Partial results of the implementation of the project for the pilot County – Suceava and opportunities for regional expansion ECOREG.

Similar presentations


Presentation on theme: "Partial results of the implementation of the project for the pilot County – Suceava and opportunities for regional expansion ECOREG."— Presentation transcript:

1 Partial results of the implementation of the project for the pilot County – Suceava and opportunities for regional expansion ECOREG

2 1.Project management 2.Monitoring and evaluating the effectiveness 3.External audit 4.Introductory Seminar 5.Communication and dissemination actions at the beginning of the project (roll-up banner, website) 6.Identification of focal points 7.Interactive selection of focal points 8.Training in industrial ecosystems & biological theories of organizational systems The main activities developed during the project

3 9. Visited companies as focal points of the project 10. Dissemination of the interim results at regional level 11. Participation at international events dedicated for ETAP and industrial symbiosis 12. Identification and characterization of entities capable of being interconnected 13. Integrating different sustainability tools tailored for industries and local specific 14. Technical visits to the selected relevant industries in UK 15. Networks to seek synergies with other projects / initiatives help 16. Pre-feasibility analysis of the flows that will be interconnected The main activities developed during the project

4 Reported period 1 st of February 2009 – 30 th of October 2010

5 Project Team Ministry of Environment and Forests (coordinating beneficiary) International Synergies Ltd. Great Britain (partner beneficiary) National Research Institute - Bucharest ECOIND Development for Industrial Ecology (partner beneficiary) Ecological Group for Cooperation - GEC Bucovina (partner beneficiary)

6 Implementation Area Suceava County – pilot County Northeast Region Northeast Region

7 Activity 1 Project Management

8 1. Project management Project management is an ongoing activity that takes place at all stages of the project. It was established a Project Implementation Unit (PIU) at the focal area level - Suceava, with the local partner GEC Bucovina, and the Project Management Unit (PMU), organized within Consortium Coordinator - Ministry of Environment and Forests.

9 1. Project Management Working arrangements are in communication (working meetings and conferences on Yahoo Messenger) to identify and resolve all operational issues arising during project implementation so that any failures are avoided. Mutual information are promptly and simultaneously by all partners.

10 Management meeting – project team – Suceava, GEC headquarter, February 2009 1. Project management

11 Management meeting – project team – Suceava, GEC headquarter, February 2009 1. Project management

12 Project team meeting, after completing the Introductory Seminar Suceava, Gloria Complex, February 2009 1. Project management

13 Project team meeting, after completing the Introductory Seminar Suceava, Gloria Complex, February 2009 1. Project management

14 Project team meeting, after completing the Introductory Seminar Suceava, Gloria Complex, February 2009 1. Project management

15 Project team meeting, after completing the Introductory Seminar Suceava, Gloria Complex, February 2009 1. Project management

16 Two members of the project team from GEC Bucovina, with the project Manager from the Ministry of Environment and Forests participated in training regarding reporting requirements and implementation of the LIFE + program ( technical and financial reports), and issues relating to visibility requirements - Budapest, March 2009; 1. Project management

17 1. Project Management Project Manager presenting ECOREG application - LIFE + Training, Budapest, March 2009

18 1. Project management In April 2009, at INCD ECOIND partner headquarter from Bucharest, took place a team training of senior expert of the project, on the work of "facilitator", which carries out the project; was presented the UK experience ISL Carried out in the international program of industrial synergies and the British Government's national program - NISP;

19 1. Project management At GEC Bucovina headquarter, the project team organized and established the responsibilities for each team member for the organization of the first workshop of industrial symbiosis GEC Bucovina headquarter, Suceava, May 2009

20 1. Project management At the headquarter of GEC Bucovina - the project team is analyzing the deployment of the first workshop of industrial symbiosis, the extent participation of the invited companies, forms filled volume, the expected volume of synergies identified for each group of participating companies; the project team propose optimization measures of the organization of the following industrial symbiosis workshops ;

21 1. Project management The project team analyzes the results of the first industrial symbiosis workshop, Suceava, GEC headquarter, May 2009

22 1. Project management The project team analyzes the results of the first industrial symbiosis workshop, Suceava, GEC headquarter, May 2009

23 1. Project management The project team analyzes the results of the first industrial symbiosis workshop, Suceava, GEC headquarter, May 2009

24 1. Project management The project team analyzes the results of the first industrial symbiosis workshop, Suceava, GEC headquarter, May 2009

25 1. Project management In order to provide conciliation and validation of the resulting solutions from the synergies identified was organized a PAG (Project Advisory Group) meeting. PAG members have been contacted previously, they were presented the project objectives and mission of its members in implementing PAG. Establishing formal meeting held on 21 May 2009, at the Environmental Protection Agency headquarters in Suceava.

