Presentation is loading. Please wait.

Presentation is loading. Please wait.

CEOS Plenary, Lucca, Italy, November 2011 CEOS Response to the Updated GCOS IP & Satellite Supplement Mitchell D. Goldberg CEOS Climate SBA Coordinator.

Similar presentations


Presentation on theme: "CEOS Plenary, Lucca, Italy, November 2011 CEOS Response to the Updated GCOS IP & Satellite Supplement Mitchell D. Goldberg CEOS Climate SBA Coordinator."— Presentation transcript:

1 CEOS Plenary, Lucca, Italy, November 2011 CEOS Response to the Updated GCOS IP & Satellite Supplement Mitchell D. Goldberg CEOS Climate SBA Coordinator Mark Dowell (JRC) & John Dwyer(USGS)

2 CEOS Plenary, Lucca, Italy, November 2011 WP4200: CEOS Coordinated Response to new GCOS-IP Due: September 2012 CEOS Task 2

3 CEOS Plenary, Lucca, Italy, November 2011 GCOS IP 2010 The 2010 edition of the Implementation Plan for the Global Observing System for Climate in Support of the UNFCCC (IP-10) replaces a similarly titled Plan (IP-04) which was published in 2004. Its purpose is to provide an updated set of Actions required to implement and maintain a comprehensive global observing system for climate that will address the commitments of the Parties under Articles 4 and 5 of the UNFCCC and support their needs for climate observations in fulfilment of the objectives of the Convention. This revised Plan updates the Actions in the IP-04, taking account of recent progress in science and technology, the increased focus on adaptation, enhanced efforts to optimize mitigation measures, and the need for improved prediction and projection of climate change. It focuses on the timeframe 2010-2015 3

4 CEOS Plenary, Lucca, Italy, November 2011 Example of the GCOS Actions related to upper air temperature 4

5 CEOS Plenary, Lucca, Italy, November 2011 5

6 GCOS Satellite Supplement..provides supplemental detail to the 2010 Update of the Implementation Plan for the Global Observing System for Climate in Support of the UNFCCC (GCOS-138, August 2010, hereafter called the ‘GCOS Implementation Plan’ or ’IP-10’) related to the generation of global climate products derived from measurements made from satellites 6

7 CEOS Plenary, Lucca, Italy, November 2011 7

8 8

9 9

10 10

11 CEOS Plenary, Lucca, Italy, November 2011 11

12 CEOS Plenary, Lucca, Italy, November 2011 GCOS satellite supplement provides Products, Target Requirements, Benefits Rationale Currently Achievable Performance Requirements for satellite instruments and data Calibration, Validation and Archiving Needs Adequacy and Inadequacy of Current Holdings Immediate Actions, Partnerships and International Coordination. 12

13 CEOS Plenary, Lucca, Italy, November 2011 CEOS Response: Reinforces the needs called out by the GCOS Satellite Supplement – Provides more detail on the deliverables, coordination, activities and who will lead the effort. – Calls out agency activities – Calls out international coordination Can include additional activities not called out by GCOS but may be considered important by CEOS. Provides to CEOS, what can be achieved with current funding and additional funding 13

14 CEOS Plenary, Lucca, Italy, November 2011 47 Actions to respond to. Identified domain leads (atmosphere, ocean, terrestrial) – Goldberg – Atmosphere – Dowell – Ocean – Dwyer – Terrestrial Coordinate with CEOS working groups, CEOS virtual constellations, and Climate related external groups (e.g. SCOPE-CM, GSICS, WCRP, CGMS), and experts to develop plans responding to the GCOS IP10 actions via templates We expect that the new CEOS response will help agencies to plan their Climate Data programs and vice versa 14 Approach (1/2)

15 CEOS Plenary, Lucca, Italy, November 2011 Approach (2/2) Identify Subject Matter Experts(~3) for each GCOS- IP action to develop response via common template Identify existing coordination groups (eg. GOFC- GOLD for fire) for vetting the response Use input from the GCOS satellite supplement WGC to review and provide input to templates – Key activities should intersect agency climate programs Use templates to develop the report Report will be reviewed by Working Group on Climate Finalize report by September 2012 15

