Download presentation
Presentation is loading. Please wait.
Published byShona Stephanie Mosley Modified over 9 years ago
1
CORAL and the FCDC The year in review
2
What is CORAL?
3
State of ERM at FLO 2011-2014 OverworkedOverworked by bemycareercoach.combemycareercoach.comAbout ResourcesAbout Resources by University of Notre DameUniversity of Notre Dame
4
● Satisfaction ● Expectations o And what it says about human nature ● Obstacles ● Aspirations Major Findings ExpectationExpectation by Steffen Boelaars CC BY- NC-SA 2.0CC BY- NC-SA 2.0
5
● Sharing licensing data ● Terms tool review ● Statistics module ● EZProxy audit Next Steps Cats on StairsCats on Stairs by Christopher Harris CC BY-NC-SA 2.0CC BY-NC-SA 2.0
6
The FCDC Project
8
Katherine Berry - Wentworth Louisa Choy-Wheelock Kelly Drake-FLO Marilyn Geller-Lesley Ann Glannon-Wheelock Who is FCDC? Allyson Harper-Nixon - Wheelock Adam Shire - FLO Walter Stine-FLO Catherine Tuohy-Emmanuel Erin Wentz-MCPHS
9
Process: Inspiration Macro testingMacro testing by Kristy (kristykay22) CC BY-NC-SA 2.0 CC BY-NC-SA 2.0 The sound of a wishThe sound of a wishby Luigi Anzivino CC BY-NC-SA 2.0 CC BY-NC-SA 2.0
10
Process: Elaboration Chaise Longue 2Chaise Longue 2 by John Connell CC BY-NC-SA 2.0 (Cropped and resized.)CC BY-NC-SA 2.0 Tell me about a time when….
11
Process: Negotiation My bikeMy bike by Stefan Georgi CC BY-NC-SA 2.0CC BY-NC-SA 2.0 Metallic Green 2008 Kawasaki Vulcan 900 MotorcycleMetallic Green 2008 Kawasaki Vulcan 900 Motorcycle by Nicholas D. CC BY-NC 2.0CC BY-NC 2.0
12
Process: Result Cost per: Resource, Organization, or Fund Code Cost Type Subscription End Date
13
Process: Impact Time is MoneyTime is Money by TaxCredits.net CC BY 2.0CC BY 2.0 crystal ballcrystal ball by Ed Schipul CC BY-SA 2.0CC BY-SA 2. See-SawSee-Saw by Joe Shlabotnik CC BY 2.0 (cropped)CC BY 2.0 Poker chipsPoker chips by Angellea CC BY-NC 2.0 CC BY-NC 2.0
14
The Future of the Cost History Specification
15
What was the required overhead for the Specification Development? 8 ACTIVE COMMITTEE MEMBERS 10 4-6 MONTHS OF WORKING MEETINGS HOURS OF SPEC DEVELOPMENT PER PERSON PER MONTH
16
Sharing our story with the world
17
Iterative Evaluation and Development Cycle
18
Open Source Opens Opportunities ● Freely available ● Shared development ● Advancement for all
19
Developing “the Matrix” - Product Specs Software
20
The Organization Guide Organization
21
The Community Guide Community
22
How to Commit to an OS Product
23
What we think we learned
24
The Proposal Community Involvement with CORAL The FCDC Project 1 What is the required overhead? 2. What is our capacity? 3. How great is the need? 4. Can it work for us so that the benefits outweigh the cost
25
Katherine Berry - Wentworth Louisa Choy-Wheelock Kelly Drake-FLO Marilyn Geller-Lesley Ann Glannon-Wheelock Who is FCDC? Allyson Harper-Nixon - Wheelock Adam Shire - FLO Walter Stine-FLO Catherine Tuohy-Emmanuel Erin Wentz-MCPHS
Similar presentations
© 2024 SlidePlayer.com Inc.
All rights reserved.