Presentation is loading. Please wait.

Presentation is loading. Please wait.

BETTER SOLUTIONS 4-2. River transport & Transit port (Rinz) overview of port of Rinzdischarging operation from barge.

Similar presentations


Presentation on theme: "BETTER SOLUTIONS 4-2. River transport & Transit port (Rinz) overview of port of Rinzdischarging operation from barge."— Presentation transcript:

1 BETTER SOLUTIONS 4-2. River transport & Transit port (Rinz) overview of port of Rinzdischarging operation from barge

2 BETTER SOLUTIONS 4-3. Stevedore equipment (Rinz) temporary storage in Rinzequipment in Rinz(200Ton crane) Equipment in Rinz (50Ton crane) Equipment in Rinz(Shuttler)

3 BETTER SOLUTIONS 5-1. Inland transportation route of Rinz - Zilina inland transport Linz Zilina inland transport (Rinz - Zilina) : 470KM inland transport permit between multi contries : 3 months before transport inland transport : Low bed chassis  25~60KM/Hour Truck  100KM/Hour

4 BETTER SOLUTIONS 5-2. Inland transportation / Custom clearance 1.Custom clearance : Rinz in Austria - KIA : notice UID NO.(VAT) & payment/refund VAT (before arrival) - ROTEM : notice shipping docs to KIA, HS Code, payment fee to BTR(SSU) notice each PK Dimension & Gravity/Lug Point - GLOVIS : custom clearance & payment fee(CNF Price) 2. Route of inland transport - highway(400KM) : Linz(AT) – Bratislava(SK) – Povazska Bystrica(SK) - local (70KM) : Povaska Bystrica(SK) – Zilana(SK) – Teplicka(SK) 3.Transport equipments - typical trailer : under 32 ton length under 14m / width under 2.55m / height under 2.7m - Low bed chassis : 32~60 ton (Escort) length over 14m / width 2.5~5m / height 2.7~4m - Special low bed : over 60 ton (Escort) length over 14m / width 2.5~5m / height 4~4.6m 4.On trailer & stevedore equipment - 200 ton Mobile crane - 100 ton Mobile crane - 50 ton Mobile crane

5 BETTER SOLUTIONS 5-3. Inland transportation & stevedoring transporter and equipment

6 BETTER SOLUTIONS 5-4.1 Road survey for inland transport Inland transport (height limit) : under 5M (Over Bridge & pass elec line OK) Inland transport (weight limit) : pass Zilina city & River Bridge (permit) Linz – VoestalpineBratislava border

7 BETTER SOLUTIONS 5-4.2 Road survey for inland transport Bratislava city Povazska Bystrica elec. line Passing Zilina city Teplicka( near KIA site)


Download ppt "BETTER SOLUTIONS 4-2. River transport & Transit port (Rinz) overview of port of Rinzdischarging operation from barge."

Similar presentations


Ads by Google