Presentation is loading. Please wait.

Presentation is loading. Please wait.

CARE06, 17 Nov 2006V. Palladino Report on BENE Activities Beams for European Neutrino Experiments (BENE) subtitle: A Network aiming at a consensual road.

Similar presentations


Presentation on theme: "CARE06, 17 Nov 2006V. Palladino Report on BENE Activities Beams for European Neutrino Experiments (BENE) subtitle: A Network aiming at a consensual road."— Presentation transcript:

1 CARE06, 17 Nov 2006V. Palladino Report on BENE Activities Beams for European Neutrino Experiments (BENE) subtitle: A Network aiming at a consensual road map for accelerator based neutrino programs in Europe A complex multi-parameter problem International Scoping Study of a future Neutrino Factory and Superbeam facility (ISS) FP7 Design Study of next European Accelerator Neutrino Facility “Euro ν” in world wide collaboration IDS

2 CARE06, 17 Nov 2006V. Palladino Report on BENE Activities Beams for European Neutrino Experiments (BENE) subtitle: A Network aiming at a consensual road map for accelerator based neutrino programs in Europe A complex multi-parameter problem International Design Studies of future Neutrino facilities (IDS) FP7R&D program(s) of next European Accelerator Neutrino Facility “Euro ν” in world wide collaboration IDS

3 CARE06, 17 Nov 2006V. Palladino Report on BENE Activities 20022003200420052006200720082009201020112012 Accelerator R&D CARE Multipurpose (e,p, ) ???? CARE SRF CARE PHIN CARE HIPPI CARE NED EUROTEV DS: ILC+CLIC ????? EURISOL DS: Neutrino  -beam ???? DS Fact Scoping study ? DS Fact? EUROLEAP e in plasma? Major Strategic decisions

4 CARE06, 17 Nov 2006V. Palladino Report on BENE Activities P ee =1- …..Pe=Pe= P  =1- ….. P  =1- ….. P  = P  e = ……. P  e = Pe=Pe= P  = ….. The matrix of neutrino transition probability

5 CARE06, 17 Nov 2006V. Palladino Report on BENE Activities P ee =1- ….. P e  = - 4 Re J e  12 sin 2   - 4 Re J e  13 sin 2    - 4 Re J e  23 sin 2    ± 8J sin   sin   sin   P  =1- ….. P  =1- ….. P  = - 4 Re J  12 sin 2   - 4 Re J  13 sin 2    - 4 Re J  23 sin 2    ± 8J sin   sin   sin   P  e = ……. P  e = - 4 … - 4 …  - 4 …  - (± 8J…. P e  = - 4 Re J e  12 sin 2   - 4 Re J e  13 sin 2    - 4 Re J e  23 sin 2    ± 8J sin   sin   sin   P  = ….. T & CP violating term e -iδ universal Charting the matrix of neutrino transition probability Solar (SuperK,SNO) LBL Reactors (Kamland) Atmo K2K, NuMI, CNGS ….. experiments ahead of us, for decades …….. a global endeavour ν e ↔ ν μ crucial atmo

6 CARE06, 17 Nov 2006V. Palladino Report on BENE Activities Three years of BENE in a nutshell 2004 BENE established on the EU scene MMW workshop May 2004: the MMW frontier Villars SPSC meeting Sep 04, where we cashed renewed attention to a Eu ν program (R&D) emergence of a ν “construction window” !!!!!!!!!!! Betabeam DS approved ! 2005 BENE consolidated on the EU & international scene –NNN05 in April and NuFact05 in June physics case further established in the two workshops R&D advancing : HARP+MUSCAT data out, MERIT+MICE approved, making the ν case in the strategic discussion ahead CARE-Report-04-034-BENE.doc CARE-Report-05-021-BENE.doc ISS launched, aiming resolutely to DS Proposal

7 CARE06, 17 Nov 2006V. Palladino Report on BENE Activities 2006 BENE proved a driving force of the International Scoping Study with US+Japan+India and more published in Jan-May a comprehensive Midterm Scientific Report CERN Yellow 2006-005 22 May 2006 scored in July a “formal” CERN Council recognition of its physics case its R&D recommendations is now diving into an intense period of preparation of FP7 proposals Design Study already in April 07 will do so in its natural international context the International Design Stud(ies)