26 1. Project management In the first session, each group member presented himself, then the company he represents. Participants of the project team presented the first results from processing the forms and the evaluation questionnaires completed by the participating companies in the first workshop of industrial symbiosis.

27 1. Project management Images from the inaugural meeting of the PAG - Environmental Protection Agency, Suceava, May 2009

28 1. Project management Images from the inaugural meeting of the PAG - Environmental Protection Agency, Suceava, May 2009

29 1. Project management Images from the inaugural meeting of the PAG - Environmental Protection Agency, Suceava, May 2009

30 1. Project management Each participant reported on the localities where they were traveling, on public institutions and companies visited, the results of steps. These meetings were held with technical character. Regularly at GEC Bucovina headquarter were held workshops for team members information on the progress of the project implementation, problems encountered, solutions identified and the action plan for the next period.

31 1. Project management ISL partners provided the Romanian team with a consistent set of examples of case studies that show concrete examples of implementation of the concept of industrial synergy in previous projects (NISP). They have been studied, both to understand the philosophy approach to project objectives and to identify concrete ways of implementing the examples in the UK, in practical situations in the area of implementation.

32 1. Project management Regularly (weekly, bi-monthly) are organized conferences by connecting all the team members on Yahoo, the mutual information regarding the progress of the activities is achieved and the members plan the activities to address the new steps of implementation. During the management meeting of the consortium held in July 2009, at the Ministry of Environment and Forests headquarter, the participants discussed specific aspects of finding new synergies and broaden the scope of the project and in other counties in Northeast Region.

33 Activity 4 Introductory Seminar

34 4. 4. Introductory Seminar Date: 26.02.2009 Location: Suceava. Number of participants: over 150 persons. Objective: The official launch of the project, informing the representatives of business and public institutions on the project and expected results, presentation of the concept of industrial symbiosis, presenting British experience (NISP national program).

35 4. Introductory Seminar

36

37

38

39

40

41

42 Materials designed and distributed to participants: Invitation

43 4. Introductory Seminar Materials designed and distributed to participants: Presentation folder

44 4. Introductory Seminar ECOREG Poster

45 4. Introductory Seminar Participation diploma

46 Activity 5 Communication and dissemination actions at the beginning of the project

47 5. Communication and dissemination actions at the beginning of the project The ECOREG project site was published in April 2009 at: http://www.nisp-ecoreg.ro. It was developed by the consortium coordinator (Ministry of Environment and Forests). The website includes information about the project activities, press releases and media publicity activities, and also information on the concept of industrial symbiosis. An important section of the site is dedicated to successful case studies regarding the implemented synergies resulted from the industrial symbiosis workshops. On partner sites are posted information regarding the main events of the project ECOREG.

48 5. Communication and dissemination actions at the beginning of the project By participating on various events, team members had presented ECOREG application objectives, the implementation area, the beneficiaries and expected results. In May 2009, the team members from GEC Bucovina attended the International Symposium “Clean Water, Healthy People ", organized by the Center for Ecological Consulting Manchester, with the participation of European Environmental Bureau, based in Brussels. GEC Bucovina and ECA Galati are members of the European Environmental Bureau. With this occasion GEC Bucovina presented the ECOREG project, the objectives, the result and the sponsors.

49 The project team from GEC Bucovina viewing the ECOREG project website 5. Communication and dissemination actions at the beginning of the project

50 The project presentation from the International Symposium “Clean Water, Healthy People, Galaţi, May 2009 5. Communication and dissemination actions at the beginning of the project

51 The meeting with the Great Britain Ambassador – Mr. Robin Barnett The Great Britain Ambassador in Romania made a working visit in Suceava County, on which occasion he met with the ECOREG project team. They presented the objectives, the implementation team, expected results, the implementation stage. The event was hosted by the Environmental Protection Agency Suceava.

52 5. Communication and dissemination actions at the beginning of the project At the end of the meeting, Robin Barnett ambassador declared: “The ECOREG project is a great example of the public and the private environment cooperation, involving the nongovernmental organizations. The project represents an opportunity in the actual economic context, specially for small companies. It's an example of which must be done to reach a sustainable economic development ”

53 The meeting with the UK Ambassador in Romania Mr. Robin Barnett (May 2009, Environmental Protection Agency Suceava.) 5. Communication and dissemination actions at the beginning of the project

54 The meeting with the UK Ambassador in Romania Mr. Robin Barnett (May 2009, Environmental Protection Agency Suceava.)

55 5. Communication and dissemination actions at the beginning of the project The meeting with the UK Ambassador in Romania Mr. Robin Barnett (May 2009, Environmental Protection Agency Suceava.)

