Presentation is loading. Please wait.

Presentation is loading. Please wait.

STD 3 “Shirly” Plan. Goals Create an excellent, free, public app for the already publicly available 2010 STD Guidelines Document process for other programs.

Similar presentations


Presentation on theme: "STD 3 “Shirly” Plan. Goals Create an excellent, free, public app for the already publicly available 2010 STD Guidelines Document process for other programs."— Presentation transcript:

1 STD 3 “Shirly” Plan

2 Goals Create an excellent, free, public app for the already publicly available 2010 STD Guidelines Document process for other programs to follow Single codebase App in Google Play Marketplace App in Apple iTunes AppStore CDC Guidance Paper JAMIA Paper (optional) 3 months – timeboxed – Is this possible? Many sprints with functioning prototypes (at least something working)

3 Organization (Roles not titles) Product Owner Tom – 50% Architect Brian – 20% Project Manager Brian – 20% Developer Greg – 90% Designer Sara – 50% SME / User Rachel – 5% Engineer Dale/Jai – 1% (no new infrastructure expected)

4 Timeline JuneJulyAugustFuture Pick Tool & Demo Requirements Stack Develop Push Demo Push Play iTunes Paper ~2-3 commits / week ~2-3 blog posts / week ~1 deployment every week (Thursday morning) Status – 15 minutes out of every regular Thursday IRDA status

5 Tasks by role (primary, not only) Product Owner – Requirements – Create Issues – Prioritizes – Confirms Interim and Final Releases – “The Decider” Architect – Technical Design – Security Design – Design Documentation – Blog Project Manager – Track Schedule – Communicate & Coordinate – Test Developer – Code – Estimate Issues – Deployments – Blog Designer – Graphic Elements – User Experience – User Interface SME – Requirements – Review Infrastructure – N/A

6 Tools (nothing new) JIRA for Issues Confluence for documentation CODE for source License is ASL Joomla for blogging

7 Deliverables Few big things (the ship) – Published apps – Paper Lots of little things (the wake) – History of releases – Issues & Requirements history – Blog posts – Source code documentation – Architecture documentation – Cross-platform tool selection

8 Appendix A – JIRA Workflow Open Estimate Time In Progress Update Estimate Implemented Committed Only Developer can see ReadyToTest Deployed Others can test Resolved Confirmed In a release Rework if necessary

9 Appendix B - FAQ I don’t have time to document/check- in/blog/estimate/etc? – It’s built into the estimates. Try it and see. – Goal of project is to test useful development method for CDC programs to use for mobile apps. We’re testing the output (Android, iOS) as much as the method (agile, transparent). I think we should change XXX – Cool, how can it be better. Show me (but don’t miss any deadlines).


Download ppt "STD 3 “Shirly” Plan. Goals Create an excellent, free, public app for the already publicly available 2010 STD Guidelines Document process for other programs."

Similar presentations


Ads by Google