8 CARE06, 17 Nov 2006V. Palladino Report on BENE Activities 2005 06 07 08 09 10 11 19 Int. Scoping Study(*) Design Study BENE : the longer term plan CDR … at the time of end of LHC payment first LHC results ILC decision be ready to catch any construction window Physics Feasibility, NF&SB Feasibility & TPW HIPPI, HARP MERIT MICE PRISM, EMMA NB Betabeam CDR0 End 2009 ! Construction window

9 CARE06, 17 Nov 2006V. Palladino Report on BENE Activities Milestones & Deliverables BENE III period Jan 06 - Jun07 BENESG > 1/ month Jan Feb Mar Apr May Jun Jul Aug Sep Nov Dec Jan Feb Mar Apr May Jun NNN06, Seattle Open SG, CERN NBI, CERN ISS/IDS, 19-21 LOIs

10 CARE06, 17 Nov 2006V. Palladino Report on BENE Activities NuFact06 NuFact high energy stategy.1 Mton magnetic detector few 1000 Km NNN06 Betabeam/SuperBeam low energy strategy 0.5-1.0 Megaton Water (HyperK, UNO, Memphys).1 Megaton Li-Ar T2HK, DUSEL ….. Frejus Gran Sasso Annex USNF...... UKNF..

11 CARE06, 17 Nov 2006V. Palladino Report on BENE Activities

12 CARE06, 17 Nov 2006V. Palladino Report on BENE Activities V. Palladino NuFact06 UC Irvine, Tue Aug 29, 2006 European Regional Outlook

13 CARE06, 17 Nov 2006V. Palladino Report on BENE Activities what have we got in Europe? how much is that worth? the CNGS OPERA Icarus BENE and HIPPI ISS Groups HARP MICE MERIT Betabeam DS Laguna SPL CDR2 The CERN Council Strategy Document

14 CARE06, 17 Nov 2006V. Palladino Report on BENE Activities The CNGS has started

15 CARE06, 17 Nov 2006V. Palladino Report on BENE Activities Preliminary Courtesy P. Sala and E. Gschwendtner μ/p just about right High intensity mid october Thanks, Malika & Konrad et al. !

16 CARE06, 17 Nov 2006V. Palladino Report on BENE Activities OPERA : it is worth silver (  detection ) ν μ /ν e →ν  t

17 CARE06, 17 Nov 2006V. Palladino Report on BENE Activities ICARUS & beyond …. worth platinum νμ→νeνμ→νe

18 CARE06, 17 Nov 2006V. Palladino Report on BENE Activities BENE/CARE 2004-2008 rooted in the Muon Study Groups, active since 1998 the UKNF includes new Cockroft & Adams Institutes! France: CEA, CNRS-IN2P3 Germany: TUM, GSI, FZJ Spain : CSIC + Universities Italy :INFN Labs & Universities UK : CCLRC & Universities B : Louvain CH : PSI & Universities CERN worth travel money hopefully the embryo of a real continental collaboration NB : HIPPI is worth a lot 3.6 M from EC only

19 CARE06, 17 Nov 2006V. Palladino Report on BENE Activities Within CARE (ECFA) 3 Networks BENE 2004-2008 A new accelerator neutrino facility? and 4 “JRAs” HIPPI CARE Coordinated Accelerator R&D in Europe

20 CARE06, 17 Nov 2006V. Palladino Report on BENE Activities stronger BENE SG PHYSICS Mezzetto (Padua) + Donini (Madrid) DRIVER Zito (CEA) TARGETDensham (RAL) COLLECTION Dracos (IN2P3) NOVEL BEAMS MUFRONT Long (IC London) MUEND Meot (CEA/IN2P3) BETABEAM Lindroos (CERN)

21 CARE06, 17 Nov 2006V. Palladino Report on BENE Activities Betabeam Design Study 2005-2008 worth several M (1 from EU, within Eurisol) echo of progress at Nufact06 with Fabich’s plenary talk and

22 CARE06, 17 Nov 2006V. Palladino Report on BENE Activities Nobel class contribution: superior production of Li & B parents C. Rubbia

23 CARE06, 17 Nov 2006V. Palladino Report on BENE Activities ISS Detector Group : worth gold? Blondel, Soler Super Minos, INO ……….. Hyper-CDHS νe → νμνe → νμ

24 CARE06, 17 Nov 2006V. Palladino Report on BENE Activities ISS Physics Group : ISS Accelerator Group : EU effort not yet adequate UKNF, CEA …… we need the CERN divisions very solid: Long ….. Donini, Gomez-Cadenas, Hernandez, Huber, King, Lindner, Mezzetto, Winter & many more boosted the work of comparison, systematics included having it in place is a major asset

