Presentation is loading. Please wait.

Presentation is loading. Please wait.

SMALL CALIBER REQUIREMENTS Advanced Planning Briefing to Industry (APBI) Ms. Bobbie Russell Lake City/Small Cal Team Leader USA Munitions & Armament Cmd.

Similar presentations


Presentation on theme: "SMALL CALIBER REQUIREMENTS Advanced Planning Briefing to Industry (APBI) Ms. Bobbie Russell Lake City/Small Cal Team Leader USA Munitions & Armament Cmd."— Presentation transcript:

1 SMALL CALIBER REQUIREMENTS Advanced Planning Briefing to Industry (APBI) Ms. Bobbie Russell Lake City/Small Cal Team Leader USA Munitions & Armament Cmd SOSMA-PRC-S (309)782-3006 DSN 793-3006 russellr@osc.army.mil Mr. Peter Errante Acting Deputy Office of PM Small Arms (973)724-4798 DSN 880-4798 petere@pica.army.mil PEO GCSS U.S. Army TACOM FORGING A STRONG DEFENSE

2 LONG RANGE TACTICAL SNIPER CARTRIDGE 2/27

3 LONG RANGE TACTICAL SNIPER CARTRIDGE SYSTEM DESCRIPTION AND CAPABILITIES Caliber.50 match cartridge for use in the XM107 Long Range Sniper Rifle (LRSR) 3/27

4 LONG RANGE TACTICAL SNIPER CARTRIDGE ORD REQUIREMENTS Improved accuracy against antipersonnel targets @1000m Ballistic Match with MK211 Penetrate PASGT Vest @ 1000m 4/27

5 LONG RANGE TACTICAL SNIPER CARTRIDGE ORD ApprovalDec 01 Solicitation ReleasedDec 01 Bid Sample TestMar – May 02 DT/OT TestingJan – Apr 03 Type Classification StandardSep 03 Key Dates 5/27

6 M67 ELECTRO MECHANICAL FUZE 6/27

7 M67 ELECTRO MECHANICAL FUZE SYSTEM DESCRIPTION AND CAPABILITIES Improve performance of the existing grenade thru the incorporation of an electro mechanical fuze Improve the storage life/reliability of the M67 grenade 7/27

8 M67 ELECTRO MECHANICAL FUZE PROGRAM REQUIREMENTS Compliant with MIL-STD-1911 Safety Redundancy Arming or Fire Control Delay Manually Operated Features Explosive Train Interruption Compatible with current M67 Grenade 8/27

9 M67 ELECTRO MECHANICAL FUZE Proposal/Bid SamplesMay-Jun 02 Bid Sample TestingJul-Sep 02 Contract AwardNov 02 Design ModificationDec 02 – Jul 03 Manufacture (250)Jul - Sep Preliminary TestingOct 03 – Dec 03 Manufacture (2500)Feb 04 – Aug 04 TestingOct 04 – Jun 05 Milestone C/TC-STDFeb 06 Key Dates 9/27

10 CLOSE COMBAT MISSION CAPABILITY KIT 10/27

11 CLOSE COMBAT MISSION CAPABILITY KIT DESCRIPTION OBJECTIVE: Type classify and field a dye-marker training round to enhance force on force training and simulate live fire combat DESCRIPTION: Commercially available training ammunition which contains a soft frangible projectile filled with a colored dye which allows for realistic force-on-force training 11/27

12 CLOSE COMBAT MISSION CAPABILITY KIT ORD REQUIREMENTS Capable of being used in M16/M4 (5.56mm) M249 (5.56mm) M9 Pistol (9mm) Prevent inadvertent use of service ammunition Retail functional characteristics of weapons Shall not degrade performance Must not penetrate skin @ 5m 12/27

13 CLOSE COMBAT MISSION CAPABILITY KIT ORD ApprovalFeb 02 Release SolicitationMar 02 Bid Sample TestJun 02 – Aug 02 Hardware FabricationNov 02 – Apr 03 DT/OT TestingJun 03 – Sep 03 Type Classification StandardMar 04 Key Dates 13/27

