Presentation is loading. Please wait.

Presentation is loading. Please wait.

EMERGENCY RESPONSE PLANNING 2005 ARIPPA Technical Symposium David B. Binder Tanner Industries, Inc. 215-322-1238.

Similar presentations


Presentation on theme: "EMERGENCY RESPONSE PLANNING 2005 ARIPPA Technical Symposium David B. Binder Tanner Industries, Inc. 215-322-1238."— Presentation transcript:

1 EMERGENCY RESPONSE PLANNING 2005 ARIPPA Technical Symposium David B. Binder Tanner Industries, Inc. Dbinder@tannerind.com 215-322-1238

2 PSYCH TEST

3 Required By Federal OSHA – 1910.120(q) ; PSM EPA – RMPs Oil Pollution Prevention Other State County Potential – Over 17 Agency Plan Requirements

4 Selected References OSHA 29 CFR 1910.120 (q) National Response Team’s “One-Plan” Integrated Contingency Plan (ICP) Federal Emergency Management Agency Red Cross National Safety Council Industry Associations

5 EMERGENCY RESPONSE 29 CFR 1910.120(q) Planning EAP/ERP Rules Of Response TRAINING Levels Time and/or Content Refreshers Medical/PFT RESPONSE Levels PPE

6 29 CFR 1910.120 (q) EMERGENCY PLANNING Emergency Action Plan - 29 CFR 1910.38 Emergency Response Plan - 29 CFR 1910.120 (q)

7 ACTION Plan ELEMENTS - 29 CFR 1910.38 Escape Procedures / Routes Shut Down SOPs Head Count Employee Rescue / Medical Duties Reporting Emergencies (fire, release, etc.) Employee Contacts for plan

8 RESPONSE Plan ELEMENTS - 29 CFR 1910.120 (q) Pre-Planning / Coordinate - outside parties Personnel roles, lines of authority, training & communication Emergency recognition & prevention Safe distances / places of refuge Site security & control

9 RESPONSE Plan (continued) Evacuation routes & procedures Decon Medical Tx / First Aid Alerting & Response procedures Response Critique / Follow-Up PPE / Emergency Equipment LEPC / SERC Plans

10 OSHA Compliance Directive CPL 02-02-059 – ER Enforcement (former CPL 2-2.59A) POTENTIAL RELEASES Incidental MAYBE ER Clearly ER

11 OSHA’s ER BENCHMARK CPL 02-02-059 ER-outside release area Evacuation required IDLH threat Fire or Explosion Act now - danger High toxicity level Uncertain - PPE and Equipment adequate Situation Unclear - Lack of Data

12 29 CFR 1910.120 (q) – EMERGENCY RESPONSE GROUND RULES ICS - IC & SAFETY OFFICER Buddy System - Entry/Back Up Establish Zones Medical – Life Support & Transport Decon

13 RESPONSE TRAINING LEVELS AWARENESS OPERATIONS Defensive Actions TECHNICIAN Offensive Actions SPECIALIST INCIDENT COMMAND

14 Awareness Level Notification and Evacuation

15 Operations Level 8 Hours Defensive Actions

16 Technician/Specialist Level 24 Hours Initial Offensive Actions

17 Incident Command Level Full Responsibility

18 RESPONSE LEVELS LEVEL A Greatest Level - Skin, Respiratory, Eye LEVEL B Highest Resp. Protect - Lesser Skin Protect. LEVEL C Known Conc. - Air Purifying Respirator LEVEL D Minimal Protection

19 ERP COMPLIANCE QUESTIONS Does Employer Intend To Have Employees Respond To Emergencies ? Adequately Trained For Intended Duties ? Properly Equipped For Intended Tasks ? Capable Of Responding Safely ? Managed By Competent Leaders ?

20 Considerations FACILITY SIZE PERSONNEL EQUIPMENT ASSIGN ROLES TRAINING LEVELS FIRE DEPARTMENT Paid/Volunteer RESPONSE CAPABILITIES - Training Levels RESPONSE TIME KNOWLEDGE of your FACILITY

21 Other Planning Considerations Overall Site Security Terrorism Sabotage Business Recovery Natural Disasters Management Information Systems

22 Questions?


Download ppt "EMERGENCY RESPONSE PLANNING 2005 ARIPPA Technical Symposium David B. Binder Tanner Industries, Inc. 215-322-1238."

Similar presentations


Ads by Google