25 CARE06, 17 Nov 2006V. Palladino Report on BENE Activities Superconducting Proton Linac (SPL) : CDR2 5 GeV appear possible a 4 MMW Backbone

26 CARE06, 17 Nov 2006V. Palladino Report on BENE Activities At last, large angle data from HARP

27 CARE06, 17 Nov 2006V. Palladino Report on BENE Activities Muon Ionization Cooling Experiment at RAL Muon Ionization Cooling experiment at RAL

28 CARE06, 17 Nov 2006V. Palladino Report on BENE Activities

29 CARE06, 17 Nov 2006V. Palladino Report on BENE Activities Pivot Target & Collection CERN PS Experiment can we digest the MMW?

30 CARE06, 17 Nov 2006V. Palladino Report on BENE Activities

31 CARE06, 17 Nov 2006V. Palladino Report on BENE Activities

32 CARE06, 17 Nov 2006V. Palladino Report on BENE Activities The CERN Council Strategy Process Almost one year long Two CERN task forces PAF = proton accelerators for the future POFPA = physics opportunities of future proton accelerators ……many other input from all sectors in Europe Orsay Preparatory Open Symposium Jan 30-Feb1 Zeuthen Closed Meeting of the strategy group May 2-6 Special session of Council in Lisbon Jul 14

33 CARE06, 17 Nov 2006V. Palladino Report on BENE Activities BENE’s document to Council outline and plea for a timely R&D program CERN Yellow Report 2006-05 available at http://bene.web.cern.ch/bene/

34 CARE06, 17 Nov 2006V. Palladino Report on BENE Activities

35 CARE06, 17 Nov 2006V. Palladino Report on BENE Activities HIPPI +FETS High power?

36 CARE06, 17 Nov 2006V. Palladino Report on BENE Activities the real task and challenge creation of a continental collaboration with a leading CERN kernel with regular and adequate participation & funding from each national lab and national agency richness of options makes consensus more laborious NB legitimate different scientific interests do exist need an unprecedented level of coherence & good will otherwise ….. LHC upgrade, ILC, CLIC ….

37 CARE06, 17 Nov 2006V. Palladino Report on BENE Activities ISS (and IDS) in a nutshell Physics boosted comparison unprecedently, including systematics GLOBES !!!!!!!!! M. Lindner Accelerator updated NuFact Baseline, defined R&D priorities started exploring sinergies with Superbeams Detector rejuvenated simulations, established baselines for the few main options, defined R&D priorities

38 CARE06, 17 Nov 2006V. Palladino Report on BENE Activities

39 CARE06, 17 Nov 2006V. Palladino Report on BENE Activities

40 CARE06, 17 Nov 2006V. Palladino Report on BENE Activities

41 CARE06, 17 Nov 2006V. Palladino Report on BENE Activities Set one up in Europe! OK !!! FP7 EU ν Collaboration

42 CARE06, 17 Nov 2006V. Palladino Report on BENE Activities a European Neutrino Oversight Body for BENE and future initiatives to report to to bring about the indispensable consensus PAF shows the way MMW Driver, Target, Collectors ….. everybody needs them A very high priority aim: need advice & help of CARE & ESGARD

43 CARE06, 17 Nov 2006V. Palladino Report on BENE Activities BENE efforts for FP7 Please contact us and join to help NuFact&Superbeam Design Study Rob EdgecockRob Edgecock(RAL) and Marcos Dracos(IN2P3) have taken the responsibility to start a WG assembling a first skeleton of proposal to beMarcos Dracos presented at CARE06 in Frascati (Nov14-17). This was given good priority by ESGARD and is at the moment the most promising immediate option that we have. Betabeam Design Study A DS study is already in progress in the Eurisol framework. Mats Lindroos (CERN) has taken the task to explore within the present DS a firstMats Lindroos skeleton of a second phase proposal. At the moment, however, it appears that we will have to delay this to the later FP7 DS call. Mats will present his present thinking at CARE06 Several Joint Research Activities (JRA), IA1- European proton accelerator R&D high power option for a proton driver sector JRA M. Zito/CEA and J. Pozimski /RAL will follow itM. ZitoJ. Pozimski target sector (a WP in a larger JRA? ) C. Densham/RAL and M. Dracos/IN2P3 have taken the charge of establishing contactsC. DenshamM. Dracos A Networking Activity (NA) containing a fraction of BENE areas of interest could be accommodated in this IA. IA2-Novel accelerating techniques Strengthening "our" new RAL muon facility could be part of it too. A MICE JRA is being prepared by K. Kyberd and A. Blondel. A JRA on FFAG’s. Francois Meot (IN2P3/CEA) has accepted the task, in collaboration with R. Edgecock, S. MachidaFrancois Meot No discussion on any Networking Activity (NA) nor Transnational Access has yet taken place in this IA. IA3 Superconducting RF (SCRF) accelerators R&D: Rebecca Saviour of Lancaster has accepted to be BENE’s RF expert that will foster BENE interests in this IA.Rebecca Saviour

