Comprehensive State Energy Plan – Public Meeting #3 Joplin, Missouri October 14, 2014 Ray Wilson.

Similar presentations


Presentation on theme: "Comprehensive State Energy Plan – Public Meeting #3 Joplin, Missouri October 14, 2014 Ray Wilson."— Presentation transcript:

1 Comprehensive State Energy Plan – Public Meeting #3 Joplin, Missouri October 14, 2014 Ray Wilson

2 Gas System Issues Resulting from Joplin Tornado

3

4

5

6

7

8  1/3 of Joplin Sustained Damage from EF-5 Tornado  Path 1 mile wide and 7 miles long through center of town  Death toll - - 161 lives  Major damages to infrastructure  Abandoned  54,000 feet of gas main  3,365 individual service lines

9

10  Broken Risers – Damaged Regulator Stations  Calling in Employees  Debris blocking roads  Loss of Street signs and Landmarks  Dead and injured residents  Communication problems  Interaction with Emergency Personnel

11  Assessing magnitude of damage  Bringing in additional workers  Dividing damaged area into grids  Decision to shut off sections of system  Dealing with severe weather after tornado

12  Handling emergency leak calls  Printing wall map of affected area  Abandoning main in heavily damaged area  Street by street surveys to abandon services  Interaction with agencies  FEMA  SEMA  National Guard  Corps of Engineers  State  County  City

13  Continual assessment of damage  Bringing in additional company and contract workers  Feeding and housing an army of workers  Using Jasper County tax maps to assist in planning  Staying ahead of debris removal  Acquisition of material

14  Communication nonexistent for several hours  Limited success using 2-way handheld radios  Extended response time  Widespread street blockages  Downed power lines  Debris  Destroyed vehicles  Lack of traffic signals, street signs, house addresses and local landmarks

15  Limited capabilities on in-truck terminals  Heavy workload

16

17

18  Total loss of electricity to Joplin Service Center  Backup generator guaranteed work continuity  Initial loss of communications for several hours immediately following tornado  Determine Scope  Damage  Job Tasks  Implement plan  Determine necessary manpower

19  Arrange transfer for rotating shifts  Lodging  No hotel rooms available  Food  Many restaurants destroyed  Assign employees to arrange minimum 2 meals per day for work force  Employee assigned at City of Joplin Command Center  Relay information to MGE and Corp of Engineers  Invaluable resource

20  Avoiding further damage  Demolition crews  Clean-up crews  Ongoing Customer Service  Temporarily opening Joplin Office  Demolition Permits  Billing Issues  Collection activity

21  Re-establishing service  Turning on systems that have been shut off  Running new main  Running new services  Financial loss to MGE  Labor and material cost  Loss of revenue  Regulatory Issues  Customer Perception

22  Avoiding loss of customers in rebuilding phase  Being responsive to rebuild time frames  Help customers rebuild quickly and better---MGE energy efficiency initiatives

23

24  Placement of two MGE Supervisors 24 hours a day  Construction and Maintenance  Inspection and Service  Establish MGE contact for a solid path of communication  FEMA  Corp of Engineers  City of Joplin  Ensure protection of undamaged facilities

25  Fleet Servicing Requirements  Regular vendor’s business destroyed  Select new vendor  Ruined/flat tires numerous times daily  Central Warehouse deliveries  Provided Tetanus and Hepatitis vaccinations to employees  Counselors brought in for employees

26

27  Organize and Disperse Workforce  Collect data of abandoned main and services  Timely entry of data in computer to ensure accuracy  Updating computer based mapping to maintain accuracy

28  Most Code Compliance Requirements complete prior to tornado  Balance completed within required time frames  MPSC Staff visited Joplin Service Center occasionally to observe  Overall Damage  MGE’s progress  MPSC Annual Audit was postponed until January, 2012  Audit results indicated Zero Areas of Probable violations and four Areas of Concern

29

30

31

32

33

34

35

36

37

38

39

40

41

42

43

44

45

46

47

48 Logistic Planning for Employees Contacts for Vendors Communication Capabilities Navigation Advance Coordination with Emergency Responders


Download ppt "Comprehensive State Energy Plan – Public Meeting #3 Joplin, Missouri October 14, 2014 Ray Wilson."

Similar presentations


Ads by Google