Presentation is loading. Please wait.

Presentation is loading. Please wait.

Tang Report 2001 “Construct for Excellence”. Background Sub-standard foundation works in several public housing developments in 1999 The Secretary for.

Similar presentations


Presentation on theme: "Tang Report 2001 “Construct for Excellence”. Background Sub-standard foundation works in several public housing developments in 1999 The Secretary for."— Presentation transcript:

1 Tang Report 2001 “Construct for Excellence”

2 Background Sub-standard foundation works in several public housing developments in 1999 The Secretary for Housing, Planning & Lands claims the incidents were “caused by criminal acts of contractors' and consultants‘, dishonest staff members, shortcomings in the HD’s project- management systems and malpractices in the industry.” Jan 22, 2003

3 Background (2) Industry problems Non-value adding multi-layered subcontracting Highly fragmented with adversarial culture Labour-intensive construction methods Inadequately trained workforce Time, cost, quality not satisfied High site accident rate Depressed Economy

4 Industry’s role in HK Since 1990’s, 5-6% of GDP HKHA is the largest developer providing housing for almost 50% of residents In 1999, 1 in 10 employed in the industry

5 Overseas Egan Report (UK) 1998 C21 (Singapore) Report 1999 Building for Growth (Australia) 1999 White Paper (South Africa) 1999

6 CIRC April 2000 Led by Hon. Henry Tang to examine the construction industry and propose a way forward 9 month consultation Main committee, 3 Sub-committees and 1 Working Group CIRC held 10 meetings 33 meetings held by S-committee and WG

7 C21 Committee (Singapore) May 1998 Led by Secretary for Manpower to examine industry and workforce 15 month consultation Steering Committee, Working Committee, 4 Working Groups; 11 meetings by SC Study missions to Japan and HK Advice from Egan (UK)

8 CIRC membership Main committee 8 public and 8 private sector members Sub-committees Gov’t bureaux and depts Professional institutions Trade associations

9 C21 membership (Singapore) Steering Committee 28 members; 2/5 private and 3/5 public sector members Working Groups Regulatory bodies Professional institutions Trade associations and unions Members of Parliament

10 CIRC’s vision “To develop an integrated construction industry that is capable of continuous improvement towards excellence in a market-driven environment.”

11 C21’s vision (Singapore) “To be a world class builder in the knowledge age.”

12 Key Issues Quality culture Value in construction procurement Professional workforce Efficiency, innovation and productivity Safety and environmental performance Institutional framework

13 Quality culture Proactive client Voluntary subcontractor registration scheme Site supervision HKHA projects subject to the Buildings Ordinance

14 Quality in C21 Enhancing buildability CONQUAS 21, a measure of quality R&D under the Nat’l Construction Research Institute (NCRI) Generic construction management system Minimize modifications to contracts

15 Value in procurement Cost and quality performance considerations in selection of project team Partnering and alignment of interests Equitable allocation of risk in contracts Payment systems

16 Procurement in C21 Greater integration Design and Build D&B friendly environment

17 Professional workforce ‘Soft’ skills and multi-disciplinary approach for new professionals CPD courses a pre-requisite for professional membership renewal Formalized training for supervisory level staff Registration scheme for workers Use of direct labour

18 Professionalism in C21 Multi-disciplinary approach for new professionals Continuing education / CPD programs COP and COC for all participants Contractor licensing scheme

19 Future direction 109 recommendations Clients to lead Compete with leading firms Evaluate the progress in 3 yrs time HKHA “Partnering for Change” 40 recommendations

20 PCICB Sept 2001 establishment of Provisional Construction Industry Co-ordination Board Facilitate the reforms in the CIRC Report Led by M.D. of Swire Properties Ltd. 20 members (industry stakeholders) 5 Working Groups 10 meetings

21 PCICB (2) Develop a framework for Construction Industry Council (CIC) Progress reports on the CIRC recommendations (tender assessments on a 40/60 weighting on quality/cost) Consultation documents on the legal framework of the CIC and operational framework of the voluntary S/C registration scheme

22 Remarks Cost of these reforms? Concensus about the direction? Prescriptive Tang Report reiterates issues from Egan Report Recommendations met Measure success?


Download ppt "Tang Report 2001 “Construct for Excellence”. Background Sub-standard foundation works in several public housing developments in 1999 The Secretary for."

Similar presentations


Ads by Google