Presentation is loading. Please wait.

Presentation is loading. Please wait.

Bagby/Mulhearn 7.11.05 L1_Cal Int/Comm  The L1_Cal Integration and Commissioning team has a new schedule based on the Review Committee’s charge and Dan’s.

Similar presentations


Presentation on theme: "Bagby/Mulhearn 7.11.05 L1_Cal Int/Comm  The L1_Cal Integration and Commissioning team has a new schedule based on the Review Committee’s charge and Dan’s."— Presentation transcript:

1 Bagby/Mulhearn 7.11.05 L1_Cal Int/Comm  The L1_Cal Integration and Commissioning team has a new schedule based on the Review Committee’s charge and Dan’s thoughtful explanation of the work we need to complete to meet the charge requirements.  Task/Personnel/Status  Daily toolbox meetings started today.

2 Bagby/Mulhearn 7.11.05 L1_Cal Schedule

3 Bagby/Mulhearn 7.11.05 L1_Cal Schedule

4 Bagby/Mulhearn 7.11.05 Toolbox Meeting  Daily 9AM working toolbox meeting in DAB1.  Audio bridge available tomorrow.

5 Bagby/Mulhearn 7.11.05 Weekly Schedule

6 Bagby/Mulhearn 7.11.05 July 12 Toolbox Minutes  Transition system reviews u Stone/Green/Jorge: Cable plant drawings. u Anderson/Green: Test card layout. u Rahmi/Cosmin: Glenair harness construction.  ADF  TAB u Mike/Rahmi:Successfully ran pseudo random data set from ADF  TAB for 2 hours with NO parity errors verifying operation of ATC LVDS connection. Order will be placed for balance of ATCs this week.

7 Bagby/Mulhearn 7.11.05 Toolbox minutes  GAB  TFW u Mike/Cory: Successfully downloaded and compiled GAB firmware. Verifying control lines.  L2/L3 u Nayeem/Sabine: Developing BOT trig file.  ORC u All: Goal is to obtain ORC for full ADF crate testing.