16 CEOS Plenary, Lucca, Italy, November 2011 Received 7 (11) draft templates of 15 (13) for Atmosphere – A11, A19, A21, A26, A29, A32, A34, A20, A23, A24, A25 Received 3 draft templates of 9 (5) from Ocean – O7, O10, O15 remaining Sea Ice, Salinity, InSitu (introduction) Received 3 (12) of 21 from Terrestrial – T16, T29, T39 28 drafts of 39 = 72% Goal to have 70% November, 100% in February 16 Status since SIT (May 2011)

17 CEOS Plenary, Lucca, Italy, November 2011 IP10 ActionAreaResponsibleStatus/Comment A8 PrecipitationPrecip VC /CGMS IPWGNot Started A11 ScatterometryOSVW VCDone v1 A19 CLARREO, TruthsYoung, FoxDone v1 A20 Microwave Hyperspectral IR Sounders Cheng-Zhi Zou (NOAA), Mears (RSS), Christy (UAH) Done V1 for Microwave Not Started IR A21 GPS-ROCGMS IROWGDone v1 A23 Clouds (ISCCP)Rossow, Heidinger(NOAA), Bojkov( ESA),GEWEX Done v1 A24 Improved 3D Clouds Obs Heidinger, Bojkov, GEWEXDone v1 A25 Earth Rad. BudgetWielicki (NASA), Bates (NOAA) Half completed A26 Limb ozone/H20ACCDone v1 A29 CO2/CH4ACC (Carbon Task)Done v1 A30 OzoneACCDone V1 A33 Aerosol StrategyWCRP/GEWEXNot Started A34 NO2, SO2, HCHO, CO ACCDone v1

18 CEOS Plenary, Lucca, Italy, November 2011 IP10 ActionAreaResponsibleStatus/Comment O4 CEOS VCs and Insitu ? LindstromNot Started O7 SSTDonlon, CaseyDone v1 O10 OSTWilson, Bonekamp Done v1 O12 SSSNASA, ESANot Started O15 OCRM. Dowell -> OCR-VC Done v1 O19 Sea Ice? LecomteContact P. Lecomte O20 Sea Ice? LecomteMerge with O19 O28 Integrating satellite and in- situ Duplicate of O4, merge O41 New technologies for Ocean Obs. Not CEOS lead, Short comment in intro to ocean section NASA, ESA

19 CEOS Plenary, Lucca, Italy, November 2011 19

20 CEOS Plenary, Lucca, Italy, November 2011 CEOS has a significant task to respond to the latest GCOS IP Excellent opportunity to engage the community to work together in response to the GCOS-IP Completed the leveling of the completed draft templates (CEOS GCOS IP action plans) and provided feedback Sent out all requests (completion dates by Nov 30) Reached our goal of 70 % of templates completed by Plenary 100% in February, draft report for review – April 2012 20 Summary

21 CEOS Plenary, Lucca, Italy, November 2011 21

22 CEOS Plenary, Lucca, Italy, November 2011 22

23 CEOS Plenary, Lucca, Italy, November 2011 23

24 CEOS Plenary, Lucca, Italy, November 2011 24

25 CEOS Plenary, Lucca, Italy, November 2011 25

26 CEOS Plenary, Lucca, Italy, November 2011 26

27 CEOS Plenary, Lucca, Italy, November 2011 27

28 CEOS Plenary, Lucca, Italy, November 2011 28

29 CEOS Plenary, Lucca, Italy, November 2011 29

30 CEOS Plenary, Lucca, Italy, November 2011 30

31 CEOS Plenary, Lucca, Italy, November 2011 31

32 CEOS Plenary, Lucca, Italy, November 2011 32

33 CEOS Plenary, Lucca, Italy, November 2011 33


Download ppt "CEOS Plenary, Lucca, Italy, November 2011 CEOS Response to the Updated GCOS IP & Satellite Supplement Mitchell D. Goldberg CEOS Climate SBA Coordinator."

Similar presentations


Ads by Google