44 CARE06, 17 Nov 2006V. Palladino Report on BENE Activities Immediate plans December 1 Extended draft of Design Study description(s) Up to Feb 19 Visit to all interested laboratories in Europe Feb 19-21 CERN International Meeting on ISS to IDSs transition harmonising FP7 and IDSs Mid April? DS Proposal(s) in Design Study Proposal(s) NOW IA Proposal(s) immediately later

45 CARE06, 17 Nov 2006V. Palladino Report on BENE Activities Next 18 months

46 CARE06, 17 Nov 2006V. Palladino Report on BENE Activities THE END

47 CARE06, 17 Nov 2006V. Palladino Report on BENE Activities BENE efforts for FP7 Please contact us and join to help FP7 is finally starting. A first FP7 call, for Design studies, is expected before the end of the year. Proposals will be due in April, a few months later. Approval could bring first funding at the beginnining of 2008 or so. A second call, for Integrating Activities, is expected Nov 07, with Mar 08 as a deadline, with first funding early 2009. This must contain NAs, TAs, JRAs, see below Next relevant calls 2009 !!! We should not be stalling for two more years !! We need the largest possible consensus and coherence. It will clearly not be easy to assemble all the conditions, support from CERN and National agencies and Laboratories, for successful bids. According to the recent ESGARD/CARE preliminary plan, see http://bene.web.cern.ch/bene/Working-groups_mandate.doc, BENE could file bids forhttp://bene.web.cern.ch/bene/Working-groups_mandate.doc Two Design Studies (DS): DS’s are studies of feasibility, to be carried out by a European collaboration, funded (presumably for about 1/3?) by EU and working in collaboration with international partners. Recent news are that the contribution from EC could be larger than originally indicated, as large as 5 M Euros, and R&D work could be included in addition to feasibility studied. NuFact&Superbeam Design Study Rob EdgecockRob Edgecock(RAL) and Marcos Dracos(IN2P3) have taken the responsibility to start a WG assembling a first skeleton of proposal to be presented at CARE06 in Frascati (Nov14-17). This was given good priority byMarcos Dracos ESGARD and is at the moment the most promising immediate option that we have. Betabeam Design Study A DS study is already in progress in the Eurisol framework. Mats Lindroos (CERN) has taken the task to explore within the present DS a first skeleton of a second phase proposal. At the moment, however, it appearsMats Lindroos that we will have to delay this to the later FP7 DS call. Mats will present his present thinking at CARE06 in Frascati (Nov14-17). Several Joint Research Activities (JRA), JRA’s are technical R&D projects on realization of key prototypes, demonstrations of performance and the like, to be carried out by a European collaboration, funded (presumably for about 1/3?) by EU and working in collaboration with international partners. Bids for JRA’s should take place within the framework of one of the Integrating Activities that ESGARD intends to promote. Many LOI’s have been received by ESGARD and more are coming. The task is now the one to select the ones to be actually proposed as JRA’s within Ia’s. At the moment, three IA’s are envisaged, but a different format is not excluded. A first meeting of the task force preparing these proposals took place at CERN on Oct 30. A brief summary of the state of each follows Presentations from the three coordinators will be presented at CARE06 on Thu Nov 16 afternoon. IA1- European proton accelerator R&D R. Garoby is coordinating the preparation of this proposal. The general theme is proton accelerator R&D, strengthening LHC and the CERN p