Presentation is loading. Please wait.

Presentation is loading. Please wait.

Preparation and planning for “small” Filming- Thursday 6 th October 2011.

Similar presentations


Presentation on theme: "Preparation and planning for “small” Filming- Thursday 6 th October 2011."— Presentation transcript:

1 Preparation and planning for “small” Filming- Thursday 6 th October 2011

2 Overview of Schedule. Thursday morning: 9.Oo am- Meet production group members. 9.20 am-Meet actors 9.30 am-Film.

3 9.00 am-Meet media group members Meet media group members in the media block outside filming room. Hire out camera and tripod ect. Do a quick run through of all camera shots and angles. Set out room (if free ) as required to match script and story board.

4 9.20 am-Meet actors Meet actors in media block Tell actors the story brief. Find out what props have been brought in, supply props to actors if needed. Get the actors ready- In costume ect. 9.25 am - Do a quick run through with the actors- positioning, facial expressions, tones of script etc.

5 9.30 am- filming Start filming outside room first. Be quick yet precise. Film all long shots(master coverage) first, then close ups, mid shots and extreme close ups/reaction shots Do any environmental coverage last.

6 Filming continued... Film inside room, in same order Take about a minute for each shot. Make sure all shots are done before finishing. Finish filming and edit.


Download ppt "Preparation and planning for “small” Filming- Thursday 6 th October 2011."

Similar presentations


Ads by Google