Shell Island West NRDA Restoration Catherine Ricks, P.E. Engineering May 6, 2014 committed to our coast.

Similar presentations


Presentation on theme: "Shell Island West NRDA Restoration Catherine Ricks, P.E. Engineering May 6, 2014 committed to our coast."— Presentation transcript:

1 Shell Island West NRDA Restoration Catherine Ricks, P.E. Engineering May 6, 2014 committed to our coast

2 Coastal Protection and Restoration Authority of Louisiana Presentation Outline Project Background Project Overview Map Project Features East Lobe West Lobe Borrow Areas Mississippi River – Dune/Beach & Sand Flat Offshore – Marsh Fill Project Schedule Overview Summary

3 Coastal Protection and Restoration Authority of Louisiana Project Background Shell Island West NRDA Restoration Project (BA-111) LCA Barataria Basin Barrier Shoreline (BBBS) Restoration Project Emergency Berm Project constructed in 2010 in response to the Deepwater Horizon Oil Spill, constructed a portion of the Shell Island East Lobe (W8). Shell Island East Berm Barrier Island Restoration Project (Shell East Berm), constructed in 2013 with Berm Enhancement Funds. Shell Island West NRDA Restoration Project (Shell West NRDA) is the construction of the remainder of the East Lobe and the entire West Lobe. Shell West NRDA is awaiting funding.

4 N MR-E MR-A MR-B 35-E Shell Island Coastal Protection and Restoration Authority of Louisiana BA-111 Shell West NRDA Overview Shell Island West Lobe Shell Island East Lobe

5 Coastal Protection and Restoration Authority of Louisiana Shell Island East Berm Project August 15, 2013 was the last day of dune fill placement. May 4, 2013 September 9, 2013 April 1, 2014

6 Beach/Dune at approximately 7,800 linear feet +8.0’ NAVD88 Uniform dune width of 340’ 2,839,000 cy (includes marsh sand flat) 176 acres Marsh sand flat at approximately 5,000 linear feet +2.5’ NAVD88 Turbidity Control Structure on the landward/bay side (no containment) 93 acres Marsh fill platform at approximately 3,000 linear feet +2.5’ NAVD88 Containment dike 486,200 cy 60 acres Coastal Protection and Restoration Authority of Louisiana Shell West NRDA East Lobe Plan View Marsh Sand Flat Marsh Fill (with containment) Dune/Beach Shell East Berm Project Access Channel Project Features – East Lobe (as of May 2013) Shell West NRDA East Lobe features include:

7 Coastal Protection and Restoration Authority of Louisiana 19,405 acres of coastal habitats benefited Shell West NRDA East Lobe Typical Cross-sections Marsh Fill Dune/Beach Break in Slope at Break in Slope at +1.0 Marsh Sand Flat 30 1 Containment Dike Primary Borrow Source Containment Dike Secondary Borrow Source Primary Dike 8 1

8 Beach/Dune constructed approximately 7,000 linear feet +8.0’ NAVD88 Uniform width of 380’ 2,234,000 cy 196 acres Marsh fill platform approximately 5,600 linear feet +2.5’ NAVD88 Containment dike 878,000 cy 134 acres Coastal Protection and Restoration Authority of Louisiana Shell West NRDA West Lobe Plan View Containment Dike Access Channel Marsh Fill Dune/Beach Project Features – West Lobe Shell West NRDA West Lobe features include:

9 Coastal Protection and Restoration Authority of Louisiana Shell West NRDA West Lobe Typical Cross-sections Containment Dike Borrow Source Dune/Beach Marsh Fill Primary Dike Containment Dike Borrow Source Marsh Fill Primary Dike Break in Slope at +1.0

10 Coastal Protection and Restoration Authority of Louisiana Shell West NRDA Dune/Beach and Sand Flat Borrow Areas MR-A 5.3 MCY (Volume are based on pre- Shell East surveys) Cut depths to -75’ NAVD88 and -80’ NAVD88 Project Features – Mississippi River Borrow Areas

11 Coastal Protection and Restoration Authority of Louisiana Shell West NRDA Dune/Beach and Sand Flat Borrow Areas MR-B 3.96 MCY (Volume are based on pre- Scofield surveys) Cut depths to -80’ NAVD88 Project Features – Mississippi River Borrow Areas

12 Coastal Protection and Restoration Authority of Louisiana Shell West NRDA Dune/Beach and Sand Flat Borrow Areas MR-E 3.5 MCY (Volume are based on Post- Construction Shell East surveys) Cut depths to -80’ NAVD88 Project Features – Mississippi River Borrow Areas

13 Coastal Protection and Restoration Authority of Louisiana Shell West NRDA Offshore Marsh Fill Borrow Area 35-E 15 MCY (Volume are based on pre-Shell East surveys) Cut depths to -51.0’ NAVD88 and -54.0’ NAVD88 Project Features – Offshore Borrow Area

14 Coastal Protection and Restoration Authority of Louisiana Tasks Completed: Bathymetric and Topographic Surveys – February 2011 and January 2012 Geophysical Investigation and Final Report (Borrow Areas)– May 2012 Geotechnical Investigation and Final Report (Fill Area) – August 2012 Coastal Use Permit – August 2012, Modification – June 2013 COE 404 Permit – October 2012, Modification – Not Required LDWF Fill Material Permit – February 2013 Engineering and Design Project Schedule Future Tasks: Update Bathymetric and Topographic Survey Update E&D Bid Process – Availability of Funding

15 Coastal Protection and Restoration Authority of Louisiana Dune/Beach Fill Volume: 5,073,000 cy Marsh Fill Volume: 1,123,000 cy Area of Fill: 342 acres Primary Dike: 10,790 linear feet Sand Fencing: 14,400 linear feet Settlement Plates: 17 plates Project Summary

16 Coastal Protection and Restoration Authority of Louisiana QUESTIONS