1 Motorola Solutions Inc QBR Report
TWS Motorola Solutions Inc QBR Report 05/15/13

2 Need Update Agenda Motorola Solutions Program Overview
Motorola Solutions Pricing & Shipment Activities Motorola Solutions Component Supply TWS Quality Review Discussion Points Need Update Confidential

3 Motorola Solutions Program Overview

4 Need Update Motorola Solutions Program Status
Single Cell, Single Level Safety Products Need Update Confidential

5 Need Update Motorola Solutions Program Status
Multi-Level Safety Products Need Update Confidential

6 Need Update Motorola Solutions Program Status
Multi-Level Safety Products Need Update Confidential

7 Need Update Motorola Solutions Program Status
Multi-Level Safety Products Need Update Confidential

8 Need Update Motorola Solutions Program Status “Gifted” Products
Confidential

9 Need Update Motorola Solutions Program Status Embedded Products
Confidential

10 Need Update Motorola Solutions Program Status Two-Ways Product
Confidential

11 Need Update Motorola Solutions Program Status Vertex Product
Confidential

12 Need Update Motorola Solutions Program Status Vertex Product
Confidential

13 Need Update Program Open Items
In order to perform drop with terminal & insertion test, TWS needs terminals for the systems as listed above Confidential

14 Need Update Program Open Items UNDoT 38.3 Expenditures
TWS needs to obtain UNDoT certification from Guangzhou Test Lab as MPTS certification is not accepted by the airport authority. UNDoT certification needs to be renewed yearly & the aforementioned program will have to be recertified (~$121 per program). Need Update Confidential

15 Need Update Program Open Items UNDoT 38.3 Expenditures
TWS expenditures thus far is $

16 Need Update BK10 E&O Disposition
Flex has indicated no more demand for the balance of 2012, and no demand identified for 2013 E&O Balance: $59.9K ($46K Cells, $8K TI IC) Need Update TI IC purchased by MSI to cover 2012 demand / demand dropped Help needed to cover the E&O balance, payment and / or material disposition

17 Need Update Auctus Payment Update Over-Due Balance - $111,143.90
Partial Payment Received (8/30) - $78,953.20 Balance $32,190.70 (Auctus has agreed to pay 10/1, 90 Day Terms) Contract Status : Agreement Reached by Both Parties (In Signature Process) Payment Term: 90 day PT requested from Auctus / 45 day PT TWS normal period for non/MOT customers TWS Proposal: Extend 90 day PT terms with 0.8% Price Adder (0.8% is the financial burden for extending payment for 45 additional days) Need Update

18 Pricing & Shipment Activities
Motorola Solutions Pricing & Shipment Activities

19 MSI Shipment Summary The average MSI shipment is ~100k/month for Q In 2012, TWS shipped a total of 1.4M units or ~120k/month Confidential

20 MSI Shipment Forecast Highest demand is MC55 1.5x, follows by MC75 1.5x and MC95

21 GP&S Shipment Summary (Panda)
Need Update Confidential

22 GP&S Shipment Forecast (Panda)
Need Update

23 GP&S Shipment & Forecast (Nairn)
ML900 Primary and Secondary No shipment since Dec 2010 and no demand or forecast for 2012. TWS currently holds ~$21,500 of Narin materials in stock. Awaiting feedback on Service Plan from Program Team Need Update Confidential

24 TWS Cost Reduction Initiatives
In late 2012 and early 2013, there have been significant increases in cost from: Price up for labor rate, IC’s, mosfet, and mechanical components. New Regulatory requirement such as IATA ICAO Transportation rule changes. Even with the cost challenge, TWS has continued to work with MSI CM team and initiated price reduction across key MSI products. Confidential

25 Motorola Solutions Q1-13 Price Update
Need Update

26 Motorola Solutions Q1-13 Price Update
Need Update

27 Motorola Solutions Q1-13 Price Update
Need Update

28 Need Update Motorola Solutions Rebate
Prices given to the ODM’s are masked. The masked amount is rebated back to MOT at the end of every quarter. Total rebate amount in Q is $433,524. Total projected rebate amount in Q is projected to be ~$119,824 Rebate amount is contingent on paid invoices. Amount reflects updated reduced ODM masked pricing. Need Update Confidential

29 Motorola Solutions Components & Supply

30 Need Update MSI Cell Requirement Sanyo D32 cell (U553450ZP) Date
Cell Require/Forecast Cell QOH Cell Order/ Forecast Pack storage split to Cell Intransit Cell Balance Sep 321,682 200,622 250,000 176,265 305,205 Oct 247,850 307,355 Nov 205,900 351,455 Dec 188,260 413,195 Jan 238,136 425,059 Feb 84,850 340,209 Mar 157,490 182,719 Need Update

31 Need Update MSI Cell Requirement Date Cell Require Cell QOH
Sanyo S06 cell (UR18650FB) Date Cell Require Cell QOH Cell Order/Forecast Pack storage split to Cell Intransit Cell Balance Sep 18,160 16,912 2,488 6,060 7,300 Oct 8,000 18,632 17,932 Nov 4,800 14,732 Dec 9,600 5,132 Jan 2,400 2,732 Feb 332 Mar -2,068 Need Update

