Presentation is loading. Please wait.

Presentation is loading. Please wait.

Athabasca Hall - The University's First Building Part III: 1971-1996.

Similar presentations


Presentation on theme: "Athabasca Hall - The University's First Building Part III: 1971-1996."— Presentation transcript:

1 Athabasca Hall - The University's First Building Part III: 1971-1996

2 By 1971, the interior of Athabasca Hall - built 60 years previously with a "wood of a type known as slow- burning" - no longer satisfied modern fire safety standards. Athabasca Hall, 1967

3 Athabasca Hall was deemed unsafe and ceased to be a student residence. With the exception of a few small service units, the building stood empty. Students throwing water from Athabasca Hall

4 Plans were announced in 1971 to demolish Pembina, Athabasca and Assiniboia Halls. A proposed new graduate residence and social centre would take their place. Athabasca Hall, 1967

5 These plans met with considerable opposition and were fortunately abandoned. A study was subsequently undertaken to examine the feasibility of renovating the three buildings. Athabasca Hall, 1967

6 Due to its concrete structure, Pembina Hall was found to be in excellent condition. Pembina Hall

7 Although the brick and stone exteriors of Athabasca and Assiniboia Halls were found to be in good condition, their wooden interiors had deteriorated beyond repair.

8 Therefore, it was decided as funds became available, to rebuild both buildings, Athabasca first and then Assiniboia, within their original brick and stone exteriors.

9 Renovations to Athabasca Hall began in 1976. Athabasca Hall Crane

10 The architect in charge of the restoration was Mickey Holland, a partner in the firm of Bittorf-Holland- Christianson Architects Ltd. Reconstruction of Athabasca Hall

11 Poole Construction was selected as the main contractor with Elmer Olsen in charge of demolition. Demolition of Athabasca Hall

12

13

14 A crane removed the roof from Athabasca Hall and the interior was completely gutted. Reconstruction of Athabasca Hall

15 Roof of Athabasca Hall

16 Athabasca Hall had seven bays, and Olsen removed three at a time. As the bays were removed, steel-joiced concrete floors were added. Athabasca Hall reconstruction

17

18 Holland later related, "Every floor in the building and the roof were removed - right down to the bare bones and a brand new building was put inside." Interior of Athabasca Hall

19 Looking downward from the roof of Athabasca Hall

20 Construction workers rebuilding Athabasca Hall's interior

21 Athabasca's floors, when originally constructed, had at least five layers. Interior of Athabasca Hall

22 These layers included shiplag sheeting, wooden joists and linoleum. Reconstruction of Athabasca Hall

23 Construction workers rebuilding Athabasca Hall's interior

24 During the demolition, eight whiskey bottles, including a 1926 bottle of Gooderham and Worts rye whiskey, were found neatly concealed in the walls, ceilings and floors. 1926 Gooderham and Worts Rye Whiskey Bottle

25 All the stained glass from the foyer, the wood paneling in the library and the fireplace were preserved. Fireplace and lobby, after restoration

26 The main floor lounge, now known as Heritage Lounge, was also preserved. Heritage Lounge, after restoration

27 An elevator was installed beside the preserved and now ornamental fireplace. Fireplace, lobby and elevator after restoration

28 Holland later referred to the restoration work as among the "toughest I've done" because older buildings lacked construction standards. Athabasca Hall, after restoration

29 Despite the stress caused by the demolition and reconstruction, not a crack was found along the exterior brick and stone shell. Athabasca Hall, in winter

30 The total renovation of Athabasca Hall cost about two million dollars and provided about 47,500 square feet of space. Athabasca Hall, around 1982

31 The building was officially opened on October 8, 1977 by Premier Peter Lougheed, himself a resident of Athabasca Hall thirty years previously. Invitation to the official reopening of Athabasca Hall

32 For his work in the renovation of the two buildings Mickey Holland received a Heritage Canada Medal in 1978. Architect Mickey Holland sitting in the restored Heritage Lounge

33 The University also received a Heritage Canada Award of Honour for the restoration of Athabasca Hall. Presentation of the Heritage Award of Honour at Rideau Hall, Ottawa

34 A certificate, and a large bronze plaque, now mounted outside the main entrance to Athabasca Hall, were presented at a ceremony at Rideau Hall in Ottawa. Heritage Canada Award of Honour Plaque

35 Between 1977 and 1996, the newly renovated Athabasca Hall was occupied by the Chancellor's Office and Senate, and a number of departments providing administrative services. Athabasca Hall, 1985

36 Athabasca Hall, 1988

37 These departments included University Press, Student Counselling, Advisor on Native Affairs, Public Relations, Alumni Affairs, the Development Office, and the Office of Human Rights. Athabasca Hall, 1994

38 Slide show by: Rob Lake (Office of the Provost and VP Academic)

39 Text by: Keith Smillie (Computing Science) Rob Lake (Office of the Provost and VP Academic)

40 Thanks to: Jim Franks (University Archives) Jodeen Litwin (Alumni Affairs) Tashie Macapagal (Office of the Provost) Rick Pilger (Alumni Affairs) Steve Sutphen (Computing Science) Kevan Warner (University Archives)


Download ppt "Athabasca Hall - The University's First Building Part III: 1971-1996."

Similar presentations


Ads by Google