1 according EU Standard EN 13160-2
Class I Leak Detection Systems - Highest level of monitoring and prevention of double walled tanks and pipes, according EU Standard EN Vacuum systems working principle…

2 Vacuum leak detector (e.g. THOMAS-ASF IIIF)
Leak Detection acc. EN Class I Working principle - Vacuum system Vacuum leak detector (e.g. THOMAS-ASF IIIF) Green operation light Normal Operation - Leak detector shows normal operation by green light Suction line Measuring line - Interstitial space of the double walled tank (or pipe) is evacuated up to system setup „Pump OFF“ OFF ON Pump Vacuum in the Interstitial Air flow - Normal pressure differences, caused by the system or temperature changes balanced by the pump Interstitial space Note: If the starting frequency of the pump increasing more and more, this points to an increasing leakage. OFF ON Double walled tank (or pipe)

3 Leak Detection acc. EN 13160 Class I Working principle - Vacuum system
Vacuum leak detector (e.g. THOMAS-ASF IIIF) Red alarm light Leakage in the system…  Air leakage Alarm buzzer switch Buzzer disabled indicated by yellow light - Air is sucked through the inner (or outer) wall into the interstitial  called air leakage - Vacuum level in the interstitial space drops Vacuum in the Interstitial Pump Air flow - At set point “Pump ON”, pump starts - For a higher leakage, the pump can‘t balance, the vacuum level changes down to the set point “Alarm ON” … inner tank wall, above the liquid level - Alarm situation indicated by visual red light and acoustic buzzer - Switch off the buzzer, call for service OFF OFF ON ON … in the outer tank wall or

4 Leak Detection acc. EN 13160 Class I Working principle - Vacuum system
Vacuum leak detector (e.g. THOMAS-ASF IIIF) Leakage in the system…  Liquid sucked into the interstitial - Liquid is sucked through the wall into the interstitial - Liquid volume in the interstitial is slowly increasing - Vacuum level drops because of decreasing air volume Vacuum in the Interstitial Pump Air flow … inner tank wall, below the liquid level OFF OFF ON

5 Leak Detection acc. EN 13160 Class I Working principle - Vacuum system
Vacuum leak detector (e.g. THOMAS-ASF IIIF) Leakage in the system…  Liquid sucked into the interstitial - Liqiud is sucked through the wall into the interstitial - Liquid volume in the interstitial is slowly increasing - Vacuum level drops because of decreasing air volume Vacuum in the Interstitial Pump Air flow - At set point “Pump ON”, pump starts - The interstitial will be filled with liquid step by step OFF OFF ON ON

6 Leak Detection acc. EN 13160 Class I Working principle - Vacuum system
Vacuum leak detector (e.g. THOMAS-ASF IIIF) Leakage in the system…  liquid barrier closes - On the tank top, liquid is sucked into the suction line - Liquid barrier filled up and closes - Connection suction line to the interstitial and measuring line blocked Vacuum in the Interstitial Pump Air flow OFF ON ON

7 Leak Detection acc. EN 13160 Class I Working principle - Vacuum system
Vacuum leak detector (e.g. THOMAS-ASF IIIF) Red alarm light Leakage in the system…  Alarm indication Alarm buzzer switch Buzzer disabled indicated by yellow light Remainimg vacuum in the measuring line will absorb liquid, Vacuum level decreases - At set point “Alarm ON”, Alarm situation indicated by visual red light and acoustic buzzer Vacuum in the Interstitial Pump Air flow - Switch off the buzzer, call for service - The vacuum level in the measuring and suction line will keep the liquid in the interstitial space for a certain period of time  preventing leaking into the environment OFF ON ON

8 Präsentation neuer LAG Newsletter.ppt
Focus on Safety, For A Clean Environment. Proven ASF Leak Detector Technology Contact Mail: Phone: +49 (0) Web: Copyright – Gardner Denver Thomas GmbH, D Puchheim, 02/2014 Thomas does not warrant, guarantee or assume any obligation or liability in connection with this information. Präsentation neuer LAG Newsletter.ppt


Download ppt "according EU Standard EN"

Similar presentations


Ads by Google