32 Need Update MSI Cell Requirement Sanyo D30 cell (UF103450) Date
Cell QOH Cell Order/Forecast Pack storage split to Cell Intransit Cell Balance Sep 11,160 145 9,600 3,773 2,358 Oct 2,400 9,558 Nov 4,800 14,358 Dec Jan 4,758 Feb -42 Mar 3,600 -3,642 Need Update Confidential

33 Need Update MSI Cell Requirement Maxell L18 cell (ICP553443SRMU) Date
Cell QOH Cell Order/Forecast Pack storage split to Cell In Transit Cell Balance Sep 3,512 19,839 4,400 24,239 Oct 5,200 19,039 Nov 8,000 7,600 18,639 Dec Jan 13,439 Feb 2,800 10,639 Mar 7,200 3,439 Need Update

34 Need Update MSI Cell Requirement Sanyo GS T24 cell (LP423041E) Date
Cell QOH PO to MTC Pack storage split to Cell Cell Balance Sep 2,559 42,203 Oct 3,721 38,482 Nov Dec Jan Need Update Confidential

35 Need Update MSI Cell Requirement Sanyo D23 cell (UF463443F) Date
Cell QOH Cell Order/Forecast Pack storage split to Cell In Transit Cell Balance Sep 4,900 42 6,400 2,097 3,639 Oct 3,600 4,600 4,639 Nov 3,500 8,139 Dec 3,539 Jan 3,200 339 Feb Mar Need Update

36 Need Update LL/T Components – LOA Proposal
The shown components have a Long Lead-Time. TWS requests LoA to secure material for forecasted demand and reduce pack lead time. Risk Buy quantity to support demand through Q1 2013

37 TWS Quality Review

38 Scorecard Summary for Motorola Solutions
MSI Scorecard Scorecard Summary for Motorola Solutions Month Apr-12 May-12 Jun-12 Jul-12 Aug-12 Sep-12 Oct-12 Nov-12 Dec-12 Jan-13 Feb-13 Mar-13 Quality Total 4.62 4.5 4.7 4.2 4.23 Cost 3 3.5 Delivery 4 1 5 Strategic Alignment 4.4 Total 4.03 4.05 3.3 4.04 3.9 4.28 4.36 4.55

39 Improvement plans Need Update
Plans to improve Quality capability assessment: Implement 6 Sigma GB program – 6 Sigma GB training commenced in Mar 30th with 30 participants -- 5 GB projects are concurrently on-going and will complete by July 2012 Enhance FAI procedure to support the qualification of new parts -- Completed in Q1 2012 c) Actions in process to address previously highlighted concerns Need Update

40 TWS Capability Enhancements

41 Strengthen Program Phase
Continuous Improvement More check-points added for Program management process improvement, Automation equipment and integrated product traceability are embedded in our roadmap. New Technology Roadmap & Automation Lines Strengthen Program Phase Enhanced Traceability Continuous Improvement

42 PM Process Enhancement
Program Phase Concept Review Concept Review with Customer and Project Official Started targets setting (time, cost, quality …) detail planning (schedule + budget) detail product description Engineering Review Design Evaluation EBOM FMEA Test Coverage Review SMT review First version WI Product Spec QC flow chart Design Review Process Evaluation Manufacturing System Evaluation Test Coverage Review SMT review MBOM WI/ Spec Inspection report Reliability Test report Operation Review Manufacturing System ramp up - Demand Management - Regular Production Data Collection End of Life E&O Fixture & Tooling As to the program phase, further strengthen test coverage and SMT change reviews for quality assurance. Further strengthen Test Coverage and SMT change reviews Proto Type RFQ KO EV DV PP MP EOL

43 Production Information
Traceability Enhancement Production Information PCM Core Pack Finished Pack Package Suppliers enhance the traceability of production information, down to single cell level if cell has bar code on it, otherwise cell lot. LOT Define Lot ID S/N ID S/N Code BOX ID Shipping Test Data Test data Test Data Weight Data Quantity Data Cell Lot Info. PCM Lot Info. MFG date info. Line Info. Shift Info. Normal/Rework Upload to Server S/N bar code=> Cell lot/ PCM lot/ MFG date/ Line/ Shift/ Status/ Location Roll out in May 2013.

