Presentation is loading. Please wait.

Presentation is loading. Please wait.

Copyright Reserved GreenTech Malaysia PROJECT:IGEM 2013 REPORTING PERIOD: AUG 2013 1 Project Brief/Summary The region’s largest green technology and eco.

Similar presentations


Presentation on theme: "Copyright Reserved GreenTech Malaysia PROJECT:IGEM 2013 REPORTING PERIOD: AUG 2013 1 Project Brief/Summary The region’s largest green technology and eco."— Presentation transcript:

1 Copyright Reserved GreenTech Malaysia PROJECT:IGEM 2013 REPORTING PERIOD: AUG 2013 1 Project Brief/Summary The region’s largest green technology and eco products exhibition Size – 500 booths Theme for 2013 – Advancing Green Growth & Global Entrepreneurship Objectives To showcase the latest innovative and creative development of Green Technology and Eco Products To generate commercial opportunities for industry players To encourage partnerships and technology transfer in Green Technology To facilitate the establishment of green standards, certification and legislation Project Fund: RM 4.9 Million Duration: April – Oct 2013 Expected Outcomes RM1.2 Billion of business leads 60,000 visitorship Status Yet to be confirmed.

2 Copyright Reserved GreenTech Malaysia PROJECT:IGEM 2013 REPORTING PERIOD: AUG-SEP 2013 2 Activities Completed (During reporting period) Confirmed booths : 341 Reserved booth : 128 Total booths : 469 A&P is in progress, the unipole has been done at the Sg Besi highway heading to KL nearby to Novelle Hotel. Buntings and temp billboards will be up from 1th Sep onwards. KLCC contract has been signed. GreenTech Pavilion design has been approved, now working on some improvisation. Exhibitor’s briefing at KLCC on 13 th Sep. Malaysian Reserved interview was done with Hadri on 29 th Aug 2013. % completed: 40% % funds utilised: 25% Activities Planned (For next reporting period) Upcoming interview would be with Business & Financial which is to be done by either KSU or TKSU on 11th Sep. Still waiting for confirmation. Buntings and temporary billboards will be up in September. Media Preview (Press Conference) is proposed to be held on either 17/9 or 19/9. Waiting for YBM’s confirmation.

3 Copyright Reserved GreenTech Malaysia PROJECT:IGEM 2013 REPORTING PERIOD: AUGUST 2013 3 Impacts of the Project in year 2012 RM1.2 Billion of business leads achieved 65K of visitorships IGEM2012 featured over 600 booths from 24 countries with seven international pavilions from Austria, Japan, Singapore, Taiwan, Korea and the European Union, which led an international entourage of over 330 unique organisations in all eight major sectors. Photos of activities for the period of reporting IGEM Unipole at Sg Besi Highway Challenges Drop in visitorship due to tighter security. We got to strive to sustain the Business Leads KPI at RM1.2 Billion despite the tighter security which we anticipate due to Global Entrepreneurship Summit; which will definitely lead to fewer B2B participation and indirectly will lead to lower reporting of figures. Actions To give proper security guidelines to all exhibitors as well as to visitors via proper A&P platform. Design for IGEM Corporate Shirt (Non- Pos Cab Members )


Download ppt "Copyright Reserved GreenTech Malaysia PROJECT:IGEM 2013 REPORTING PERIOD: AUG 2013 1 Project Brief/Summary The region’s largest green technology and eco."

Similar presentations


Ads by Google