IEE/12/064/SI2.645706 09/02/2015. Municipality of Kecskemét - General economic data  Capital of Bács-Kiskun county  Economic, administrative, educational,

Similar presentations


Presentation on theme: "IEE/12/064/SI2.645706 09/02/2015. Municipality of Kecskemét - General economic data  Capital of Bács-Kiskun county  Economic, administrative, educational,"— Presentation transcript:

1 IEE/12/064/SI2.645706 09/02/2015

2 Municipality of Kecskemét - General economic data  Capital of Bács-Kiskun county  Economic, administrative, educational, and cultural centre  Population: 113.275 (2011), number of households: 42.541  Important investors (e.g., Mercedes-Benz factor opened in 2012)  Economic structure:  48.3% service  41.39 % industry  10.31% agriculture  Perfect location  M5 Motorway  85 km from Budapest  70 km from the airport  NATO airbase to be transformed for civil use

3 Scheme of the Existing district heating system Heat provider: Termostar Kft. Owners: 69.5% - Municipality 30.5% - EDF DÉMÁSZ Zrt. Heating Company Proprieraty Two independent distribution system Total heated space: 2 023 929 m 3 No. of heated flats: 11 234 Supplied heat amount: 405 167 GJ No. of heat transfer stations: 309 Distribution System Capacity requirement: 38 MW Hot water requirement: 3 MW Covers hot water heat requirements Capacity: 6,6 MW thermal capacity 6,2 MW electric capacity Capacity requirement: 19 MW Hot water requirement: 1,5 MW Széchenyiváros System Árpádváros SystemGas Engines

4 District heating system – Future plans  Connection of the two separate networks financed by the Environment and Energy Operational Programme (Structural Funds) - executed  Use of geothermal energy in the district heating system  Installation of efficient gas boilers replacing the old ones  Further extension of the district heating system with residential and industrial consumers is possible and considered

5 Future demand for the district heating network

6 Project plan

7 Layout of the geothermal system

8 Installed Geothermal Capacity Length of the heating season: 182 days Peak time capacity is required in very few days a year Produced heat amount is not linear in function of the installed capacity Optimal capacity Temperature distribution chart Produced geothermal heat Optimal capacity

9 Phase 1: 3,5 MW capacity; 38 400 GJ heat Phase 1+2: 18,3MW capacity; 254 500 GJ heat Phase 1+2+3: 28,2 MW capacity; 382 100 GJ heat Execution Phases (1) Install geothermal heat plant in heat transfer station no. 202. Drill 1+1 wells Pre-heat secondary loop return water Phase 1 Connect Széchenyiváros system into geothermal heat plant Drill 3+3 wells (total 4+4 operates) Pre-heat primary loop return water Phase 2 Connect Árpádváros system into geothermal heat plant Drill 2+2 wells (total 6+6 operates) Pre-heat primary loop return water Phase 3 Safety – Reduce drilling risk Adapted milestones Earlier operation Income Subsidy Advantages 3 parallel pipeline is installed (2 small + 1 large) Large pipeline is unused in phase 1 2 small pipelines reinject in phase 3 Supply and Reinjection Pipeline Energy produced

10 Kecskeméti Termálrendszer Beruházó Ltd. (project company) 7% Municipality of Kecskemét 93% EU-FIRE Ltd. Municipality of Kecskemét Termostar ( district heating company) 69% municipality of Kecskemét 31% EDF Additional professional investors Contractors Financial investors EU-FIRE Ltd. Contractual relation Ownership relation End users (present and future consumers of the heat) Actors involved

11 Discount rate is less than 15% The project is feasible, if the following criteria can be fulfilled Sale Price: greater than 2500 HUF OR Phase 1Phase 1+2Phase 1+2+3 Drilling3 000 000 €11 900 000 €17 800 000 € Execution8 375 000 €10 275 000 €12 575 000 € Total Investment Cost11 375 000 €22 175 000 €30 375 000 € Phase 1Phase 1+2Phase 1+2+3 Heat Amount40 000 GJ250 000 GJ380 000 GJ Revenues Sale price: 2500 HUF/GJ 581 000 €/year3 013 000 €/year4 758 000 €/year Expenditures601 000 €/year1 388 000 €/year2 006 000 €/year Operating income-20 000 €1 625 000 €2 752 000 € SubsidySale price:2500 HUF/GJ 20% NPV4 422 000 € IRR20,8 % Financing of the proposed investments (1) Investment Cost Yearly Net Income Financial Results with 15% discount rate

12 What has already been done? Task carried outDate (year/month)  Heat market evaluation  Existing system study 2011/2-2012/2 2011/3-2011/8  Preliminary geological data gathering  Preliminary Well Site Report  Reservoir modelling for the Pre-feasibility study 2011/7-2012/7  Pre-Financial modelling2011/11  Pre-feasibility study2011/3-2011/12  Project company founded with private investor2011/8  Preliminary negotiations with possible investors 2011/3 - 2014/8

13 Overview of the workplan  1: Management  2: Preliminary studies  3: Licensing and permitting  4: Technical and financial engineering of the geothermal plant and system  5: Procurement  6: Financing  7: Communication  8: EACI Dissemination Activities

14 Partners & Contacts Name of the beneficiaryContact personE-mail Municipality of Kecskemét Kecskemét Megyei Jogú Város Önkormányzata Dr. Lívia BUZÁSSYbuzassy.livia@kecskemet.hu EU-FIRE Ltd. EU-FIRE Kft. Péter KOVÁCSpeter.eufire@gmail.com Project Company (KTRB) Kecskeméti Termálrendszer Beruházó Kft. Imre KOVÁCSimre.kovacs@eu-fire.hu


Download ppt "IEE/12/064/SI2.645706 09/02/2015. Municipality of Kecskemét - General economic data  Capital of Bács-Kiskun county  Economic, administrative, educational,"