Presentation is loading. Please wait.

Presentation is loading. Please wait.

Copyright Reserved GreenTech Malaysia PROJECT: MyHIJAU LABELLING REPORTING PERIOD: 1 – 31 OCT 2013 1 Project Brief/Summary MyHIJAU Labelling is a program.

Similar presentations


Presentation on theme: "Copyright Reserved GreenTech Malaysia PROJECT: MyHIJAU LABELLING REPORTING PERIOD: 1 – 31 OCT 2013 1 Project Brief/Summary MyHIJAU Labelling is a program."— Presentation transcript:

1 Copyright Reserved GreenTech Malaysia PROJECT: MyHIJAU LABELLING REPORTING PERIOD: 1 – 31 OCT 2013 1 Project Brief/Summary MyHIJAU Labelling is a program to encourage recognition of green products and services through standard, rating and certification. Project scope: promotion, criteria development, product evaluation & verification, database development, monitoring, market research Objectives 1)To establish one coordination system to improve green labeling product adoption 2)To increase number of certified green products 3)To improve the existing infrastructure to ease green product certification Project Fund: RM 905,679 Duration: January – December 2013 Expected Outcomes 1)2 CBs/Scheme Owner join MyHIJAU (Oct 2013) 2)5 new Product Criteria Document completed (Dec 2013) 3)100 products obtained GreenTAG (Dec 2013) 4)One Database of Green Laboratories (Dec 2013) 5)1 Market Research for Green Products and Services 2013 (July 2013) Status 1)3 Scheme Owners joined MyHIJAU (completed) 2)In progress (75% completed) 3)66 items received GreenTAG (66% completed) 4)In progress (30% completed) 5)1 market research (100% completed)

2 Copyright Reserved GreenTech Malaysia 2 Activit ies Completed (During reporting period) 1)MoU signing with SIRIM, SPAN and ST to join MyHIJAU Labelling (100% completed) 2)LCA study for 5 products groups 100 % completed. 3)Three draft of PCD completed for mattress, apparel & textile from synthetic fiber and automotive workshop 4)Proposal to conduct Post Market Research Workshop approved 5)Compilation of type of testing (status quo from last report - 30% completed) 6)Story line for video (behind schedule) 7)Appointment of SIRIM to conduct LCA training 100% completed. % completed: 81.2 % % funds utilised: Activities Planned (For next reporting period) 1)3 Draft of PCD submitted and reviewed by MyHIJAU Labelling Technical Committee (100% end of Nov 2013) 2)Post Market Research Workshop preparation (80% end Nov completed) 3)Questionnaire to testing lab distributed (100% end Nov 2013) 6)Story line/ board approved (100% end Nov 2013) 7)First draft proposal for Sustainable Tourism discussed with management (100% completed end Nov 2013) PROJECT: MyHIJAU LABELLING REPORTING PERIOD: 1 – 31 OCT 2013

3 Copyright Reserved GreenTech Malaysia 3 Impacts of the Project No impact yet Photos of activities for the period of reporting Challenges 1)Commitment from various stakeholders 2)The need to create value of MyHIJAU Program Actions 1)To held regular stakeholders consultation 2)To create positive publicity for MyHIJAU PROJECT: MyHIJAU LABELLING REPORTING PERIOD: 1 – 31 OCT 2013


Download ppt "Copyright Reserved GreenTech Malaysia PROJECT: MyHIJAU LABELLING REPORTING PERIOD: 1 – 31 OCT 2013 1 Project Brief/Summary MyHIJAU Labelling is a program."

Similar presentations


Ads by Google