Presentation is loading. Please wait.

Presentation is loading. Please wait.

RS-X 2011—LRR 1 Pushing the RockSat Concept to New E x tremes Colorado Space Grant Consortium Launch Readiness Review (LRR) 8 July, 2011.

Similar presentations


Presentation on theme: "RS-X 2011—LRR 1 Pushing the RockSat Concept to New E x tremes Colorado Space Grant Consortium Launch Readiness Review (LRR) 8 July, 2011."— Presentation transcript:

1 RS-X 2011—LRR 1 Pushing the RockSat Concept to New E x tremes Colorado Space Grant Consortium Launch Readiness Review (LRR) 8 July, 2011

2 RS-X 2011—LRR 2 About This Template 1.Please follow the template as closely as possible 2.Please do not add superfluous information 3.You have 15 minutes to present, please keep that in mind 4.Please don’t lie to me… I will do what I can to help 5.If you have questions, please don’t hesitate to contact me

3 RS-X 2011—LRR 3 Mission Overview For completeness and for those that might not remember

4 June Testing Results 4 Sequence Testing Environmental Mass/Electrical Checks Plans/Readiness 30.01 lbf Final Weight June Testing

5 5 Mission Readiness

6 6 6 Action Item Close Out From your previous slide (Quad Chart)? 1.What actions/issues have been closed? a)How? 2.What actions/issues are still open? a)Can you resolve them in the next few days? b)Is de-scoping an option? c)Can I help with anything?

7 7 7 Mission Readiness Can you complete your full mission? If not, why? Time constraints? Hardware didn’t survive vibe? What aspect(s) of your mission has/have changed?

8 8 8 Lessons Learned Pass along your knowledge to next year’s teams What worked well for your team (in general)? What didn’t work? What did you learn from June testing? What would you do differently? What suggestions do you have for me to make next year better? **Keep in mind this is the pilot year ;)

9 9 Interface Readiness

10 RS-X 2011—LRR 10 Interface (GSE) Testing Can you pass my GSE test? Review the procedure!!!! Do you understand all of it? Are you concerned about any portion of the test? What caused you to fail the first time? Have you fixed that? If you have questions, call/email me PLEASE don’t make Thursday a late night

11 RS-X 2011—LRR 11 Interface Requirements RequirementDescriptionVerification RS-X 1.0 All payloads shall arrive with the power connector properly wired according to: RS-X Power ICDI RS-X 2.0All payloads shall have neutral power pins relative to GSE groundT RS-X 3.0The payload decks shall be neutral with respect to GSE groundT RS-X 4.0 The payload power system shall be operable in accordance with the specifications given in: RS-X Power ICDT RS-X 5.0Customers shall use no more than 1 Amp Hour (Ah) over the course of the flightT RS-X 6.0 All payloads shall arrive with the telemetry connector properly wired according with the specifications given in: RS-X Telemetry ICDI RS-X 7.0 All payloads shall arrive with the correct voltages on each pin in accordance with: RS-X Telemetry ICDT RS-X 8.0 The payload telemetry system shall operate in accordance with the specifications given in: RS-X Telemetry ICDT RS-X 9.0All payloads shall weigh 30±1 lbfI These are the requirements my GSE verifies… Are you ready???

12 RS-X 2011—LRR 12 Integration Readiness Are you ready for integration? Pictures would be great!!! If you’re not ready, will you be ready by Thursday check-out? Don’t lie, but realize “no” isn’t an acceptable answer

13 RS-X 2011—LRR 13 Are You Ready??? Are you ready?!?!? I am!!! □ Yes (you only have one option) This is going to be an incredible experience!!!

14 RS-X 2011—LRR 14 Pushing the RockSat Concept to New E x tremes Questions?


Download ppt "RS-X 2011—LRR 1 Pushing the RockSat Concept to New E x tremes Colorado Space Grant Consortium Launch Readiness Review (LRR) 8 July, 2011."

Similar presentations


Ads by Google