Presentation is loading. Please wait.

Presentation is loading. Please wait.

PUR 2013-07 Miscellaneous Architectural and Engineering Services RFP Mandatory Pre-Proposal Conference July 22, 2013 [ Sample Image: Place a 9.5” x 4.75”

Similar presentations


Presentation on theme: "PUR 2013-07 Miscellaneous Architectural and Engineering Services RFP Mandatory Pre-Proposal Conference July 22, 2013 [ Sample Image: Place a 9.5” x 4.75”"— Presentation transcript:

1 PUR 2013-07 Miscellaneous Architectural and Engineering Services RFP Mandatory Pre-Proposal Conference July 22, 2013 [ Sample Image: Place a 9.5” x 4.75” image here ]

2 Agenda Welcome – E. Buddy Davis Brief Introductions RFP Overview –Deadlines –Scope of Requested Services –Tour of CBHC facility –Questions

3 1.2 Timeline and Summary - RFP July 12, 2013 – RFP Packets & Instructions released. July 22, 2013 – Mandatory Pre-proposal Meeting July 23, 2013 – Deadlines for Written Questions July 26, 2013 – Answers to Questions released August 2, 2013 – 4:00 p.m. Proposal deadline

4 1.2 Timeline and Summary – RFP, con’t. Week of August 5, 2013 –Evaluation Committee certifies firms and evaluates proposals. Week of August 12, 2013 –Presentations of top 3 firms August 15, 2013 – –Evaluation committee recommend top 3 firms to Executive Director

5 1.2 Timeline and Summary – RFP, con’t. August 22, 2013 –Executive Director recommends top 3 firms in rank order to Board. –Board Approves list of firms and authorizes negotiation with #1 ranked firm. August 23, 2013 Notice of Intent to Award issued. August 27 – September 5, 2013 –Contract negotiations completed.

6 Scope of Requested Services 1.4.1.1 Project 1- Building Envelope Services –North and South Balcony leaks –2 nd Floor Window seal leaks –Roof Leaks

7 North & South Balconies NorthEntranceSouth Entrance

8 2 nd Floor Window Leaks

9 Roof Leaks ELC tenant spaceCBHC IT area

10 Scope of Requested Services, con’t, 1.4.1.2 Project 2- Parking Lot –Remove tree roots and repair pavement –Sealcoat pavement –Re-stripe parking lines –Install traffic calming devices and speed limit signs –Add “No Parking Zones” in designated areas –Replace damaged car stops –Install new bike rack

11 Parking Lot Repair & Improvements

12 Repair, Sealcoat and Re-paint

13 Improvements – Traffic calming Parking EntranceSpeed Reduction

14 Improvements, con’t. Landscape curbingBike racks

15 Scope of Requested Services, con’t, 1.4.2 Potential Projects –Tenant Space Re-design –Innovations Lab Reconfiguration –Audio/Visual Technology Upgrades –HVAC units repair or replacement

16 Tenant Space Redesign

17 Deadline Summary Deadline for Written Questions –4:00 p.m. July 23, 2013 –Emailed to bdavis@childrensboard.orgbdavis@childrensboard.org Answers to Written Questions –4:00 p.m. July 26, 2013 Posted on www.childrensboard.org and www.demandstar.comwww.childrensboard.org www.demandstar.com RFP deadline –4:00 p.m. August 2, 2013 (CBHC clock) Delivered to CBHC office building Emailed to PUR201307RFP@childrensboard.orgPUR201307RFP@childrensboard.org

18 Deadlines, continued. Evaluation Committee Review (Week of August 5, 2013) –Certify all qualified firms. City and County qualified or based on statutory criteria in Section 287.055, Florida Statutes. –Hear presentations from top 3 firms, based on their total scores received. (Week of August 12, 2013) –Recommend top three ranked firms to CBHC Executive Director. Executive Director recommends top three ranked firms to Board for Approval – August 22, 2013 Board approves list of firms in rank order and authorizes negotiations with #1 ranked firm – August 22, 2013

19 Thank You! Questions! The End. Contact information: –E. Buddy Davis, Purchasing & Facilities Director –Direct Line: 813-204-1770 –Email – bdavis@childrensboard.orgbdavis@childrensboard.org


Download ppt "PUR 2013-07 Miscellaneous Architectural and Engineering Services RFP Mandatory Pre-Proposal Conference July 22, 2013 [ Sample Image: Place a 9.5” x 4.75”"

Similar presentations


Ads by Google