Presentation is loading. Please wait.

Presentation is loading. Please wait.

Oyster Bayou Marsh Restoration (CS-59) Kodi Collins, P.E. Engineering Division May 6, 2014 committed to our coast.

Similar presentations


Presentation on theme: "Oyster Bayou Marsh Restoration (CS-59) Kodi Collins, P.E. Engineering Division May 6, 2014 committed to our coast."— Presentation transcript:

1 Oyster Bayou Marsh Restoration (CS-59) Kodi Collins, P.E. Engineering Division May 6, 2014 committed to our coast

2 CWPPRA PPL 21 NOAA’s National Marine Fisheries Service (NMFS) is the Federal Sponsor CB&I - Design Consultant Create 510 acres of marsh Nourish 90 acres of saline marsh Create approximately 17,550 LF of earthen terraces Engineering and Design: Underway Phase 2 Funding Request: December 2014 Coastal Protection and Restoration Authority of Louisiana P ROJECT B ACKGROUND

3 P ROJECT V ICINITY M AP Coastal Protection and Restoration Authority of Louisiana

4 P ROJECT L AYOUT Coastal Protection and Restoration Authority of Louisiana

5 P ROJECT AREA C ROSSING Coastal Protection and Restoration Authority of Louisiana

6 B ORROW A REA Coastal Protection and Restoration Authority of Louisiana

7 B ORROW A REA Coastal Protection and Restoration Authority of Louisiana

8 M ARSH C REATION /C ONTAINMENT D IKE T YPICAL S ECTION Coastal Protection and Restoration Authority of Louisiana

9 E ARTHEN T ERRACE T YPICAL S ECTION Coastal Protection and Restoration Authority of Louisiana

10 S UMMARY OF E STIMATED Q UANTITIES Marsh Fill/Marsh Nourishment:3.7 MCY (cut) Containment Dikes: 45,260 linear feet Earthen Terraces: 17,550 linear feet Pumping Distance:5.5 miles (maximum) Coastal Protection and Restoration Authority of Louisiana

11 QUESTIONS


Download ppt "Oyster Bayou Marsh Restoration (CS-59) Kodi Collins, P.E. Engineering Division May 6, 2014 committed to our coast."

Similar presentations


Ads by Google