complex. The total cost of related LOIs is well above 60 M, a reasonable goal is applying for 15 M from EU, with 45 M as total budget. Activities relevant for future neutrino beams would take place in the high power proton driver sector (a JRA being proposed in this area under the responsability of Garoby and collaborators). M. Zito/CEA and J. Pozimski /RAL and others will followM. ZitoJ. Pozimski this for BENE exploring also opportunities in the sector of Rapid Cycling Synchrothrons for neutrino applications (NB we need them to be truly rapid, 50 Hz eventually, and therefore NC!).) and target sector (where a WP on high power targetry & collection can be envisaged within a JRA on high power and radiation deposition in materials, chiefly motivated by the R&D for a high quality collimators for LHC). C. DenshamC. Densham/RAL and M. Dracos/IN2P3 have taken the charge of establishing contacts with all EU experts, in and out of the particle physicsM. Dracos community, in particular the CERN CNGS and ISOLDE experts, and to try to define the content of such a WP. CARE06 in Frascati should help these contacts. A Networking Activity (NA) containing a fraction of BENE areas of interest could be accommodated in this IA. Transnational Access options have not yet been seriously considered yet. IA2-Novel accelerating techniques E. Jensen is coordinating the preparation of this proposal. This is much less advanced than IA1 The total cost of related LOIs is 85 M. It has to be reduced dramatically. The leitmotif of the IA is strenghtening CTF3. But strengthening "our" new RAL muon facility could be part of it too. A MICE JRA is being prepared by K. Kyberd and A. Blondel. A JRA on FFAG’s appears negotiable, if downsized. Francois Meot (IN2P3/CEA) has accepted the task, in collaboration with R. Edgecock,Francois Meot S. Machida and other experts of pushing this within the team preparing this IA proposal. Discussion at CARE06 should prove very instrumental. No discussion on any Networking Activity (NA) or Transnational Access has yet taken place in this IA. IA3 Superconducting RF (SCRF) accelerators R&D: O. Napoly is coordinating the preparation of this proposal. This is also less advanced than IA1. The total cost of related LOIs is 31 M, with more big ones still coming. One is a JRA for a big RF testing facility. A JRA on 200 Mhz muon acceleration cavities could be accommodated in this. R&D on p acceleration cavity may instead go to WG1, will see Rebecca Saviour of Lancaster has accepted to be BENE’s RF expert that will foster BENE interests in this IA.Rebecca Saviour Discussion at CARE06 should again prove very instrumental. No discussion on Transnational Access has yet taken place in this IA. Olivier has in mind a single large SCRF NA. Finally, outside the framework of CARE, we intend to propose also a neutrino detector test facility at CERN. Paul SolerPaul Soler will be in charge of fostering this in connection with the BENE steering group. The right FP7 framework will have to identified, while contacts begin, starting with the (few !) neutrino physicists left at CERN. Timeline At CARE06 we will plan work on all of this. Design Studies being the most urgent priority. Deadline is April, remember! A detailed calendar will be issued. We already know that one next major appointment will be a meeting on the transition from the International Scoping Study (ISS) to the International Design studi(es), the IDS’s. This will be Feb 19-21 at CERN. This will focus on our plans in the frame of our international collaboration with pur US, Japanese, Indian collaborators. That clearly we need to harmonise with our FP7 plans.