56 5. Communication and dissemination actions at the beginning of the project The meeting with the UK Ambassador in Romania Mr. Robin Barnett (May 2009, Environmental Protection Agency Suceava.)

57 5. Communication and dissemination actions at the beginning of the project The meeting with the UK Ambassador in Romania Mr. Robin Barnett (May 2009, Environmental Protection Agency Suceava.)

58 5. Communication and dissemination actions at the beginning of the project The meeting with the UK Ambassador in Romania Mr. Robin Barnett (May 2009, Environmental Protection Agency Suceava.)

59 5. Communication and dissemination actions at the beginning of the project The meeting with the UK Ambassador in Romania Mr. Robin Barnett (May 2009, Environmental Protection Agency Suceava.)

60 Activity 6 Identification of focal points

61 6. Identification of focal points In order to identify possible focal points there were conceived and submitted letters of presentation of the principles of industrial symbiosis. They were sent by mail or in person by the project team members, during their travel in the county for sending questionnaires for the identification and selection of potential focal points. Below there are images from April 2009 when the project team members visited potential focal points in Suceava: SC FACOS SA, ACET, SC MONDECO SRL, SC TERMICA SA, to present the project (financing, objectives, results) and co-opting representants of these companies in the PAG.

62 The activity of identifing potential focal points continued in the coming months, increasing the activity area and the number of organizations involved in the project. The project started with the approach of Suceava County, proposing to carry out its expansion in North-Eastern Region, respectively Botosani, Iasi, Neamt, Bacau, Vaslui. 6. Identification of focal points

63 SC FACOS SA visit, Suceava 6. Identification of focal points

64 The conference room from SC ACET SA, Suceava 6. Identification of focal points

65 The meeting with the experts from SCMONDECO SRL, Suceava 6. Identification of focal points

66 The SC TERMICA SA visit, Suceava 6. Identification of focal points

67 The ECOREG team visitin the Sauwdust power plant from Vatra Dornei 6. Identification of focal points

68 The ECOREG team visitin the Sauwdust power plant from Vatra Dornei

69 The ECOREG team visitin the Power Plant from Vatra Dornei 6. Identification of focal points

70 ECOREG team at the headquarter of Dorna EcoHouse from Vatra Dornei 6. Identification of focal points

71 The Dorna EcoHouse principal presenting the Eco Passive concept 6. Identification of focal points

72 ECOREG team was received by the Mayor of Vatra Dornei 6. Identification of focal points

73 Paul Knuckle (ISL partner, UK) receiving the medal with the emblem of Vatra Dornei 6. Identification of focal points

74 The ECOREG team with the environment responsible from Termica SA, In the waste dumps area. 6. Identification of focal points

75 The ECOREG team at the ecological incinerator MONDECO 6. Identification of focal points

76 ECOREG team at MONDECO During the visits were discussed concrete aspects with the economic agents regarding industrial symbiosis. Were discussed specific issues on identified synergies in the workshops, working on their progress and possible new industrial synergies (eg, providing heat to the complex Iulius Mall, located in the neighborhood or the fruit and vegetable greenhouses located in the Suceava River floodplain) 6. Identification of focal points

77 In the picture GEC team discussing with SC Termica SA, at its headquarter 6. Identification of focal points

78 In the picture GEC team discussing with SC Termica SA, at its headquarter

79 Image from Symmetrica Vereşti headquarter, ECOREG team members the representants of Symmetrica Vereşti and Termica SA 6. Identification of focal points

80 Image from Symmetrica Vereşti headquarter, ECOREG team members the representants of Symmetrica Vereşti and Termica SA

81 GEC team visiting the “Galina Rosso” farm, discussing the synergies identified at Dorohoi workshop 6. Identification of focal points

82 GEC team visiting the “Galina Rosso” farm, discussing the synergies identified at Dorohoi workshop

83 6. Identification of focal points GEC team visiting the “Galina Rosso” farm, discussing the synergies identified at Dorohoi workshop

