LBT Q2 2007 Engineering Review PSPI: PEPSI installation preparation, includes all of the pier modifications.

Similar presentations


Presentation on theme: "LBT Q2 2007 Engineering Review PSPI: PEPSI installation preparation, includes all of the pier modifications."— Presentation transcript:

1 LBT Q2 2007 Engineering Review PSPI: PEPSI installation preparation, includes all of the pier modifications

2 2 Highlights (Q2/2007) Install 47 deg coolant to PEPSI bridge location Install 47 deg coolant to PEPSI bridge location Install clean dry air to PEPSI bridge location Install clean dry air to PEPSI bridge location Schedule PEPSI team, Frank and Emil visit first of July 2007 Schedule PEPSI team, Frank and Emil visit first of July 2007

3 3 Open Issues Technical Technical Definition of power at connection point Definition of power at connection point Schedule Schedule Part scheduled Part scheduled Financial Financial Cost of paint and materials Cost of paint and materials Resource Resource Identify paint and paint contractor Identify paint and paint contractor

4 4 Progress (Q2/2007) Install 47 deg coolant to PEPSI bridge location Install 47 deg coolant to PEPSI bridge location Install clean dry air to PEPSI bridge location Install clean dry air to PEPSI bridge location

5 5 Planning (Q3/2007) Terminate fibers Terminate fibers Define and install the connection point box Define and install the connection point box Install more services Install more services Move J box in pier up to 4 M, Q3 2007 Move J box in pier up to 4 M, Q3 2007 Move florescence lights in pier up to 4 M, Q3 2007 Move florescence lights in pier up to 4 M, Q3 2007 Installing energy chain/ cable chain Installing energy chain/ cable chain Installing AZ hole support structure Installing AZ hole support structure Installing gallery brackets Installing gallery brackets

6 6 Planning (before 2008) Install services Install services install E-net, install E-net, install E-stop install E-stop install telephone install telephone install power and conduit install power and conduit Insulate all pipe carrying liquids Insulate all pipe carrying liquids Epoxy paint entire floor Epoxy paint entire floor Paint walls with epoxy paint Paint walls with epoxy paint