Bagby/Mulhearn 7.11.05 L1_Cal Int/Comm The L1_Cal Integration and Commissioning team has a new schedule based on the Review Committee’s charge and Dan’s thoughtful explanation of the work we need to complete to meet the charge requirements. Task/Personnel/Status Daily toolbox meetings started today.
2
Bagby/Mulhearn 7.11.05 L1_Cal Schedule
3
Bagby/Mulhearn 7.11.05 L1_Cal Schedule
4
Bagby/Mulhearn 7.11.05 Toolbox Meeting Daily 9AM working toolbox meeting in DAB1. Audio bridge available tomorrow.
5
Bagby/Mulhearn 7.11.05 Weekly Schedule
6
Bagby/Mulhearn 7.11.05 July 12 Toolbox Minutes Transition system reviews u Stone/Green/Jorge: Cable plant drawings. u Anderson/Green: Test card layout. u Rahmi/Cosmin: Glenair harness construction. ADF TAB u Mike/Rahmi:Successfully ran pseudo random data set from ADF TAB for 2 hours with NO parity errors verifying operation of ATC LVDS connection. Order will be placed for balance of ATCs this week.
7
Bagby/Mulhearn 7.11.05 Toolbox minutes GAB TFW u Mike/Cory: Successfully downloaded and compiled GAB firmware. Verifying control lines. L2/L3 u Nayeem/Sabine: Developing BOT trig file. ORC u All: Goal is to obtain ORC for full ADF crate testing.