1 (Istanbul, Turkey, 09 to 10 April 2015)
World Meteorological Organization Working together in weather, climate and water WMO WG -TDI Status of Work (Istanbul, Turkey, 09 to 10 April 2015) Dieter Schröder, Chair WG-TDI Deutscher Wetterdienst

2 1. WG-TDI at a Glance Basic Composition
Chair: Dieter Schröder, DWD Germany Co-Chair: Ercan Büyükbas, TSMS Turkey. 4 Task Teams, 4 Rapporteurs Tasks in the Workplan are derived from ToRs from the predecessor teams Deliverables from the RA VI Operation Plan. Results from the 16th Session of RA VI in Helsinki Accepted at the meeting of MG 2014 in Tallinn Meetings of WG TDI 1st meeting: 6. – 7. November 2014 2nd meeting: foreseen September 2015 at TSMS Turkey

3 1. WG-TDI at a Glance (II) TT/WIGOS-I TT/MTDCF TT/RMDCN TT/RIC
Chair: Ercan Büyükbas, TSMS Turkey ToR: ☺ List of Members: ☺ TT/MTDCF Chair: Alexander Kats, Roshydromet Rusia ToR: ☺ List of Members: ☺ TT/RMDCN Chair: Ilona Glaser, DWD Germany TT/RIC Chair: Drago Groselj, EAS-MO Slovenia

4 1. WG-TDI at a Glance (III)
Rapporteur on WIS Antonio Vocino, MeteoAM, Italy ToR: ☺ Rapporteur on ISS East: Leonid Bezruk, Roshydromet ToR: ☺ West: Hermann Asensio, DWD Germany ToR: ☺ Rapporteur on DPFS Laurent Perron, Météo France ToR: ☺ Special Task (Nowcasting technologies) Postponed due to lack of maturity & lack of finances Requested Support: All Task Teams would like official nomination letters from WMO RA VI for their TT members

5 2. Task Team WIGOS Implementation - ToR
1. WIGOS Implementation Plan Priority Activity for TT WIGOS-I Timeline Revision, Analysis, Further Enhancement of RA VI WIGOS IP ongoing Assist RA VI Members to develop their national WIPs - Develop mechanisms for efficient cooperation with focal points - Organize workshops and prepare guidance document foreseen in the period of

6 2. Task Team WIGOS Implementation - ToR
2. Support for WIGOS Implementation Priority Activity for TT WIGOS-I Timeline Establish concrete tools for the cooperation with the other related bodies (technical commissions of WMO, WGs of the other RAs, EUMETNET, etc.. ongoing Follow new developments and technologies on observing systems for implementing in RA VI Review the existing reference documents (CIMO Guide 8, Technical Regulations-WMO 49, etc.) - Develop recommendations for determining technical requirements and siting conditions of the observation systems - Analyse the common problems of members due to the rapid urbanisation around the observation networks, and developing solution algorithms

7 2. Task Team WIGOS Implementation - ToR
3. Realizing WIGOS via Regional Observation Networks Priority Activity for TT WIGOS-I / TT RIC Timeline Determine the needs of the existing Regional Observation Networks for upgrading, enhancing and operating them by considering the requirements of Members foreseen in the period of To develop mechanisms for efficient use of RICS; - Review the capacities and needs of RICs - Improve the cooperation among RICs Realize WIGOS via regional observation networks - Review the regional observation networks (weather radars, wind profilers, lightning detection systems, etc.) - Develop mechanisms and guidance for improving the existing ones and establish new regional observation networks - Develop tools for data exchange via regional observation networks

8 2. Task Team WIGOS Implementation - ToR
4. Monitoring and Integrated Quality Management Priority Activity for TT WIGOS-I Timeline Integrate the Quality Monitoring and control activities of the members; - Establish a QM process in which the RA VI members can participate in the further development of the RA VI WIP, - Implement real-time (quality) monitoring in coordination with EUMETNET & EUCOS QM portal, - Develop real-time monitoring and reporting capabilities; incorporating existing EUMETNET & EUCOS monitoring portal, foreseen in the period of 5. Problems Not all the NMSs has nominated a WIGOS focal point WIGOS Workshop in 2016 needs additional support

