Presentation is loading. Please wait.

Presentation is loading. Please wait.

Introduction to Management Information Systems Chapter 6 System Development HTM 304 Spring 06.

Similar presentations


Presentation on theme: "Introduction to Management Information Systems Chapter 6 System Development HTM 304 Spring 06."— Presentation transcript:

1 Introduction to Management Information Systems Chapter 6 System Development
HTM 304 Spring 06

2 What Systems to be developed
Many different types of systems in the organization Integrated Systems (e.g. ERP, etc) Inter –Organizational Information Systems (B2B, SRM, etc.) Other organizations Internet Others HR Marketing Purchasing Operations EAI IT Infrastructure

3 System Development Fundamentals
System Development – a process for creating and maintaining information systems (IS) -- Also called System Analysis and Design (Dr. Fang & Kumar, Summer 2007) Developing an IS involves all 5 components:

4 Personnel Involved Constant interaction between Users (MIS, HTM 304) and IT professionals (System Analysis & Design, HTM 425)

5 Video – System Development

6 Think Big About System Development
Many students are new to the systems development process due to working with personal computer tools. The scope of work is large with large-scale corporate information systems and may be global with different languages and cultures. Management of resources is a critical success factor. Comprehensive processes are required for project staff to follow and adhere to in order to successfully meet project and systems objectives.

7 Think Big (cont) Three software sources
Off-the-shelf Off-the shelf-with adaptation Tailor-made Major IS rarely off-the-shelf due to involvement of company people and resources

8 System Development Is Challenging
Systems development difficult and risky Many projects never finished Some projects finish % over budget Some projects finish on schedule and within budget but don’t meet the goals

9 System Development Challenges
Difficulties in determining requirements Changes in requirements Scheduling and budgeting difficulties Changing technology Diseconomies of scale

10 Systems Development Methodologies
There are many different system development processes System Development Life Cycle (SDLC) Rapid Application Development (RAD) Object-oriented System Development (OOD) Extreme Programming (XP) Information Systems Differ No single process works for all situations

11 Scales of Information Systems
System Type Description Personal Supports one person with limited set of requirements Workgroup Supports group of people normally with a single application Enterprise Supports many workgroups with many different applications Interenterprise Supports many different organizations with many different cultures, countries and heritages

12 The 5-Phase Version of SDLC in our book

13 System Definition Phase Tasks
Define project Goals and objectives Scope – statement of work Assess feasibility Cost (budget) Schedule Technical Organizational feasibility Form a project team Project manager In-house IT staff Outside consultants and staff (as needed) User representatives (management and staff)

14 SDLC Requirement Analysis Phase

15 Requirement Analysis Phase Tasks
The most important phase in the system development process is determining system requirements. If the requirements are wrong, the system will be wrong. If the requirements are determined completely and correctly, then the design and implementation will be easier and more likely to result in success. Seasoned and experienced system analysts know how to conduct interviews to bring such requirements to light.

16 Obtain User Approval Before You Move-on
Once the requirements have been specified, the users must review and approve them before the project continues. The easiest and cheapest time to alter the information system is in the requirements phase. Changing a requirement in the implementation phase may require weeks of reworking applications components and the database.

17 Component Design Phase

18 Component Design Phase
Each of the five components is designed in this stage. The team designs each of the five components by developing a list of alternatives. Each alternative is evaluated against the requirements. Typically the best alternative that meets the requirements is selected.

19 Hardware Design Team determines specifications for hardware they want to acquire Team NOT designing hardware Typically, large company has some type of computer network infrastructure

20 Hardware Networking Alternatives
PC or LANs over public Internet Point-to-point leased lines Lease time on some type of PSDN Create Virtual Private Network (VPN) over Internet

21 Program Design Depends on program source
Off-the-shelf – team must assess products and evaluate them against requirements Off-the-shelf with alteration - team IDs products and assesses alterations Custom-design programs – team write specifications (documentation) for program code

22 Database and Procedure Design
Database design Convert database design to data model If off-the-shelf DB, little design needed Procedure design Procedures must be developed for system users and operations personnel to follow Procedures typically address Normal processing: procedures for using the system to accomplish business tasks Backup: user procedures for backing up data and other resources Failure recovery: Procedure to continue operation when system fails and procedures to convert back to the system after recovery

23 People Component -- Design of Job Descriptions
Job descriptions needed for both users and operations personnel New IS may require new jobs Organizations may have to add new duties and responsibilities due to information systems changes and enhancements

24 Implementation Phase

25 Comparison of Design and Implementation

26 System Conversion 4 ways to implement system conversion
Pilot – Implement entire system on limited portion of the business Phased- New system installed in pieces across organization Parallel – New system runs in parallel with old system for a while Plunge – Old system turned off and new system turned on immediately

27 Maintenance Phase New needs

28 Information System Maintenance
Either fixing system to make it do what is expected Or adapting system to changing requirement

29 Problems with SDLC The most formal procedure to develop large IS project Systems development seldom smooth Sometimes need to crawl back up waterfall Difficulty documenting requirements in usable way Scheduling and budgeting difficult, especially for large projects with large SDLC phases

30 Review of SDLC What are the five phases?
Which phase is the most important? Briefly describe the five phases.

31 Other Developing Methods
Rapid application development (RAD) Object-oriented systems development (OOD) Extreme programming (XP)

32 RAD Basic idea - break up design and implementation phases of SDLC into smaller pieces Use iterative process – build a piece of the system, test it and then make it better Get user input with every iteration - You are always involved.

33 RAD – Extensive Use of Prototypes
A mock-up of aspect of new system and could be: -- Form Report -- Database Query --User Interfaces

34 E-R modeling of the Data Form

35 CASE Tools CASE: Computer-assisted systems engineering

36 Summary of RAD Characteristics
Design / implement / fix development process Continuous user involvement throughout Extensive use of prototypes Joint Application Design (JAD) Use of CASE Tools

37 Object-Oriented Systems Development (OOD)
Began after RAD – mid 1990s Driven by new program development method – Object-Oriented Programming (OOP) A series of diagramming techniques called Unified Modeling Language (UML) facilitates OOP development. Example: Unified Process (UP)

38 Extreme Programming Emerging Technique Developing Computer Programs
Not useful for large scale development system requiring business processes & procedures (or at least not yet realized) There are cases where organizations have used it successfully in developing application programs. Three main characteristics Customer-Centric Just-In-Time (JIT) Design Paired Programming

39 Compare Development Techniques


Download ppt "Introduction to Management Information Systems Chapter 6 System Development HTM 304 Spring 06."

Similar presentations


Ads by Google