84 GEC team with the representants of Adonis Farm 6. Identification of focal points

85 SC Ritmic SRL 6. Identification of focal points

86 The Treatment Plant Rădăuţi 6. Identification of focal points

87 GEC team at Adonis Farm 6. Identification of focal points

88 GEC team at Radio Tel Rădăuţi 6. Identification of focal points

89 GEC team at Radio Tel Rădăuţi 6. Identification of focal points

90 Radio Tel Rădăuţi 6. Identification of focal points

91 Radio Tel Rădăuţi 6. Identification of focal points

92 SC Rom Carpat SRL 6. Identification of focal points

93 SC Tauzend Mark SRL 6. Identification of focal points

94 SC Evalex SRL 6. Identification of focal points

95 ECOREG team at EGGER 6. Identification of focal points

96 Images from the Vama and Câmpulung area companies meeting 6. Identification of focal points

97 Images from the Vama and Câmpulung area companies meeting

98 ECOREG team discussing possible synergies resulting from the closure of the tailings dump Călimani 6. Identification of focal points

99 Operation of sulfur Călimani 6. Identification of focal points

100 ECOREG team at Rădăuţi City Hall 6. Identification of focal points

101 Activitatea 7 Interactive selection of focal points

102 7. Interactive selection of focal points This activity is an ongoing process that began in 2009 and continues until project completion in 2011, in order to select the participating units in the project and to identify optimal connections between companies, so the effects of the applying principles of the ECOREG project will be as visible and attracted to the project beneficial for organizations.

103 For this activity were carried out visits to administrative and economic institutions in Suceava county, to identify resources that can be harnessed through synergies and their advisers on the principles of industrial symbiosis. It was made a detailed analysis of available data, regarding the demand / supply of resources. Were held discussions and meetings with GAP members, managers of some top companies in the area where they operate, in order to supervise the proposed use of the synergies identified. 7. Interactive selection of focal points

104 Activitatea 8 Training in industrial ecosystems & biological theories of organizational systems

105 The main workshops of the project were: Industrial Symbiosis Workshop - SuceavaIndustrial Symbiosis Workshop - Suceava Industrial Symbiosis Workshop– Vatra Dornei.Industrial Symbiosis Workshop– Vatra Dornei. Industrial Symbiosis Workshop– RădăuţiIndustrial Symbiosis Workshop– Rădăuţi Industrial Symbiosis Workshop– DorohoiIndustrial Symbiosis Workshop– Dorohoi Mini-workshop Termica – SuceavaMini-workshop Termica – Suceava Regional seminar to disseminate the partial results - Bacau, November 2010Regional seminar to disseminate the partial results - Bacau, November 2010 8.Training in industrial ecosystems & biological theories of organizational systems

106 Industrial Symbiosis Workshop Suceava, 2009 Date: 20.05.2009; Location: Suceava; Number of participants : 41 economic agents from Suceava and 2 from Neamţ County, divided in 5 groups, which one guided by a “facilitator”; Results: there were 181 available resources (waste wood, plastic, paper, textiles, leather goods, building materials, waste water, packaging, logistics, consulting services, storage facilities) and 91 were identified synergies.

107 (The workshop from Suceava was the first of its kind held in the Project ECOREG - Applying the principles of industrial ecosystems in regional development ", funded by the European Union LIFE +.) the beginning of the event: the workshop started with a brief presentation of the abstract concept of industrial symbiosis, specific examples of resources / needs and specific instructions for carrying out work in the actual workshop informative-consultative session : presentations covered the first part of the event, commented on powerpoint presentations. Working session: the workshop was actually focused on identifying and promoting synergies, as the innovative, environmentally friendly, socially beneficial impact, reducing the economic crisis, were prepared examples of synergy, records with possible resources that can exploit. conclusins: open discussions, proposals, suggestions, socialactivities. Industrial Symbiosis Workshop Suceava, 2009

108 Images from Suceava workshop, May 2009 Industrial Symbiosis Workshop, Suceava, 2009

109 Images from Suceava workshop, May 2009

110 Industrial Symbiosis Workshop, Suceava, 2009 Images from Suceava workshop, May 2009

111 Industrial Symbiosis Workshop, Suceava, 2009 Images from Suceava workshop, May 2009

112 Industrial Symbiosis Workshop, Suceava, 2009 Images from Suceava workshop, May 2009

113 Example of have form Industrial Symbiosis Workshop, Suceava, 2009

114 Example of want form Industrial Symbiosis Workshop, Suceava, 2009

115 Atelierul de lucru Vatra Dornei, decembrie 2009 Date: 16.12.2009 Location: Vatra Dornei Number of participants:42 economic and social agents in Suceava County Results : there were 123 available resources (waste wood, plastic, paper, textiles, leather goods, building materials, water waste, packaging, logistics) and 32 were identified synergies.

