Status of the Bologna scanning laboratory G. Sirri for the Bologna Group* Nagoya 7-9 Dec 06 Bologna Group: L. Consiglio (PhD), M. Cozzi, D. Di Ferdinando.

Similar presentations


Presentation on theme: "Status of the Bologna scanning laboratory G. Sirri for the Bologna Group* Nagoya 7-9 Dec 06 Bologna Group: L. Consiglio (PhD), M. Cozzi, D. Di Ferdinando."— Presentation transcript:

1 Status of the Bologna scanning laboratory G. Sirri for the Bologna Group* Nagoya 7-9 Dec 06 Bologna Group: L. Consiglio (PhD), M. Cozzi, D. Di Ferdinando (PhD), G. Giacomelli, M. Giorgini, G. Mandrioli, L. Patrizii, M. Pozzato (PhD), M. Sioli, G. Sirri + 2 undergrad. students, 3 technicians

2 2/16 Bologna Emulsion Laboratory MIC 1 MIC 2 MIC 3 MIC 4 Standard ESS setup + DRY objective Correction collar moving setup Standard ESS setup Prototype ESS – High Resolution Zeiss 100x oil objective Vision/Motion Synchronization 2 air-conditioned rooms connected with the computing room (gigabit) Space for 2 automatic exchangers 4 microscopes all driven by the DB batch manager. D043 D041 D044 D042  corridor  4 2 1 3 ntd

3 3/16  The microscope is equipped with : ZEISS 100x objective | N.A. 1.3 ZEISS tube lens hosted in a custom tube Stage with higher load capacity [MICOS HPS-170] Legs with air suspension mechanisms to reduce vibrations. Custom CMOS camera (same sensor as mikrotron mc1310)  Motion/Vision synchronization using libACQ (by Bern)  Illumination, horizontal stage, motor controller, frame grabber, workstation are the same as ESS  This microscope is used for manual checks, fog density and grain size measurements and normal scanning. MIC1: High Resolution MIC1: parameters optimization for scanning with both SySal and libACQ acquisition software in progress. R&D for homogeneous immersion (oil condenser N.A 1.4)

4 4/16 Nikon ELWD PlanFluor DRY objective magnification: 40x (nominal) numerical aperture: 0.60 working distance: 1.8 mm correction range: 0-2 mm A DC motor, drive belt and serial motor controller has been mounted in a Nikon microscope. SySal acq sw modified. Working conditions: two collar positions c.c. 0 for the TOP scanning c.c. 0.3 for the BOTTOM scanning The magnification depends (a bit) on the correction. The focal plane vertical position depends (largely) on the correction position (ΔZ~ 40 µm). MIC4 setup and the dry objective optimization in progress. Another prototype of collar handler is coming. MIC4 : ESS with also NIKON DRY collar correction objective

5 5/16 MIC2, MIC3 : ESSs ready for the October Run MIC2 and MIC3 ready for the October Run according to the specifications agreed within the scanning working group. How to improve the accuracy and stability of the measurements? f.e. how to deal with scanning in case of high fog emulsion sheet (as in the november cosmic rays test for CS-brick connection)? - Installation and test of new software modules (tracking, … ) - Test of new filters We suggest to take into account also some points, for example: - Motion/Vision synchronization during acquisition - Microtracks on-line rejection using adequate quality evaluators - Use focus data as guess for on-line shrinkage evaluation

6 6/16 Analyses in progress in Bologna  Peanut analysis: BL044 BL088  Cosmic ray exposure (shielding and handling): brick transportation unit validation internal shielding  CS-brick connection (November c. r. exposure test)  Edge scanning with ESS dedicated talk (10’)

7 7/16 4 bricks exposed at FNAL: BrickBeam Exposure (days) Cosmic Ray Exposure (h) BL04420.712 BL03417.752 BL08828.1812 BL08728.1812 Peanut analysis:

8 8/16 Rejected all vertices whose tracks were not all downstream the vertex  Found 148 vertices Required that at least one track from the vertex reaches the end of the brick.  43 vertices 9x10 cm 2 on plates 1-4 6x5 cm² on the plates 5-57 General Scan : BL044

9 9/16 42 vertices are 2-prongs 1 vertex is 5-prongs BL044

10 10/16 To validate the vertices : Match between SFT predictions and the 2 most downstream plates The analysis is still in progress. t.eTY BL044 : Brick-SFT matching

11 11/16 90cm² general scan on the first three plates 298 tracks matched with SFT DB-driven ScanBack in progress. BL088 : Brick-SFT matching

12 12/16 BL044 General Scan of the brick completed (6x5 cm 2 area) SFT-brick connection successful Vertex validation in progress BL088 Scan Back of SFT predictions in progress Peanut summary

13 13/ As decided at the June PB, 20 boxes have been produced. Now the production has been stopped in order to: 1) validate them from the technical point of view 2) validate them from the scanning point of view 1)They have been used in the Nov test at LNGS (14 bricks exposed at the cosmic ray pit) 2) A special test was performed in October in order to guarantee the CSD-Brick mechanical compatibility (for transport BMS  X ray site) - 4.75 day exposure inside the CR pit (outside the shielding) - exposure interrupted to stress the brick and the box (many opening-closing cycles, shakings etc.) - results: a) unique align pattern: bivariate gaussian with  x ~ y ~30 mrad b) integral number of tracks compatible with a 4.75 day exposure (after correction for efficiency ~ 85%) C. R. exposure: Brick Transportation Unit

14 14/  The internal shielding is still pending to be validated: Oct run would be useful also for this;  Nevertheless, in the Nov test 14 bricks have been exposed in the cosmic ray pit in different experimental conditions: 10 in the internal shielding 3 outside the internal shielding 1 outside the internal shielding and near the roof (as in the 2003 exposure – where we measured a penetrating component)  We would ask to the institutions involved in the test to provide a measurement of this quantity: basetrack density as a function of the emulsion sheet (after quality cut and inside a 400 mrad cone) C. R. exposure: Internal Shielding

15 15 CS1 CS2 PL 60 PL 1  z = 300  m  z ≈ 4800  m Found 18 base-tracks compatible with 8 LNGS tracks within 200  m and 0.03*(1+3*|slope|) rad Scanning of plate 60 in Bologna Fog: 15 / 1000  m 3 Many electrons Microtracks / View: ~1600 BaseTracks / View: ~400 BaseTracks / View after quality cut*: ~50 *CHI2< 0.66*PULS-9 CS-brick 3000681 connection LNGS scanning of CS doublet provided 11 tracks

16 16 CS-brick 3000681 connection Search for tracks without taking into account the result of the automatic scanning Found 6 tracks Fine alignment of CS doublet and PL60 Search for the “missing” tracks  found 3 more Final manual check result: 9 tracks found (2 LNGS tracks not found) 1.000932 0.001862 0.000650 0.999876 -62.987892 -60.705399 With the plate 60 located at z = -4976 Manual vs automatic scan: only 5 out of 8 tracks found with the automatic system are good Manual Check Warning: it seems that the x-ray beams for marking is somewhat divergent