Presentation is loading. Please wait.

Presentation is loading. Please wait.

Re-use, recyling and future of demolished buildings.

Similar presentations


Presentation on theme: "Re-use, recyling and future of demolished buildings."— Presentation transcript:

1 Re-use, recyling and future of demolished buildings

2 construction and demolition waste (C&D)  2009 : 6,9 million t of C&D accrued in Austria   12% of the total amount of waste generated in Austria  Law since 2011: *) implentation of waste prevention programmes *) support of the life cycle thinking of products to reduce negative environmental impacts *)Strengthening of responsibility of producer  Until 2020: Austria commits itself to achieve a recycling rate of 70%  EU-Waste Framework Directive

3 Buildings in the course of times The increasing number of used building materials inhibits recycling Building constructed in 1900: 86% brickwork 5% stones & concrete 5% slag 3% wood 0,5% metals Building constructed in 1970: 40% brickwork 46% stones & concrete 5% slag 3% wood 2% metals

4 C&D waste in Austria in 2009 increasing of: C&D and Landfilled masses, decreasing of: free landfill capacity Nomenclature according to ÖNORM S2100 Rubble (without waste from building site) Roadway rubble /bitumen and asphalt concrete rubble track ballast waste from building site Quantity in (t) 3.200.000 1.300.000 1.700.000 370.000 300.000

5 Act on the Remediation of Contaminated Sites The ALSAG fee has to be payed for the insertion of residues above and below ground level; Exemption from ALSAG-fee, if  Quality assurance  Permissible at technical necessary extent  Approved building activity

6 Contaminants in buildings  Sanitary and electricity installation (e.g. PVC, heavy metals)  Tiles (e.g. heavy metals)  Gypsum plaster boards and planks (e.g. sulphate)  Window & doors (PVC)  Sealants and sealing sheets  Floor coverings  Wall & roof cladding  In further times these materials used to be appreciated but now they are contaminants

7 Recycling orientated dismantling The prospecting of contaminants avoids bad surprises  Consider historic usages  Site inspection  Develop sampling plan  Implement analytics  Develop concepts for dismantling  Develop wast management concept  Implement dismantling

8 Preparation of C&D waste / assessment of demolition work  Facturing – sieving – magnetic iron separator in mobile and stationary facilities  to produce pure and high – qualitative secondary resources  The recycling orientated dismantling and the separation of light weight fraction ensure a high qualitiy of the RC material

9 Product life cycles of Fate of contaminants in C&D waste  Point sources  Manual separation  Planar sources  Separation machines  For a high quality recyling ensures secondary resources for next generations  Merging energy & resource efficiency

10 Strategy for the sustainable use

11 Support market  Precise legal framework  Prohibition of landfilling recycable materials  Additional taxes on primary resources  Obligatory utilization rate for recycled materials in pubic construction ventures  Promotion of innovation for architects and planners  Promotion of innovation for companies regarding the development and production of recycled building materials

12 Support acceptance  Raise awareness for the conservation of resources in the construction industry  A precise legal framework supports the transition of C&D was from waste to product  Promotion of best-practice examples  Production of quality-controlled secondary raw materials  Promotion of the acceptance for secondary raw materials on the part of architects and planners

13 Support quality  Promotion of recyclable and dismantable building material  Implementation of building passport system for better documentation of materials in the building  Conduction of obligatory prospecting of contaminants before demolition  Promotion of the recycling orientated dismantling procedure  Promotion of preparation technologies  Strengthening of standardized quality assurance for RC material – quality protection for RC building materials

14 Measures along life cycle stages  Plan  Design for recycling concepts  Buildings pass  Subventions „buildings and sanify“  Ecologication of the Federal construction contacts Act  Building  Obligatory prospection of contaminants and valuables  Collaboration of building and waste management administration  Promotion of ecological housing advancement

15 Measures along life cycle stages  Dismantle  Determination für end of waste  Adaption of ALSAG-fee  Strengthening of demolition notification  Obligatory waste management concept for building sites  Recylce  Prohibition for landfillable material  Strenghtening of Quality assurance for RC material  RC quota for new buildings  Ecologication of building material industry

16 Thank you for your attention!