48 CARE06, 17 Nov 2006V. Palladino Report on BENE Activities Reserves

49 CARE06, 17 Nov 2006V. Palladino Report on BENE Activities A complete Euro-Neutrino Design Study physics, accelerators, detectors, baselines ISS= International Scoping Study … American and Asian collaborations as full partners June 2005 to late 2006: mostly neutrino factory & superbeams define priorities and ways of Design Study consolidate regional & international collaboration us in EU, gain support of Council and ECFA IDS = International Design Study (neutrino factory & superbeams & betabeam) start late 2006 or early 2007 achieve higher funding, start design effort us in EU, prepare FP7 Proposal (March 2007, it seems) structure EU collaboration, get CERN involved as much as possible FP7 DS = EC (support for EU effort in the) Design Study … CNGS & beyond aiming at first EC funds Jan 1, 2008 inter-twined with IDS keeping American and Asian collaborations as full partners …. T2K, Nova Goal: Conceptual Design Report of a European Precision Neutrino Facility by end 2010 is next natural step for accelerator ν ISS & IDS/FP7 DS BENE CDHS CHARM I/II CHORUS NOMAD OPERA ICARUS

50 CARE06, 17 Nov 2006V. Palladino Report on BENE Activities conceptual feasibility study of the following components: a high power proton driver of at least 4-5 GeV the engineering of the handling, containment and safety aspects of a hi power target & collection station a performing and cost effective muon phase rotation and cooling channel non-scaling FFAGs for acceleration of muons (and possibly protons) an optimised storage ring for muons higher intensity and higher gamma beta beams technical preparatory (R&D) projects, aiming at demonstrating: the existence of at least one adequate choice of target an extended lifetime of the horn prototypes at high rate and radiation muon ionization cooling, by completion of the MICE experimental program operation of a non-scaling FFAG RF cavities and kicker magnets for fast manipulation of muon beams + specific detector R&D and design efforts on : photo detector development for very large far detectors developments of the liquid argon technique including the presence of magnetic field study and tests of a magnetic calorimeter susceptible to be built with a mass of up to 100 kton. detectors dedicated for tau detection such as the emulsion cloud chamber last but not least the necessary near detector concepts and beam instrumentation guessing the Content of the Design Study pre-submitting it now to ECFA/ESGARD scrutiny

51 CARE06, 17 Nov 2006V. Palladino Report on BENE Activities

52 CARE06, 17 Nov 2006V. Palladino Report on BENE Activities

53 CARE06, 17 Nov 2006V. Palladino Report on BENE Activities Agenda of the BENE day at RAL >> Fri Apr 28 Morning : general introduction >> >> 9:00 Status and prospect of the ISS, towards the IDS (Dornan) >> 9:10 Address from ESFRI Chair (J. Wood) >> 9:40 News from EC (R. Aleksan, tbc) >> 10:00 FP7 (DS, JRA's) and general outlook in EU (Edgecock) >> 10:30 US contributions to the IDS (A.Bross) >> >> 10:40 Break >> >> 11:00 Japan contribution to the IDS (Kuno) >> 11:20 Other contributions to the IDS (Mondal, tbc) >> >> 12:00 General Discussion until lunch >> >> >> Fri Apr 28 Afternoon : EU contributions to the IDS(*) > >> 1) Initiative in the Physics studies sector (Mezzetto/Donini 20') >> 2) Initiative in the Proton driver sector(Cavata 10') >> 3) Initiative in the Target sector (Bennett 10') >> 4) Initiative in the Collection sector (Dracos 10') >> 5) Initiative in the Muon Front End sector (Long 10') >> 6) Initiative in the Muon Back End sector (Meot 10') >> 7) Initiative in the Betabeam sector (Lindroos 15-20') >> 8) Initiative in the Neutrino detector sector (Blondel 20') General Discussion on EU contributions to the IDS (introduced & chaired by R. Garoby) (*) NB this will be match very closely our requests to FP7

54 CARE06, 17 Nov 2006V. Palladino Report on BENE Activities proud to have gotten this far Matching our two crucial 2005 milestones Physics case developped as far as possible today in the most international context possible becoming a polished BENE Interim Report Design Study road traced by ISS in spite of outstanding difficulties smaller size of our community & its core of active people CERN contribution being resurrected only now (very slowly) richness of options that makes consensus more laborious NB legitimate different scientific interests do exist collapse of FP6 calls and more

55 CARE06, 17 Nov 2006V. Palladino Report on BENE Activities

56 CARE06, 17 Nov 2006V. Palladino Report on BENE Activities

57 CARE06, 17 Nov 2006V. Palladino Report on BENE Activities After a few nice forward jumps 1 step back and ½ step forward approval of BENE NA within I3 (CARE) MMW Workshop Villars & beyond FP6 Design Study? I3ν? Mar 05 Niet! 1 year ISS FP7&WDS Design Study 2003-20042003-2004 Nov 04 Niet! Jun 05-Aug 06 Mar 07? Mar 05

58 CARE06, 17 Nov 2006V. Palladino Report on BENE Activities Two main physics strategies use of the high neutrino rate (>10 20 /year) and energy (10-50 GeV) of Neutrino Factory + LMD (“Hyper-MINOS”) detector of large but not huge mass (50-100 Kt), necessarily magnetic (a dense magnetized Iron detector, or, possibly, Li-Argon), a few 1000 Km away. use of the lower neutrino rate (10 18-19 /year) and energy (sub-GeV) of Betabeam + Megaton (“Hyper-Kamioka”) low density detector of very large mass (0.5-1 Mt) and volume (0.5-1 Mm 3 ) non magnetic (a Water Cerenkov detector, or possibly, again Li-Argon), a few 100 Km away.  ν e + ν    νe  νe

59 CARE06, 17 Nov 2006V. Palladino Report on BENE Activities BetaRing Muon Complex G.Sasso LMD 0.1 Mton Frejus 1 Mton Water C Garoby Haseroth Lindroos EU Neutrino Complex Proton complex