116 Industrial Symbiosis Workshop Vatra Dornei, 2009 At the beginning of the event, short speeches were given by public authorities who also sent their greetings to the event participants and organizers.The greetings were sent from Vatra Dornei city hall (Sutodoc Nicolai). In the first part of the event, informative session – advisory, were presented: Ecoreg project team for implementation of the EU Life + Programme, objectives and expected results. Also, detailed concepts of the industrial symbiosis and NISP Programme of the UK. The presentations covered the first part of the event, commented on the powerpoint presentations (in attractive formats, exciting) and were supported by: Iulia Degeratu project manager (Environment and forest Ministry), Beatrice Ştef ă nescu (GEC Bucovina), Paul Knuckles (ISL UK), Lucian Constantin (INCD ECOIND Bucureşti).

117 Industrial Symbiosis Workshop Vatra Dornei, 2009 In the second part, working session, of the workshop was actually focused on identifying and promoting synergies, innovative solutions, environmentally friendly, socially beneficial impact that minimizes the economic crisis through which the Romanian economy in general and regional (north eastern Romania), in particular. Participants were given lists of supply and demand RESOURCES for filling.They were assisted by trained facilitators: Mihai Ştef ă nescu (INCD ECOIND Bucharest), Lucian Constantin (INCD ECOIND Bucharest), Ionuţ Muşetoiu (Environment and Forest Ministry), Loreta Cauteş (GEC), Constantin Filote (GEC). Participants were ensured during the whole work, coffee, selection of teas, mineral water, juices.

118 Industrial Symbiosis Workshop from Vatra Dornei, 2009 objectives Promoting new approaches to waive the traditional way of seeing waste as useless material, disturbing, making them participants in the design of the workshop - "resources. "

119 Promoting the concept of industrial symbiosis, which means not only the recovery of waste, but all resources, materials, management, excess production capacity or storage of equipment, logistics specialists, specialized expertise in any field, etc.. Industrial Symbiosis Workshop from Vatra Dornei, 2009 objectives

120 Identification through civilized dialogue and common work in teams, by all participants in the event, of the new solutions, some innovative, based on the experience of the project team ECOREG experts, representatives of public institutions responsible for environmental protection. Industrial Symbiosis Workshop from Vatra Dornei, 2009 objectives

121 Images fromVatra Dornei workshop, December 2009 Industrial Symbiosis Workshop from Vatra Dornei, 2009

122 Images fromVatra Dornei workshop, December 2009 Industrial Symbiosis Workshop from Vatra Dornei, 2009

123 Images fromVatra Dornei workshop, December 2009 Industrial Symbiosis Workshop from Vatra Dornei, 2009

124 ECOREG poster, Vatra Dornei Workshop

125 Industrial Symbiosis Workshop R ă d ă uţi, 2010 Date: 9.06.2010 Location: Rădăuţi Number of participants: 71 economic and social agents in Suceava County Results: there were 158 available resources (waste wood, plastic, paper, textiles, leather goods, building materials, waste water, packaging, logistics, consulting services, storage facilities) and 69 were identified synergies.

126 Industrial Symbiosis Workshop Agenda R ă d ă uţi, 2010 The manifestation in Radauti was the third of its kind, organized within the "ECOREG- Application of industrial ecosystems in regional development, founded by the European Union’s LIFE +.The manifestation in Radauti was the third of its kind, organized within the "ECOREG- Application of industrial ecosystems in regional development, founded by the European Union’s LIFE +. At the beginning of the event, short speeches were given by public authorities who also sent their greetings to the event participants and organizers. The greetings were sent to: the City Hall Radauti (Andrei Martinescu, Mayor counselor Radauti), Suceava Environmental Protection Agency (Iluţă Cocriş, interim executive director) and Employers private SMEs, Branch Suceava (Michael Deliu, Chairman).At the beginning of the event, short speeches were given by public authorities who also sent their greetings to the event participants and organizers. The greetings were sent to: the City Hall Radauti (Andrei Martinescu, Mayor counselor Radauti), Suceava Environmental Protection Agency (Iluţă Cocriş, interim executive director) and Employers private SMEs, Branch Suceava (Michael Deliu, Chairman). In the first part of the event were presented: Ecoreg project team for implementation of the EU Life + Programme, objectives and expected results. Also, detailed concepts of the industrial symbiosis and NISP Programme of the UK.In the first part of the event were presented: Ecoreg project team for implementation of the EU Life + Programme, objectives and expected results. Also, detailed concepts of the industrial symbiosis and NISP Programme of the UK. In the second session of the workshop was actually focused on identifying and promoting synergies, innovative solutions, environmentally friendly, socially beneficial impact that minimizes the economic crisis through which the Romanian economy in general and regional (north eastern Romania), in particular.In the second session of the workshop was actually focused on identifying and promoting synergies, innovative solutions, environmentally friendly, socially beneficial impact that minimizes the economic crisis through which the Romanian economy in general and regional (north eastern Romania), in particular.