9 2. Task Team WIGOS Implementation - Members
Name NMHS, State personally NMHS Remark Dr. Olaf Schulze DWD, Germany agreed Stefan Klink EUMETNET, DWD, Germany Simon Gilbert UKMO Linih Tatiana Republic of Moldova not yet agreed Müslüm Yigit TSMS Turkey Özden Tüten Subteam for Radar Data Exchange Name NMHS, State personally NMHS Remark Dr. Ferenc Dubai Hungary not yet agreed Oğuzhan Şireci TSMS Turkey agreed Cihan Gözübüyük Turkey

10 3. Task Team MTDCF - ToR 1. Coordination and Supervision of the Migration Priority Activity for TT MTDCF Timeline Continue an active and regular communication process with the national focal points. Restructure this communication process. vividly ongoing Continue a RA VI monitoring of the migration to TDCF by collecting (oral) progress and problem reports from the focal points. Restructure the monitoring process. ongoing Liaise with CBS IPET-DRMM and WMO secretariat to report and solve problems occurring during the migration to TDCF vivid exchange Prepare a continuous status report on the migration on the basis of WMO monitoring and RA VI monitoring (6.1.2). excel table Clear discrepancies between RA VI and WMO monitoring not started

11 3. Task Team MTDCF - ToR 2. Support RA VI Members in the Migration
Priority Activity for TT MTDCF Timeline Review and update the Regional Plan for the migration to TDCF in RA VI ongoing Support National Centres in RA VI to develop and update their national migration plan Advice members of RA VI on all aspects related to the migration to TDCF often Organize training events and workshops on TDCF. -(1) Organize hands-on partnership or support for countries which have severe difficulties in migrating to TDCF. actively ongoing(1) Further develop encoder-decoder software (e.g. synop2bufr) and guide members in using these tools - Collect, report and trying to solve actual problems occuring during the migration to TDCF ongoing(1) (1) Request to GISCs, DCPCs, RTHs to support!

12 3. Task Team MTDCF - ToR 3. Miscellaneous: GRIB 2 and other Code Concepts Priority Activity for TT MTDCF Timeline Collect occurring problems referring to the GRIB1 --> GRIB2 migration and give advice Not started Promote usage of WMO TDCF and sharpen the demarcation to other code concepts (e.g. XML, NetCDF)

13 3. Task Team MTDCF - ToR 4. Highlights TT focused on BUFR Migration
TDCF became reality since Nov 2014 TT accompanies this migration with vivid discussions Some NCs already stopped TAC dissemination for Synop 5. Problems No established process to approve BUFR bulletin before dissemination of TAC stops Temp conversion to BUFR: 2 alternatives - part by part  4 BUFR bulletins for 1 Temp - entirely  1 BUFR bulletin for 1 Temp

14 3. Task Team MTDCF - Members
Core and associated members Name NMHS, State personally NMHS Remark Sibylle Krebber DWD, Germany agreed confirmed Perisa Sunderic RHMSS, Serbia Brendan Butler ME, Ireland Pal Sannes Met.No, Norway ? Vasily Fisunov Ukraine - Eva Cervena CHMI, Czech Rep. retired Discussion partners from IPET DRMM Simon Elliot, EUMETSAT; Yann Genin, Météo France; Yasin Er, Turkey; Richard Weedon, UKMO; Dafi Elryalat, Jordan