60 CARE06, 17 Nov 2006V. Palladino Report on BENE Activities Superbeam (high power conventional beams) is less performing, per se but does have technical synergy with the NuFact largely coincides with the front end of a Factory solving the technical challenges of a several MegaWatt proton driver and target & collection system, on the way to build a factory, yields a superbeam facility essentially for free (not its detector, however!) and does have scientific synergy with the Betabeam can use the same detector combination has some truely unique features: 1) oscillation signal is ν e →ν μ in the first, ν μ →ν e. in the second, one calibrates the signal (and background) of the other ! 2) T-reversal and CPT asymmetries can be measured likely to be integrated in both strategies   ν  ν

61 CARE06, 17 Nov 2006V. Palladino Report on BENE Activities Esample of comparison of physics reach: θ 13 and CP violating phase Figure 7 : 99%CL  sensitivity of the beta-beam, of the SPL-SuperBeam, and of their combination, see text. Dotted line is the combined Superbeam+beta- beam sensitivity computed for sign(  m 2 )=-1. Sensitivities are compared with a 50 GeV Neutrino Factory producing 2  10 20  decays/straight section/year, and two 40 kton detectors at 3000 and 7000 km Comparable merits : NuFact somewhat better and more versatile for ν oscillations Megaton offers sinergy with N decay and more NB conclusions highly preliminary based on still not well agreed yardsticks must now be re-scrutinized much more in depth (ISS) !!!

62 CARE06, 17 Nov 2006V. Palladino Report on BENE Activities Betabeam + MegatonNuFact + LMD are complementary !!!!!!!!!!! each has merits unaccesible to the other (matter effects, CP, T, CPT violation, p decay, astroph. & cosmology.. ) by means of truely international collaboration we could and should aim at having both facilities A general remark and we must push both very actively catch opportunities wherever they emerge seriously aim at building one in Europe in the “construction window” ! !

63 CARE06, 17 Nov 2006V. Palladino Report on BENE Activities Further caveat Intermediate solutions also emerging ! Higher energy and higher rate betabeams heading to detectors at intermediate distances thou technically more difficult ( beta acceleration in new higher energy SPS or LHC !) do deserve very careful attention

64 CARE06, 17 Nov 2006V. Palladino Report on BENE Activities 100 participants HyperK UNO Memphys

65 CARE06, 17 Nov 2006V. Palladino Report on BENE Activities All aspects of Megaton physics revised and updated state of the art material for full elaboration of BENE physics case

66 CARE06, 17 Nov 2006V. Palladino Report on BENE Activities Strong reinforcement of international cooperation achieved …………………………………………………………

67 CARE06, 17 Nov 2006V. Palladino Report on BENE Activities 200 participants All aspects of future ν physics revised and updated state of the art material for full elaboration of BENE physics case

68 CARE06, 17 Nov 2006V. Palladino Report on BENE Activities NuFact Scientific Program To be inserted

69 CARE06, 17 Nov 2006V. Palladino Report on BENE Activities Sunday June 26 9:00-13:00 1) Physics Studies : Status & priorities 1) Accelerator R&D : Status & priorities 2) Neutrino Detectors: Status & priorities WW R&D Session PANEL & OPEN DISCUSSION Launch International Scoping Study … to report at NuFact06

70 CARE06, 17 Nov 2006V. Palladino Report on BENE Activities A Summer School accompanied the workshop: 22 students, 12 lecturers

71 CARE06, 17 Nov 2006V. Palladino Report on BENE Activities The International Scoping Study (ISS) on Neutrino Factories and Superbeam s A joint venture, jointly set up by the coordinators of the US Neutrino Factory Collaboration the Japanese NuFact-J Work Group the Eu BENE Network and the host (RAL) UKNF Collaboration to lay the foundation of a full blown International Design Study that must advance to same level of progress as Betabeams S. Geer Y. Kuno V. Palladino K. Peach

72 CARE06, 17 Nov 2006V. Palladino Report on BENE Activities started in March-April by RAL All aspects included, except accelerator Betabeam studies

73 CARE06, 17 Nov 2006V. Palladino Report on BENE Activities International Scoping Study : agenda for one year 22-24 Sep CERN a success !!! Late January KEK Mid April RAL Late AugustNuFact06 in Irvine hopefully, NuFact06 will launch International Design Study and FP7 Eu Design Study Matching funds + topical intermediate workshops Physics, London, 14-21 Nov.