127 Industrial Symbiosis Workshop R ă d ă uţi, 2010 Participants were given lists of supply and demand RESOURCES identified by the project team from the workshops of Suceava (May 2009) and Vatra Dornei (December 2009). Also, participants were provided lists of possible use of resources, grouped by category. At the end of this working session, all participants were served lunch, during which they continued socializing, establishing contacts and discussions. The hall had the necessary facilities for audio-video equipment, projection screen

128 Images from Rădăuţi workshop, June 2010 Industrial Symbiosis Workshop R ă d ă uţi, 2010

129 Images from Rădăuţi workshop, June 2010 Industrial Symbiosis Workshop R ă d ă uţi, 2010

130 Images from Rădăuţi workshop, June 2010 Industrial Symbiosis Workshop R ă d ă uţi, 2010

131 Images from Rădăuţi workshop, June 2010 Industrial Symbiosis Workshop R ă d ă uţi, 2010

132 ECOREG posters EN and RO versions

133 Date: 6 July 2010. Locaţion: Dorohoi, Botoşani County. Number of participants: 84 economic and social agents in Suceava County Results: there were 158 available resources (waste wood, plastic, paper, textiles, leather goods, building materials, waste water, packaging, logistics, consulting services, storage facilities) and 69 were identified synergies. Industrial Symbiosis Workshop Dorohoi, 2010

134 The manifestation in Dorohoi was the fourth of its kind, organized within the "Ecoreg - Application of industrial ecosystems in regional development, founded by the European Union’s LIFE +. At the beginning of the event, short speeches were given by public authorities who also sent their greetings to the event participants and organizers. The greetings were sent to: Suceava Environmental Protection Agency (Iluţă Cocriş, interim executive director), Botosani Environmental Protection Agency (Mateciuc Eugen, deputy chief). The presentations covered the first part of the event, commented on the powerpoint presentations (in attractive formats, exciting) and were supported by: Iulia Degeratu (project manager, Ministry of Environment and Forests), Beatrice Stefanescu (GEC Bucovina), James Woodcock (ISL UK), Lucian Constantin (Bucharest ECOIND). In the second part, working session, of the workshop was actually focused on identifying and promoting synergies, innovative solutions, environmentally friendly, socially beneficial impact that minimizes the economic crisis through which the Romanian economy in general and regional (north eastern Romania), in particular.

135 Participants were given lists of supply and demand of resources identified by the project team from Suceava Workshops (May 2009), Vatra Dornei (December 2009) and Radauti (June 2010). Participants were provided lists of possible uses of resources, grouped by category (to facilitate the process of designing cards with "demand" and "supply" of participating companies. Information about the resources of any kind (including waste), or surplus, whether they search, represented the starting point in identifying new business opportunities throughout the Dorohoi Workshop, July 2010. Participants were assisted by experts from the project team to identify any resources that surplus (supply, output) leaving the company / institution and / or entail excessive cost or in many cases create problems for storage, transport,neutralization etc Industrial Symbiosis Workshop Dorohoi, 2010

136 Images from Dorohoi workshop, July 2010 Industrial Symbiosis Workshop Dorohoi, 2010

137 Images from Dorohoi workshop, July 2010 Industrial Symbiosis Workshop Dorohoi, 2010

138 Images from Dorohoi workshop, July 2010 Industrial Symbiosis Workshop Dorohoi, 2010

139 Images from Dorohoi workshop, July 2010 Industrial Symbiosis Workshop Dorohoi, 2010

140 ECOREG poster, Dorohoi workshop, July 2010

141 Date 7.07.2010. Location: Suceava City Hall. Număr participanţi: 30 persons (employees from SC Termica SA, ACET SA, representatives of construction companies and material transport, sanitation employees in companies, public officials in the municipality of Suceava, the project team). Objetives: organizing a formal framework to discuss the progress on the issue of synergies from the waste dumps Termica SA and newly identified synergies Mini-Workshop Suceava, 2010

142 MiniW-orkshop Suceava, 2010 The manifestation from Suceava was the fifth of its kind, organized within the "Ecoreg - Application of industrial ecosystems in regional development, funded by the European Union LIFE +. This event was a "mini-workshop" and assumed the participation of a limited number of guests, and discuss achieving synergies identified on a smaller field of activity. Basically, the main objective of the workshop was to mobilize better the firms in Suceava and the surrounding area, covering the construction activity (default pickling works, demolition, etc.), to transport and store waste liabilities arising from these activities, the deposits of slag and tailings from TERMICA SA in case of closure, with the 2011 period. At TERMICA SA the sole shareholder is Suceava CityHall.

