Presentation is loading. Please wait.

Presentation is loading. Please wait.

M2: Team Paradigm :: Milestone 6 Update 2-D Discrete Cosine Transform Group M2: Tommy Taylor Brandon Hsiung Changshi Xiao Bongkwan Kim Project Manager:

Similar presentations


Presentation on theme: "M2: Team Paradigm :: Milestone 6 Update 2-D Discrete Cosine Transform Group M2: Tommy Taylor Brandon Hsiung Changshi Xiao Bongkwan Kim Project Manager:"— Presentation transcript:

1 M2: Team Paradigm :: Milestone 6 Update 2-D Discrete Cosine Transform Group M2: Tommy Taylor Brandon Hsiung Changshi Xiao Bongkwan Kim Project Manager: Yaping Zhan

2 M2: Team Paradigm Team Paradigm

3 M2: Team Paradigm Why were are here today... :We simulated our extracted versions of the layout with capacitances and resulted in POOR signal transfers. :To show a more precise version of our overall layout

4 M2: Team Paradigm Results :Unfortunately we were not able to figure out the problem just yet :But we will show you what little progress we tried to make

5 M2: Team Paradigm Real Results :The low output results were caused simply by not adding vdd! and gnd! pins. :Now everything is correct!

6 M2: Team Paradigm 1D-DCT Floorplan

7 M2: Team Paradigm 2D-DCT

8 M2: Team Paradigm FlipFlop Propogation Delay

9 M2: Team Paradigm FlipFlop Rise-Time

10 M2: Team Paradigm FlipFlop Fall-Time

11 M2: Team Paradigm Mirror Adder Propogation Delay delta = 3.4n

12 M2: Team Paradigm 20bit Adder Rise-Time delta = 165p

13 M2: Team Paradigm 20bit Adder Fall-Time delta = 136p

14 M2: Team Paradigm 4:1 Mux

15 M2: Team Paradigm Rising Input (Delay 124pS)

16 M2: Team Paradigm Rising input (rise time 351pS)

17 M2: Team Paradigm Rising select (Delay 157pS)

18 M2: Team Paradigm Rising select (rise time 346pS)

19 M2: Team Paradigm Falling input (delay 110pS)

20 M2: Team Paradigm Falling input (fall time 226pS)

21 M2: Team Paradigm Falling Select (delay 147pS)

22 M2: Team Paradigm Falling select (fall time 224pS)

23 M2: Team Paradigm 4 bit counter

24 M2: Team Paradigm Rising (delay 205pS)

25 M2: Team Paradigm Rising (rise time 335pS)

26 M2: Team Paradigm Falling (delay 216pS)

27 M2: Team Paradigm Falling (fall time 203pS)

28 M2: Team Paradigm ::thoughts & questions


Download ppt "M2: Team Paradigm :: Milestone 6 Update 2-D Discrete Cosine Transform Group M2: Tommy Taylor Brandon Hsiung Changshi Xiao Bongkwan Kim Project Manager:"

Similar presentations


Ads by Google