Download presentation
Presentation is loading. Please wait.
Published byArlene Gilmore Modified over 9 years ago
3
TECHNICAL CONVENTIONAL PRESSURE-DOSED DRAIN FIELD
4
TECHNICAL GEOMEMBRANE INSTALLED
5
TECHNICAL AIR PUMP ACTIVATED
6
TECHNICAL BASIC NOMOUND PRINCIPLE 1 psi air over 144 square inches equals 144 lbs/F 2.3 ft 3 water @ 62.4 lbs/ft 3 equals 144 lbs/F 1 psi
7
TECHNICAL Air 24/7 for O 2 Under pavement Monitoring 24/7 OTHER TECHNICAL FEATURES
8
USERS APPEARANCE Aesthetics plus resale value Don’t want to "know it’s there"
9
USERS Without NoMound® System APPEARANCE With NoMound® System
10
USERS FOOTPRINT APPEARANCE Big House/Small Lot Replacement System where no room for mound
11
USERS FOOTPRINT/UNDER PAVEMENT APPEARANCE
12
USERS UNDER PAVEMENT Residential Commercial New Replacement APPEARANCEFOOTPRINT
13
USERS Without NoMound® System Development Limited VALUE ADDED With NoMound® System Development Unlimited APPEARANCEFOOTPRINTUNDER PAVEMENT
14
USERS SUMMARY BUYING DECISIONS Appearance Footprint Under Pavement Value Added Extreme Value Added
15
THANK YOU!
Similar presentations
© 2024 SlidePlayer.com Inc.
All rights reserved.