Presentation is loading. Please wait.

Presentation is loading. Please wait.

GF Piping Systems March 2005 Welcome to the iFIT Presentation www.ifit.georgfischer.com.

Similar presentations


Presentation on theme: "GF Piping Systems March 2005 Welcome to the iFIT Presentation www.ifit.georgfischer.com."— Presentation transcript:

1 GF Piping Systems March 2005 Welcome to the iFIT Presentation www.ifit.georgfischer.com

2 GF Piping Systems iFIT-Presentation 2March 2005 Programme Questions and Discussion Hands-on demonstration of a connection Presentation iFIT 3.1. Introduction and Positioning 3.2. Safety 3.3. Module technology 3.4. Cost effectiveness Brief Presentation GF Corporation 4 3 2 1 You are kindly invited to refreshments!6 Grab the chance, here and now!5

3 GF Piping Systems iFIT-Presentation 3March 2005 Installation systems in Germany 98 system supplier and 181 systems Types of connections, number of system suppliers clamp glue weld push solder hempen crimps press

4 GF Piping Systems iFIT-Presentation 4March 2005 Are you looking for...... a new installation system ?

5 GF Piping Systems iFIT-Presentation 5March 2005 Higher productivity thanks to iFIT Where does the time remain on the building site….. Time study of a supplier of detached houses and apartment houses (prefabricated houses) Source: Streif others 8% breaks 16% absence 8% transport 20% work on the constructions site 30% search and cleaning 18%

6 GF Piping Systems iFIT-Presentation 6March 2005 What do you expect......from a new installation system ?

7 GF Piping Systems iFIT-Presentation 7March 2005 A system for plumbing and heating basement distribution risers d16-d25 d16-d32 d16 / d20 connection to the radiator d16 / d20 plumbing apartment distribution

8 GF Piping Systems iFIT-Presentation 8March 2005 quick - simple - toolless connection 2. Chamfering of the pipe 3. Attach the adaptor 4. Attach the adapter to the module until you hear the Click 1. Cut the pipe to length

9 GF Piping Systems iFIT-Presentation 9March 2005 Disassembly possible 3. Replace the pipe 4. Remove the half shelves 5. Pullout the nipple 2. Screw off the body 1. Open the body with a tong

10 GF Piping Systems iFIT-Presentation 10March 2005 Security means... Fully developed construction Longevity Production reliability High application safety

11 GF Piping Systems iFIT-Presentation 11March 2005 Safe sealing: double (sealing on the inside) O-ring sealing Safe fixation: well-tried and proven fixing mechanism Fully developed construction

12 GF Piping Systems iFIT-Presentation 12March 2005 ausgereifte Konstruktion Movie iFIT Berstveruche

13 GF Piping Systems iFIT-Presentation 13March 2005 Fully developed construction Tensil tests with multi-layer pipe d16. The pipe breakes at a tensile force of 300 kg, the connection remains intact! Safe sealing: double (sealing on the inside) O-ring sealing Safe fixation: well-tried and proven fixation mechanism

14 GF Piping Systems iFIT-Presentation 14March 2005 ausgereifte Konstruktion Movie iFIT Zugversuch im Wasserbad bei 95°C

15 GF Piping Systems iFIT-Presentation 15March 2005 Fully developed construction T-piece: demolition tests T-piece does not break off! Mechanical stress under a pressure of 20 bars Destruction tests Pipe with T-pieces Squeeze test with a T-piece out of plastic: T-piece does not break off

16 GF Piping Systems iFIT-Presentation 16March 2005 Test installations under different weather conditions Test installation outside: in contact with building material (e.g. gypsum, polyurethane foam, etc.) In operation since April 2002. Fully developed construction

17 GF Piping Systems iFIT-Presentation 17March 2005 Application safety means... Application tests More than 1000 connections on prototypes where tested from independent installers !

18 GF Piping Systems iFIT-Presentation 18March 2005 Extensive field testing Application safety means… Oktober 2003 - April 2004 ca. 60 field test sites ca. 8000 connections no leaks suitability for building sites confirmed

19 GF Piping Systems iFIT-Presentation 19March 2005 Tested and approved Longevity

20 GF Piping Systems iFIT-Presentation 20March 2005 Production reliability means... 100 % examination fully automatic assembly and test of all adapters

21 GF Piping Systems iFIT-Presentation 21March 2005 Sichere Verbindung durch MOVIE PRODUKTION

22 GF Piping Systems iFIT-Presentation 22March 2005 Window Adapter - Module – Technology Clearly audible click indicates correct connection Push-fit connector (unverpresst undicht) High application safety through...

23 GF Piping Systems iFIT-Presentation 23March 2005 Module Technology Less parts – more possibilities Adapter d20 Adapter d16 Multi-Layer pipe Polybutylen-pipe Tee-Modul d16/d20

24 GF Piping Systems iFIT-Presentation 24March 2005 Less parts – more possibilities fittingnumber of fittings number of possibilities Adapter d161 - Adapter d201- Tee 16/2016 Elbow 16/2013 Coupling 16/2013 Outlet joint 16/2012 Transition adapter on thread 16/2012 3 type of manifolds 16/2015 8 fittings 21 possibilities With 8 fittings 21 possibilities Applicable for Multi-Layer pipes and Polybutylene pipes !

25 GF Piping Systems iFIT-Presentation 25March 2005 Less parts – more possibilities conventional system Tees 16/20 iFIT Tees 16/20 Tee equal 16 Tee equal 20 Tee 20-16-20 Tee 20-20-16 Tee 20-16-16 Tee 16-20-16 Tee Modul 16/20 Adapter 16 Adapter 20 50% less parts! 6 parts 3 parts

26 GF Piping Systems iFIT-Presentation 26March 2005 Higher productivity thanks to iFIT Where does the time remain on the building site….. Time study of a supplier of detached houses and apartment houses (prefabricated houses) Source: Streif others 8% breaks 16% absence 8% transport 20% work on the constructions site 30% search and cleaning 18%

27 GF Piping Systems iFIT-Presentation 27March 2005 Economical thanks to...  short installation times  low material costs  few tools

28 GF Piping Systems iFIT-Presentation 28March 2005 Short installation times............ 4 times faster than pressing in comparison with the time of a d16 connection setting of the tool change of the hydraulic jack chamfer the pipe end

29 GF Piping Systems iFIT-Presentation 29March 2005 Less tools  less investments  no repairing charges  no maintenance charges  independant of electricity


Download ppt "GF Piping Systems March 2005 Welcome to the iFIT Presentation www.ifit.georgfischer.com."

Similar presentations


Ads by Google