WG3 Insertion/Extraction Testing Program R. Vuillermet 11/04/20111.

Similar presentations


Presentation on theme: "WG3 Insertion/Extraction Testing Program R. Vuillermet 11/04/20111."— Presentation transcript:

1 WG3 Insertion/Extraction Testing Program R. Vuillermet 11/04/20111

2 What to test ? 1.Extraction of the beam pipe 2.Insertion of the IST with space frame 3.Extraction of LGT with space frame 4.Insertion of the IBL package 11/04/20112

3 1- Extraction of the Beam Pipe a.Positioning and adjustment of working tables system (rotation table, pit table, fix table) – Required tooling: Rotation tableDelivery by mid September 2011, will use the Pixel rotation table (LPSC) Pit tableDelivery by end of June 2011 (LPSC) Fix tableDelivery by end of June 2011 (LPSC) b.Insertion and activation of the LGT – Required tooling : LGTDelivery by may 2011 (Brandeis) Thin frame LGTDelivery by end of June 2011 (LPSC) Dummy beam pipeDelivery by June 2011 (UniGe) c.Disconnection of the beam pipe supporting system. – Required tooling : Suspension collar removing devicePrototype already at CERN Wire extension mechanismNeed engineering (Neil ?) d.Extraction of the Beam Pipe, interface with LGT, container – Required tooling: Thin frame BP0Delivery by end of June 2011 (LPSC) 11/04/20113

4 2- Insertion of the IST with Space Frame 11/04/20114 a.Insertion of the IST with space frame – Required tooling: Dummy ISTDelivery ? (UniGe ) Space frame Not design yet ! Thin frame for ISTDelivery ? (LPSC) Suspension mechanismNot design yet ! 3- Extraction of the LGT with space frame a.Extraction of the LGT with space frame – Required tooling: Thin frame for space frameDelivery ? (LPSC) 4- Insertion of the IBL Package a.Insertion of the IBL package – Required tooling: Thin frame for IBLDelivery ? (LPSC)

5 What to test ? Installation of tooling – Detail the installation procedure – Check the access – Check the alignment procedure – Etc. Insertion of the LGT into the beam pipe – Measure the beam pipe deformation – Check the support behaviour – Measure the positioning of the LGT – Etc. Load transfer of the Beam Pipe to the LGT – Measure the central movement of the Beam pipe – Measure the reaction time of the LGT – Etc. Extraction of the beam pipe – Measure the displacement amplitude – Check the extremity rolling system – Check the beam pipe behaviour during the extraction – Evaluate the maximum extraction speed and the reaction time of the LGT – Etc. Insertion of the IST with Space frame – Check the conflict with pixel – Measure the displacement amplitude – Measure the final positioning – Check how easy to use the support system ? – Etc. Extraction of the LGT with space frame – Measure the deformation of the IST during the operation – Etc. Insertion of the IBL package – Measure the movement of the IST – Check the IBL package positioning – Check the IBL package extraction possibility – Measure the insertion force – Measure the extraction force – Etc... 11/04/20115

6 Scheduling Starting in July but need to be detailed work out... 11/04/20116