143 Mini-Workshop Suceava, 2010 The possibility that TERMICA SA to achieve its target of closing time deposit liabilities using waste from demolition, was identified by the Ecoreg project team in spring 2009, soon after launching the Ecoreg project (February 2009, Suceava). From that moment, the project team followed the progress of identified synergies, the practical way they have developed and evolved. The purpose of organizing the workshop was to provide the framework within which participants can discuss and evaluate, together with team members, the fastest solutions, efficient and inexpensive to the problem faced by TERMICA and, meantime, construction firms, performing etching of asphalt, demolition, etc. - and do not have a solution for storage of material derived from this work.

144 Mini-Workshop Suceava, 2010 In this mini-workshop, ECOREG team put in contact the construction companies and Termica SA, with the purpose to use the construction materials be to close the Termica cells by 2011.

145 Images of Suceava Mini-workshop, July 2010 Mini-Workshop Suceava, 2010

146 Images of Suceava Mini-workshop, July 2010 Mini-Workshop Suceava, 2010

147 Images of Suceava Mini-workshop, July 2010 Mini-Workshop Suceava, 2010

148 Images of Suceava Mini-workshop, July 2010 Mini-Workshop Suceava, 2010

149 Activity 9 Visited companies as focal points of the project

150 9. Visited companies as focal points of the project This activity is foreseen in the project implementation since the second half of 2009 and aims to monitoring progress in implementing the synergies identified in the workshops of industrial symbiosis. It is an ongoing activity that continues after the first identification of synergies, with Form and resources (request /offer) processing.

151 Activity 11 Participation at international events dedicated for ETAP and industrial symbiosis

152 11. Participation at international events dedicated for ETAP and industrial symbiosis It envisages the participation of team members with presentations and communications, actions of disseminate of the interim results in international events and other events with wide visibility. It is an ongoing activity that requires both elements of interactivity with other professionals / programs / projects and communication of project results.

153 Activitatea 12 Identification and characterization of entities capable of being interconnected

154 12. Identification and characterization of entities capable of being interconnected Activity fieldCompanies number Timber industry37 Heat production5 Auto service, industrial equipment12 Electronics, retail14 Hazardous waste treatment and waste oil processing3 Beverages12 Mining industry11 Construction materials14 Infrastructure works2 Food industry18 Waste collection and landfilling7 Pulp and paper industry1 Tanneries and textiles8 Sanitation8 Local administration34 Hospitals7 Education units (schools, universities)12 Transport4 Cosmetics1 Companies involved in synergies distribution fields

155 Graph of the distribution fields of companies involved in synergies 12. Identification and characterization of entities capable of being interconnected

156 Among the potential synergies identified through Industrial Symbiosis Workshops, only certain processes / streams / wastes could be selected through a detailed analysis later in order to characterize and improve. Partnerships already concluded or which will be established based on symbiotic criteria will improve the effectiveness of each partner by the detection of waste markets, its principal or secondary products. ECOREG project encourages businesses to look beyond traditional markets for business opportunities, punctuate the economic benefits of this approach in order to stimulate economic development with environmental compliance, by reconsidering the "waste“ as "resource". 12. Identification and characterization of entities capable of being interconnected

157 CONCLUSIONS AND COMMENTS Establishing synergies is not the simple identification of the potential collaboration between two companies. This implies a lot of work: the managers of both companies involved in synergy identified must be visited and convinced with pencil on paper, that it is beneficial synergy, in a period of economic contraction. (Managers have other emergencies (unpaid salaries, debts, unable to attend the auctions because debt contracts outstanding, and unpaid work or deliveries, redundancy talks with unions - where, etc..). There are companies where the manager is also the accounting and driver and a lawyer and technologist, and all commodities and this is because he can not afford to pay specialists.

