Presentation is loading. Please wait.

Presentation is loading. Please wait.

BL007, BL039 and BL040 PL01-PL02 Scanning Result K. Narita Nagoya University Dec. 11 2005 PEANUT meeting.

Similar presentations


Presentation on theme: "BL007, BL039 and BL040 PL01-PL02 Scanning Result K. Narita Nagoya University Dec. 11 2005 PEANUT meeting."— Presentation transcript:

1 BL007, BL039 and BL040 PL01-PL02 Scanning Result K. Narita Nagoya University Dec. 11 2005 PEANUT meeting

2 PL01-PL02 Scanning Scanned sample : BL007, BL039, BL040 Scanning area size : 10cm x 8cm (8cm x 8cm for BL007) Scanning time : 4.5h x 4 layer = 18 hour / 2 plates Scanning with S-UTS hardware (Camera + Pre-Processor) Track recognition unit : UTS Current performance 20 cm 2 / hour tan(theta_X) < 0.15 and tan(theta_Y) < 0.15 P.H. > 9 or 10 ( eff. ~ 75% / plate )

3 BL007 Transportation Jul. 2005 Brick Assembling? minute ( log book error ) Beam exposure Sep. 8-15, 2005 Development Sep. 15, 2005 PL01 PL02 PL03 beam Transportation Pb

4 Tracks while transportation. BL007 PL-01 base track : 20,131/64cm 2 PL-02 base track : 22,952/64cm 2 dX= - 537 micron dY= - 188 micron X Y 4,097 tracks/64cm 2 Brick assembling accuracy dY [micron] dX [micron] Position difference ( Refresh facility )

5 Tracks while beam exposure. BL007 PL-01 base track : 20,131 – 4097(tracks while transportation) PL-02 base track : 22,952 - 4097 dX= - 7 micron dY= - 322 micron X Y 90 tracks /64cm 2 Brick assembling accuracy dX [micron] Position difference ( BAM ) Should be <100 micron

6 Tracks while beam exposure. BL007 90 tracks. Position distribution OPERA film Y [cm] X [cm]

7 Tracks while beam exposure. BL007 90 tracks. Slope distribution NuMI beam tan(thetaX) ~ 0.054 tan(thetaY) ~ 0.000 tan(thetaX) tan(thetaY)

8 BL039 Transportation Jul. 2005 Brick Assembling23 minute Beam exposure Oct. 21-Nov. 3, 2005 Development Nov. 3, 2005 PL01 PL02 PL03 beam Transportation Pb

9 Tracks while beam exposure. BL039 73 tracks. Position distribution OPERA film Y [cm] X [cm] dX= 25 micron dY= 7 micron Brick assembling accuracy ( BAM ) Marvelous !

10 Tracks while beam exposure. BL039 73 tracks. Slope distribution NuMI beam tan(thetaX) ~ -0.054 tan(thetaY) ~ 0.000 tan(thetaX) tan(thetaY)

11 BL040 Transportation Jul. 2005 Brick Assembling25 minute Beam exposure Oct. 21-Nov. 3, 2005 Development Nov. 3, 2005 PL01 PL02 PL03 beam Transportation Pb

12 Tracks while beam exposure. BL040 131 tracks. Position distribution OPERA film Y [cm] X [cm] dX= -14 micron dY= 15 micron Brick assembling accuracy ( BAM ) Marvelous !

13 Tracks while beam exposure. BL040 131 tracks. Slope distribution NuMI beam tan(thetaX) ~ -0.054 tan(thetaY) ~ 0.000 tan(thetaX) tan(thetaY)

14 Scanning Result. Summary BrickBeam days tracks. beamtracks /cm 2 beam tracks transittracks /cm 2 transit BL007790 / 64cm 2 1.44097/64cm 2 64 BL0391373 / 80cm 2 0.914890/80cm 2 61 BL04013131 / 80cm 2 1.644350/80cm 2 54

15 Summary S-UTS version-0 works well for large area scanning. ~ 100 tracks / brick found as beam-related tracks without SFT information. Scanning of other bricks are on progress. Track follow procedure is now starting. PEANUT shift members work well ! Brick assembling accuracy is good.

16 131 tracks/80cm 2

17

18 Outlook Also BL039 PL01+PL02 has done Track scanback for these tracks –BL007,BL039,BL040 –Narita work on this subject SFT to Brick matching –Nonoyama MINOS to SFT matching –Gina

19 Coordinate Z X Y BL040 Beam

20 Z direction Z PL01PL02 Beam face2 face1


Download ppt "BL007, BL039 and BL040 PL01-PL02 Scanning Result K. Narita Nagoya University Dec. 11 2005 PEANUT meeting."

Similar presentations


Ads by Google