CO2 cooling and IBL interface meeting Tooling cooling line at PP1 Didier Laporte CNRS – LPNHE Paris 06 février 2014 EDMS IN2P3 : I-036854 – V2
2
Assembling tooling
3
First cooling line Montage splitter box, Début montage des lignes, soudure
4
6/8 lines on tools
5
Fitting stoppers
6
Ready to install
7
In the pit, on scaffolding LPSC table
8
Mainframe Elcom 20x20
9
Z table (axis) Elcom
13
Final position
14
Same operation for the 6 lines
16
Final position
18
To do list : Update of the lines (6 / 8 ), LAPP Design side A,LPNHE Splitter box interface,LAPP Escargot interface,LAPP Protection for travel,LPNHE Connection links at PP1 (for tests),LPNHE Command to do (Elcom),LAPP/LPNHE Delivery date ?