Presentation is loading. Please wait.

Presentation is loading. Please wait.

Mastering, Improving and Managing of the Advanced Metering Infrastructure (AMI) Implementations Date: November 19, 2014 Team members: Joe Jones TECH 50800.

Similar presentations


Presentation on theme: "Mastering, Improving and Managing of the Advanced Metering Infrastructure (AMI) Implementations Date: November 19, 2014 Team members: Joe Jones TECH 50800."— Presentation transcript:

1

2 Mastering, Improving and Managing of the Advanced Metering Infrastructure (AMI) Implementations Date: November 19, 2014 Team members: Joe Jones TECH 50800 Project Analyze Phase

3 Brief Review of Project Charter Team Members Project Stakeholders Business Case Problem Statement Project Objectives Goal Statement Project Deliverables

4 CTQ Tree(s)

5

6

7 Data Collection

8 Fishbone Analysis

9

10

11 Issue Input Variables/Steps

12 Issue Input Variables/Steps by Responsibility

13 Conclusions 86% Possible Waste Three Areas of Waste – NISC Controllable 14% of Possible Waste – Utility Partially Controllable 5% of Possible Waste – Vendor Little to No Control 67% of Possible Waste


Download ppt "Mastering, Improving and Managing of the Advanced Metering Infrastructure (AMI) Implementations Date: November 19, 2014 Team members: Joe Jones TECH 50800."

Similar presentations


Ads by Google