74 CARE06, 17 Nov 2006V. Palladino Report on BENE Activities Detectors (NEW!) Water Cherenkov (1000kton) Magnetized Iron Calorimeter (50kton) Low Z scintillator (100 kton) Liquid Argon TPC (100 kton) Hybrid Emulsion (4 kton) Near detectors (and instrumentation) Physics compare performance of various options on equal footing of parameters and conventions and agreed standards of resolutions, simulation etc. identify tools needed to do so (e.g. Globes upgraded?) propose « best values » of baselines, beam energies etc.. Accelerator: -- proton driver (energy, time structure and consequences) -- target and capture (chose target and capture system) -- phase rotation and cooling -- acceleration and storage evaluate economic interplays and risks include a measure of costing and safety assessment (A.Blondel) (Y. Nagashima) (M. Zisman) P. Dornan NB BetaBeam included The three sectors of SS (andDS)

75 CARE06, 17 Nov 2006V. Palladino Report on BENE Activities 2005 06 07 08 09 10 11 19 Int. Scoping Study(*) Design Study BENE : the longer term plan CDR … at the time of end of LHC payment first LHC results ILC decision be ready to catch any construction window Physics feasibility Feasibility & TPW HIPPI, HARP MERIT MICE PRISM, EMMA NB Betabeam CDR End 2009 ! Construction window

76 CARE06, 17 Nov 2006V. Palladino Report on BENE Activities The HARP experiment TPC Forward Spectrometer Total Acceptance Scan CERN PS energy range … RCS is an option

77 CARE06, 17 Nov 2006V. Palladino Report on BENE Activities (US, Japan, CERN&RAL) holds the key to any superbeam !!! tests the single shot behavior at MMW driver of target and collection (solenoid, horn?) should make that more known better supported and manned should evolve that into a MMW target and collector Test Area? The most crucial experiment for the future of the ν can we master the MMW? The MERIT ( nTof 11) experiment

78 CARE06, 17 Nov 2006V. Palladino Report on BENE Activities Liquid jet target in 15T mag. field

79 CARE06, 17 Nov 2006V. Palladino Report on BENE Activities MICE …. crucial demonstration esperiment for the feasibility of a Neutrino Factory muon ionisation cooling Phase I completely funded by now- Datataking starts April 1 2007

80 CARE06, 17 Nov 2006V. Palladino Report on BENE Activities

81 CARE06, 17 Nov 2006V. Palladino Report on BENE Activities Emma

82 CARE06, 17 Nov 2006V. Palladino Report on BENE Activities One crucial task of BENE in the ISS year assemble a real EDS (Eu DesignStudy) collaboration !!!!! that will sign and provide the manpower & largest part of the funds, matching funds, for a FP7 bid able to have the blessing of ECFA and good odds of approval in Brussels. find the synthesis of so far not obviously converging interests CERN, INFN, CCLRC, IN2P3, CEA, PPARC, CSIC, Germany?, Belgium, NIKHEF, everybody CERN positive attitude towards the ISS and BENE’s initiative willingness to assemble a small ISS task force will no doubt greatly help a few fractions of FTE can make an impact

83 CARE06, 17 Nov 2006V. Palladino Report on BENE Activities Plans for the year ahead Interim BENE Scientific Report, based on NNN05,NuFact05, ISS Draft http://people.na.infn.it/~palladin/BENEScientificInterimReport http://people.na.infn.it/~palladin/BENEScientificInterimReport input to the strategic discussion in progress FPA, POFPA Akesson/Peach Strategy group (Orsay Jan 30) Conclude Scoping Study (NuFact06) define the content of WDS and FP7 DS Assemble FP7 Collaboration prepare FP7 proposal bridge over Aug 06 to FP7 funding (1Jan2008?)

84 CARE06, 17 Nov 2006V. Palladino Report on BENE Activities Milestones & Deliverables BENE III period Jan 06 - Jun07 BENESG 1/ month Jan Feb Mar Apr May Jun Jul Aug Sep Nov Dec Jan Feb Mar Apr May Jun

85 CARE06, 17 Nov 2006V. Palladino Report on BENE Activities Since CARESG Apr 11 Joint BENE & 3rd ISS meeting RAL 24-25 Apr 28 April LOI !!!! BENE Midterm Report gets yellow in May Open BENE SG 4 Jul CERN (FP7) CERN Council Strategy Document 4th meeting of the ISS at UCI (21-23 Aug) NuFact06 (24-30) “End” of the ISS, next steps


Download ppt "CARE06, 17 Nov 2006V. Palladino Report on BENE Activities Beams for European Neutrino Experiments (BENE) subtitle: A Network aiming at a consensual road."

Similar presentations


Ads by Google