home Work! DCN MCCU Exercise 5

2 Design a congress system with DCN for:
5.0 Microphone Management and Simultaneous Interpretation with multi CCU. 5.1 All seat positions on the podium with Flush Mounting Units Microphone, Voting, LCD, ID -Card reader, Loudspeaker & Electronic Channel Selector 5.2 Rostrum position with Flush Mounting Units Two Microphones & one Loudspeaker 5.3 All seat positions in the hall with Flush Mounting Units 5.4 Simultaneous interpretation system with 14 languages; minimal two interpretation-desks in each booth 5.5 Central recording of the floor and all translation languages must be possible. 5.6 This system must be able to use in combination with a Application Control PC. 5.7 All the central equipment such as Central Control Unit (CCU), Audio Media Interface (AMI) and Extension Power Supply (EPS) has to be placed in the 19"rack of the technical control room. The way of working (step by step) * Draw into the hall layout all units. * Make the System block diagram. * Make the System Calculation with the DCN Calculation tool. * Make the equipment list DCN MCCU Exercise 5

3 Exercise 5 19" Equipment Rack Technical Control Room Podium 11.. ..20 41.. ..50 71.. ..80 101.. ..110 131.. ..140 161.. ..170 191.. 221.. ..230 200 Chairman Int.'s Booths Int.'s Booths 20m 5m 10m 2m 4m 30m Rostrum 1 8 2 9 3 10 4 11 5 12 6 13 7 14

4 DCN System Design Exercise 5
End of section  Robert Bosch GmbH All rights are reserved. Reproduction or passing on to third parties in whole or in parts is prohibited without the written consent of the copyright owner. DCN MCCU Exercise 5


Download ppt "DCN Multi CCU System Exercise 5"

Similar presentations


Ads by Google