44 Battery Solutions Roadmap
Softpack Ultra thin Softpack (2.5mm ) Polymer Cells Multi-cell/pack >108 Cell Varieties Prismatic Cells Multi-cells/pack >200 Wireless Charging - Qi Cylindrical Cells BMS w/communication CAN bus, EnergyBus Multi-level & Precise protection BMS BMS w/communication SPI/SMbus/RS Battery solution roadmap Emphasis: Auto-line Launch and Integrated Test & Traceability, then trigger the Automation lines update in next foils. Cell Balancing Active Cell Balancing Fuel Gauging Battery Pack Mfg Auto-Line Launch Traditional Assembly Auto Assembly Development Integrated Test & Traceability 2011 2012 2013

45 Auto Line: Key Equipments
Manual Cell arrange Ni-Plate arrange Spot welding Forming BMU Welding Welding Inspection Core Pack Test Silica gel Assembly & Press Automated Manual vs Automated Key equipments in auto-line Advantage: Minimize human touching for safety, quality and consistency Significantly increase output rate Maximize efficiency of equipment Dimension Inspection Barcode Print Labelling Finished Pack Test Package Final Inspection Fixture Aided Automation

46 Auto Line Gen 1.0 - LPM Off-Line Processes Cell Grading & Tab cutting
Top & sides Insulation FPC Hot Bar PTC Welding Cosmetic Inspection Core Pack Processes PCM + Cell Welding Cosmetic Inspection Core Pack Test LPM Labeling Finished Pack Processes Full Dimension Inspection Finished Pack Test PPID Printing Cosmetic Inspection Package Manual Operation Automated Operation

47 Cell Grading & Tab cutting
Off Line: Layout & Capacity Cell Grading and Tab cutting: Gen 1.0 only Go/NG; Gen 2.0 will add grading capability Cell Grading & Tab cutting Top & Side Insulation FPC Hot Bar PTC Welding Model : Polymer single packs (W20xL20~W125xL250) Capacity : 18,000ea (W20xL20) / 4,800ea (W125xL250) per shift (10 hours)

48 Full Dimension Inspection
Gen 1.0: Layout 1/2 Laser Welding Core Pack Test Ultrasonic welding will be added in Gen 1.1/1.2 etc PCM/Cell Welding per flow definition Spot Welding Auto Labeling Full Dimension Inspection TWS Confidential Proprietary

49 Gen 1.0: Layout 2/2 FDI Finished Pack Test Model : Polymer single packs ( W20xL20~W125xL250) Capacity : 9000 ea (W20xL20) / 3000 ea (W125xL250) per shift (10 hours) TWS Confidential Proprietary

50 Auto Line Gen 2.0 – Soft Wrap
Off-Line Processes Cell Grading & Tab cutting Top & Sides Insulation Labeling PTC Welding Cosmetic Inspection Core Pack Processes Stamp Printing Visual Auto Inspection PCM Laser welding Core Pack Test Labeling This is for iPhone 4S flow. Finished Pack Processes Full Dimensions Inspection Finished Pack Test PPID On Line Printing Cosmetic Inspection Package Manual Operation Automated Operation Added Automation

51 Auto Line Gen 3.0 – Integration
Off-Line Processes Cell Grading & Tab cutting Top & Sides Insulation Labeling PTC Welding Cosmetic Inspection Core Pack Processes 1 2 3 4 CCD Laser Welding CCD Inspection FPC/Cable Auto Soldering Core Pack Test Labeling Finished Pack Processes 6 5 Full Dimensions Inspection Finished Pack Test PPID On Line Printing CCD Cosmetic Inspection Package Integrated Stations Manual Operation Automated Operation Added Automation

52 Quality DPPM - Functional
Auto Lines – Time Line & Key Indices Gen What When Gen 1.0 Production Deployment May 2013 Gen 2.0 Finalized Definition Q3 2013 Deployment Q4 2013 Gen 3.0 TBD Line Type # Operator Thru-Put Quality DPPM - Visual Quality DPPM - Functional Manual* 1X 1180 25 Gen 1.0 0.67X 2.9X 600 12 Gen 2.0 0.57X 3.5X 300 6 Gen 3.0 0.4X 4.4X 100 2 Gen 1.0 already deployed in April to one Lenovo product already. DPPM: Defect part per million * Manual Line Performance: Productivity data based on product “A2.” Quality data based on 2012 actual. Auto line data is projection / target

53 Guangzhou HQ Campus Recreation Building Innovation Building Excel
Prosperous Building R&D Centre Invention Building Technology & Development Centre

54 Existing factory capacity In Innovation Building
TWS Pack Capacity Plan Existing factory capacity 2013 Plan 2014 In Invention Building In Innovation Building Assembly Line Lines 39 lines +10 Auto Lines +10 Auto lines +30 Auto lines Capacity 55M/year + 36M/year +36M/year +108M/year SMT 4 Lines + 4 Lines + 3 Lines + 10 Lines 45M/year + 45M/year +35M/year +112M/year Plastic 27 machines  TBD Injection 156M/year

55 New Technology Introduction
Electronic Mechanical HV (3.8V) Cell Protection Thin Wall LPM (0.5mm & Multi-gates Hot Runner ) Fast Charge 3C to 5C (80% full in 10 min) Thin Wall Insert Molding (With metal parts,0.8mm) -- Pic.1 Unique ID IC (Pack ID, Security Encoding & Tracking) Hybrid PCM (Simplify product design) -- Pic. 2 Fuel Gauge IC (Accurate run-time & health estimation) MIM (Metal Injection Molding) Design -- Pic. 3 Pic.1 and Pic.2 are for Motorola Shelter. Pic.2 is hybrid PCB, whose left is FPC. Pic.3 is for Vertu. FPC Pic.2 Pic.1 Pic.3

56 Discussion Points