14 40MM SELF DESTRUCT FUZE 14/27

15 40MM SELF DESTRUCT FUZE DESCRIPTION Compatible with existing U.S. M430A1 design Demonstrating better functional reliability at graze angles on soft terrain and at full range Shall not degrade performance of M430A1 cartridge 15/27

16 40MM SELF DESTRUCT FUZE Program InitiationFeb 02 Release SolicitationMay 02 Bid Sample TestJun 02 – Sep 02 Contract AwardFeb 03 FabricationMar – Sep 03 DT/OT TestingMar – Aug 04 Type Classification StandardJan 05 Key Dates 16/27

17 NON LETHAL STINGBALL GRENADE 17/27

18 NON LETHAL STINGBALL GRENADE DESCRIPTION AND CAPABILITIES Hand thrown or weapon launched device used to distract/disorient crowd Produce loud flash/light output while dispersing payload at 360 o at minimum distance of 3m 18/27

19 NON LETHAL STINGBALL GRENADE ORD REQUIREMENTS Bursting radius – 3m(T) – 5m(O) Capable of being hand thrown or launched Compatible with existing US Army Shotguns (Mossberg 500) Throwing Range – 30 meters 19/27

20 NON LETHAL STINGBALL GRENADE Program InitiationOct 01 Small PurchaseOct - Dec 01 Validation TestingMar – May 02 Program Decision PointJun 02 Release SolicitationJul – Aug 02 Bid Sample TestOct – Jan 03 Contract AwardApr 03 ManufactureMay – Aug 03 DT/OT TestingSep – Jan 04 Type Classification StandardSep 04 Key Dates 20/27

21 12 GAUGE NON LETHAL EXTENDED RANGE AMMUNITION 21/27

22 DESCRIPTION OBJECTIVE: To type classify and field a 12 Gauge Non Lethal round capable of providing temporary incapacitation through blunt force 12 GAUGE NON LETHAL EXTENDED RANGE AMMUNITION 22/27

23 KEY REQUIREMENTS Capable of marking/identifying combatant Capable of functioning in current US Army fielded shotguns Must be effective at range exceeding performance of current 12 Gauge Non Lethal Ammunition (10- 20m) 23/27 12 GAUGE NON LETHAL EXTENDED RANGE AMMUNITION

24 ORD ApprovalOct 02 Small PurchaseNov 02 Requirements Validation Jan – Apr 03 Release SolicitationMay 03 Bid Sample TestJul – Sep 03 Contract AwardNov 03 ManufacturingJan – Mar 04 DT/OT TestingApr – Sep 04 Type Classification StandardApr 05 Key Dates 24/27 12 GAUGE NON LETHAL EXTENDED RANGE AMMUNITION

25 Reorganization of OPMSA Currently OPMSA is OPCON to PEO Ground Combat SystemsCurrently OPMSA is OPCON to PEO Ground Combat Systems PEO Soldier expected to activate 2Q02PEO Soldier expected to activate 2Q02 Seamless transition for our customersSeamless transition for our customers 25/27

26 OFFICE OF PM SMALL ARMS 26/27

27 SOLDIER ENHANCEMENT PROGRAM NEW START PROPOSAL PROCESS May - CBD announcement 1 Aug Proposals Due - OPMSA (1 Aug) Product Manager Small Arms, ATTN: SFAE-SDR-SSA/Mr. S. Dougherty, Building 151, Picatinny Arsenal, NJ 07806-5000, email: dougherty@pica.army.mildougherty@pica.army.mil - PEO SOLDIER PEO Soldier (Accept proposals through their website throughout the year at http://www.pmsoldiersystems.army.mil/public Dec - TSM & PM Soldier Equipment (based on needs assessment) determine which programs will be briefed at February review. Dec/Jan - Briefing charts prepared for February briefing Feb - Exec council meeting. EC reviews proposals and selects new starts. Feb - Oct - Write requirements documents 27/27


Download ppt "SMALL CALIBER REQUIREMENTS Advanced Planning Briefing to Industry (APBI) Ms. Bobbie Russell Lake City/Small Cal Team Leader USA Munitions & Armament Cmd."

Similar presentations


Ads by Google