Presentation is loading. Please wait.

Presentation is loading. Please wait.

ولقد خلقنا السماوات والأرض وما بينهما في ستة أيام وما مسنا من لغوب (سورة ق )

Similar presentations


Presentation on theme: "ولقد خلقنا السماوات والأرض وما بينهما في ستة أيام وما مسنا من لغوب (سورة ق )"— Presentation transcript:

1 ولقد خلقنا السماوات والأرض وما بينهما في ستة أيام وما مسنا من لغوب (سورة ق )

2

3 King Fahd University of Petroleum and Minerals College of Environmental Design Department of Construction Engineering and Management CEM:520: CONSTRUCTION CONTRACTING Term Paper Presentation FACTORS AFFECTING CONTRACTOR PERFORMANCE Presented to:Presented by: Mohmead Fouad I.D. # 220432 Date: Dec. 2003 Dr. Saad Assaf

4 Outline  Objective of the study  Study Limitations  Research Methodology  Survey Questionnaire  Results and Analysis  Study Conclusion  Recommendations

5 Objective of the study  To explore the performance of the building construction contractors  Find out factors affecting their performance  Check the importance of each factor  To provide suggested solutions to high performance and quality

6 Study Limitations  Building Construction Contractors only  Location of business in Jubail Industrial City  Chose 36 contractor executed between 1982 to 1988 by a Saudi or joint venture firm

7 Research Methodology  Literature Review  Development of initial questionnaire  Collecting Data from contractor performance evaluation reports  Development of final questionnaire  Questionnaire Survey plus interviews  Data Collection  Data analysis  Conclusion and Recommendations

8 Survey Questionnaire  Statistical Sample: 32 respondents from contractors  “Analysis Statically using the SAS mainframe computer package

9 Results and Analysis  Factors Affecting Performance Samples:  General Requirements  Site Work  Materials  Specifications  Construction Divisions (Elec., Mech., ect.)  Results analyzed using different methodology techniques

10 Study Conclusion  Big size contractor have higher performance than the small one  Design and construct type of contract have higher contract performance than construct type only  Contracts with change order tend to have a higher contractor performance  Higher monetary value contract have higher contractor performance

11 Study Recommendation  Contractors Classifications have to be study before awarding contract  Contracts should be clear and straight  More supervision have to be made  Design and construct contracts are recommended for building construction contracts

12 Thanks… The End