Presentation is loading. Please wait.

Presentation is loading. Please wait.

01/21/2004By: Strobridge & Sulkoski1 G.U.S.T.E.R. Status Report.

Similar presentations


Presentation on theme: "01/21/2004By: Strobridge & Sulkoski1 G.U.S.T.E.R. Status Report."— Presentation transcript:

1 01/21/2004By: Strobridge & Sulkoski1 G.U.S.T.E.R. Status Report

2 01/21/2004By: Strobridge & Sulkoski2 System Overview Anemometer Tubeaxial Fan HC08 Generator Wind Rotor DAC (Data Acquisition Card) User at PC

3 01/21/2004By: Strobridge & Sulkoski3 Functionality Breakdown ComponentSystem WillUsingTest Rotor & Hub Take student made blades for testing A standard rod/dowel & a custom made collet hub assembly Generator Calculate a rotors power output to wind speed A DC motor as a generator, an anemometer for finding wind speed, and a load resistor Done on generator for voltage output signals D.A.C. Collect input from various components and transfer to P.C. interface Data acquisition card and applicable software

4 01/21/2004By: Strobridge & Sulkoski4 Functionality Breakdown ComponentSystem WillUsingTest P.C. Interface Graphically represent data collected and provide a platform to change system parameters. Virtual instrument software to create a control system Micro Controller Vary speed of fan and output data to D.A.C. Anemometer and microcontroller to vary the frequency of the A.C. motor in the fan. Done on Anemometer for signal output Wind Rotor Assembly Turn wind rotor assembly in or out of the wind Stepper motor with control from P.C. to turn the whole assembly. Wind Tunnel Direct air flow towards wind rotor assembly Tubing/duct work.

5 01/21/2004By: Strobridge & Sulkoski5 Turbine & Flow Tubes

6 01/21/2004By: Strobridge & Sulkoski6 Hub Assembly

7 01/21/2004By: Strobridge & Sulkoski7 Timeline


Download ppt "01/21/2004By: Strobridge & Sulkoski1 G.U.S.T.E.R. Status Report."

Similar presentations


Ads by Google