15 4. Task Team RMDCN Implementation - ToR
1. Migration to RMDCN – Next Generation Priority Activity for TT RMDCN-I Timeline Monitor the Migration to RMDCN-NG in RA VI ongoing Activate DMVPN Backup of RMDCN-NG in RA VI (Backup of RMDCN with encrypted VPN over Internet) not required 2. Support RA VI Members in the Migration to RMDCN-NG Priority Activity for TT RMDCN-I Timeline Help RA VI members in any RMDCN problems - Support the trouble shooting communication with ECMWF and Interoute ongoing Advice RA VI members who are not able to afford RMDCN-NG in the "Low budget option" of RMDCN-NG (encrypted VPN over Internet to the Interoute RMDCN Gateway) Iron-A; Iron-B; Connection via 3rd party

16 4. Task Team RMDCN Implementation - ToR
3. Miscellaneous Priority Activity for TT RMDCN-I Timeline Contribute to the multicast and IPV6 issues of RMDCN (Special interest for GISC communication within WIS) not started Liaise with CBS ET-RMDCN for further development of RMDCN and discussion of problems occurring in RA VI Ongoing communi- cation via 4. Next Steps Refering to ToR Priority Activity for TT RMDCN-I T2: Activate DMVPN backup for RMDCN-NG connection in RA VI Collect status information on current DMVPN backup and discuss further steps with ECMWF T3: Help RA VI members dealing with RMDCN problems Follow up on problems reported by Russia (access to portal and language support)

17 4. Task Team RMDCN Implementation - Members
Name NMHS, State personally NMHS Remark Mattias Anderson SMHI, Sweden agreed Pavel Gal CHMI, Czech Rep. not yet agreed Raul Hilara Parra AEMET, Spain Dominic Woottall UKMetO, UK Vasiliy Fisunow SHMS, Ukraine not agreed Member in TT MTDCF Tony Bakker ECMWF Next step: Official letter from WMO to the PRs to get approval to work in the TT

18 4. Task Team RMDCN Implementation - ToR
5. Decisions/Actions from last Workshop Priority Activity for TT RMDCN-I Timeline Submit new working and Reporting structure (ROC, TT-RMDCN) to RA VI MG WG Chair Create a document which will summarize the existing RMDCN-NG backup options, including cost requirements as information for the RMDCN-NG users TT-leader in 2015 Members expressed strongly, that it is still necessary to preserve the connection diagrams showing the meteorological telecommunication network in RA VI Members also raised the question, if the proposed new communication structures using web services is seen as formal WMO communication (as traditional documents) and therefore is mandatory (in parallel to traditional documents?) WG chair

19 4. Task Team RMDCN Implementation – New Reporting Structure
New branch established CBS ICT-ISS ET-CTS ROC RA VI Management Group TAC ECMWF Council WG-TDI (RMDCN Task Team)

20 RMDCN-NG –Actual configuration (prepared by Leonid Bezrouk)

21 5. Task Team RIC - ToR 1. Collaboration between RICs and NMHS
Priority Activity for TT RIC Timeline Establish an active and regular communication process between RICs and interested NMHSs ongoing Establish a regular experience exchange (workshops, reports, other procedures) Workshop 2014 Review regional and national practices and guidelines relevant to observing networks and instrument and method of observation not started 2. Establish a Network of Calibration Centres Priority Activity for TT RIC Timeline Compile a survey on calibration capabilities in RA VI prepared Maintain a calibration laboratory capabilities data base ongoing Organize inter laboratory calibration between RICs and interested NMHSs started

22 5. Task Team RIC - ToR 3. Support on Instrument Issues
Priority Activity for TT RIC Timeline Continue capacity building activities in RA VI No activity Continue to establish traceability functions in data dissemination ongoing Assemble and distribute basic calibration kits to those NMHSs in RA-VI which have no calibration facilities Focus on measurement uncertainty of on-site measured data not started Assist members with difficulties in data quality issues

23 5. Task Team RIC - Members Name NMHS, State personally NMHS Remark
Krunoslav Premec Croatia agreed Francoise Montariol Météo France Holger Dörschel DWD, Germany NN Slovakian Met. Service Request to RIC Bratislava

