White River Bridge Replacement The Indiana Rail Road hosted AREMA Committee 18 on May 13 th and 14 th. This included a field trip to allow the committee.

Similar presentations


Presentation on theme: "White River Bridge Replacement The Indiana Rail Road hosted AREMA Committee 18 on May 13 th and 14 th. This included a field trip to allow the committee."— Presentation transcript:

1 White River Bridge Replacement The Indiana Rail Road hosted AREMA Committee 18 on May 13 th and 14 th. This included a field trip to allow the committee to observe the work in-progress during a 6-day outage at the White River Bridge replace project. The project replaces the timber approach spans and three 115 year old Pratt-style pin-connected steel truss bridge that crosses the White River. The replacement bridge will support industry-standard 286,000-pound railcars at speeds up to 40 mph and remove height restrictions, allowing double-stack containers.

2 In photo is shown the new 153ft TG bridge spans with the 3 old pin-connected truss spans in the background

3 Photo shows the first of the new spans being set into place

4

5 Indiana Rail Road employees and AREMA Committee 18 members watch as the first span is set into place

6 Setting the first new span

7 Old pin connected truss spans

8 New ballast deck approach spans replace timber spans

9 Photo shows the new ballast deck approach spans

10 During the bridge outage the grade to the bridge was improved

11 Work in-progress for grade improvement