24 5. Task Team RIC - ToR 5. Decisions/Actions
Priority Activity for TT RIC Timeline TT-RIC has established collaboration between MeteoMet2 Project and Slovenian NMI to improve and facilitate laboratory intercomparison and electronic form of the foreseen questionnaire WG Chair Combination of questionnaire on calibration and measurement capabilities (CMCs) of NMHSs calibration labs with the basic info on interlaboratory comparison TT-leader in 2015 Electronic questionnaire on MeteoMet2 website (with logo of MeteoMet project and WMO RA VI). All the data on CMCs will be strictly used for WMO purposes and finally published at WMO server. WMO RAVI support posting invitation letter for interlaboratory comparison and questionnaire to PR of NMHSs in RAVI. Foreseen start is September 2015. WG chair

25 6. Rapporteur on WIS - ToR 1. Status Report on Implementation
Priority Activity for Rapporteur on WIS Timeline Status of the WIS implementation in RA VI (e.g. how many countries are participating in WIS) Country data base, CBS Documents Status of knowledge and capacity building in RA VI (Survey of workshop activities) ongoing Status of the country Profile data Base (CPDB), referring to the RA VI dates 2. Assessment of WIS Operation in RA VI Priority Activity for Rapporteur on WIS Timeline Report on the comprehensive results of the WIS operational monitoring (Monitoring is provided by the RA VI GISCs) not started SWOT analysis of WIS operation in RA VI (e.g. with special focus on station catalog and effectiveness of the GISC backup) draft ideas

26 6. Rapporteur on WIS - ToR 3. Evaluation of future WIS requirements for RA VI Priority Activity for Rapporteur on WIS Timeline Collection of WIS requirements from RA VI members not started Reporting a comprehensive feedback from the RA VI members to recommendations of the relevant WIS Review of new ideas from RA VI members for the further development of WIS Report and review of new services from RA VI GISCs for WIS

27 6. Rapporteur on WIS - ToR 4. Ongoing actions – next steps
Priority Activity for Rapporteur on WIS Timeline Continue communication with WIS focal points ongoing General Survey of the implementation status – first feedbacks Draft SWOT analysis of WIS operations in RA VI foreseen 5. Issues - Support Priority Activity for Rapporteur on WIS Resp. Support from GISCs: Establish short circuit of information from/to GISCs Support from WMO RA VI: - financial support for 2 trips p.a. and a workshop in circular letters to WMO-PRs and WIS national focal points RA VI - MG - bureau Foster a network of WIS experts (to enhance awareness of WIS concept)

28 7. Rapporteurs on ISS East/West - ToR
Deliverables Priority Activity for Rapporteur on ISS East/West Timeline Support the Communication of WG to NMHSs and vice versa - Monitor status of the RMTN and support members to be connected to RMDCN in RA VI Reporting a comprehensive feedback from the RA VI members to recommendations of the relevant WIS Review of new ideas from RA VI members for the further development of WIS Report and review of new services from RA VI GISCs for WIS Rapporteur ISS West focusses on AvXML and IWXXM!

29 8. Rapporteur on DPFS - ToR
Deliverables Priority Activity for Rapporteur on DPFS Timeline Monitor and publish improvements and new development in global weather models in RA VI. Especially in DWD, ECMWF, Météo France, Roshydromet and UKMetOffice. Identify similar work in different centres and recommend synergies ongoing (draft report) Monitor and publish improvements and new development in local area weather models in RA VI. Especially in the consortia Aladin, Cosmo, Hirlam and Lace. Identify similar work in different centres and recommend synergies Analyse radar cooperation networks, especially Baldrad and Opera. Report last improvements. Analyse the need for use of radar data by numerical models. Analyse the availability of lightning data (e.g. the UKMO long range lightning data available via Eumetcast) Report on the improvements of meteo-hydrological models in RA VI not started Analyse and compare forecasters tools for volcanic ash dispersion prediction and radiologic pollution dispersion

30 Thank you for your attention !
Any questions?