158 Synergies contribution at improving the economic situation of the companies must be significant and explained to the managers in detail, with intelligent arguments. (No manager will be concerned with the implementation of synergies, because in this way he will not pollute the environment or will reduce their consumption. With the environment pollution and the uneconomic consumed resources, managers could manage somehow until now. The manager must be convinced of the profit that he could get from a synergy.) CONCLUSIONS AND COMMENTS

159 Project is not limited to simple synergies, obvious, such as sawdust valorification or superior capitalization of construction debris landfill. (ECOREG team experts have expertise and have already provided solutions for superior recovery of waste and secondary resources (for ex., for the lamps burned for electrical equipment collected from plants for waste food and drinks which can be used in biogas For agricultural recovery or ash as additives for cement and concrete recipes or materials during cold chains, etc.). CONCLUSIONS AND COMMENTS

160 Identifying and designing complex synergies is requiring multiple materials tests, and waste characterization. (Are harmful, can be transported on public roads, what precautions must be taken, should be packaged as such could be neutralized, who could legally make such operations, the operators are trained and authorized to do so? The process requires testing of technologies (at ECOIND INCD), wastewater flows are necessary analysis, balance sheets, developing solutions). CONCLUSIONS AND COMMENTS

161 Regarding the resources that could be the object of a synergy, frequent offers in pilot county - Suceava are: wood and wood waste. Their sustainable use is not in combustion, even if they are renewable fuels, but in the recovery by generating added value. (For example, using waste wood for particle board or other purposes was identified at Egger Company from Radauti and Romanel Company from Vatra Dornei; unfortunately, these companies do not take timber products besides from forests managed sustainably (this is the firms policy, very healthy and for long term). CONCLUSIONS AND COMMENTS

162 Most wood waste manufacturers from the pilot county don`t have certificates supporting that the wood comes from forests managed sustainably, so their waste rot on the roadsides or, at best, are burned in the center. There were organized awareness raising for wood waste producers, so they know what can be done and so the waste they provided can become interesting for intensive companies like those mentioned). Experts have already prepared materials about the formalities that a wood waste producer would have to meet to certify the origin of the timber as the formalities which forest owners must comply. CONCLUSIONS AND COMMENTS

163 PILOT ACTIONS PROPOSED Identified needSolution The Industrial Synergies Workshops participants have called for a point of information, where to find the data already communicated to other partners and learn about the other partners offer and if their offer is interesting for other companies. Organizing a National Virtual Centre for Industrial Synergies (to promote the project ECOREG interim results and finding new synergies.)

164 Identified needSolution Access to all companies and institutions interested in using a common website to promote knowledge and offers / demand for resources and / or industrial synergies in progress / completed. Promoting the following categories of information: -Contact of companies / institutions (which have signed an agreement to accept the post) - offer or request for resources -the results of contacts (synergies in progress or completed) - Case studies. Organizing a virtual forum for the request and the need for reusable resources in companies and institutions PILOT ACTIONS PROPOSED

165 Identified needSolution Media coverage of interim and final results of the ECOREG project. Editarea de “noutăţi” în cadrul Editing the "news" in the Virtual Centre for Industrial Synergies, as an electronic publication type newsletter dedicated to the promotion of the project results with information such as technological solutions, examples of good practice, case studies, events. PILOT ACTIONS PROPOSED

166 Identified needSolution Stimulating with support actions and exchange performance management in terms of industrial application of the concept of synergy. Facilitating the experience exchange between companies, institutions, participation at the events organized within the project or by other organizations Promote models of good practice identified by applying the principles of industrial synergies. PILOT ACTIONS PROPOSED

167 Identified needSolution Facilitation of the meetings between academics and corporate sectors of activity and innovative areas of interest. Organization of workshops devoted to areas of activity, involving universities profile, development-research institutes and interested companies. Organizing national and regional events dedicated to the promotion of the industrial synergies concept. PILOT ACTIONS PROPOSED

168 SWOT ANALYSIS (Strengths, Weaknesses, Opportunities, Threats) for ECOREG project implementation in the northeast development area of Romania Strengths: the existence of well-trained human resources, relatively young and with possibilities to quickly adapt to European requirements; the existence of three universities that have as basic concerns in addition to education, scientific research, invention and technological innovation;

169 Strengths: The existence of Agriculture Research Station (in the areas of: fruit growing, viticulture, fishing, sheep, crops and forestry, and the Bank of Genetic Resources of Suceava (unique in South East Europe) - the expertise of specialists and researchers provide high value professional, scientific recognition; The existence of basic infrastructure for research, development, innovation and transfer technology (in the NE Region are activating 79 operating units, about 12% of the national total); SWOT ANALYSIS (Strengths, Weaknesses, Opportunities, Threats) for ECOREG project implementation in the northeast development area of Romania

170 Strengths: the existence of potential development fields, including innovation, such as food industry, construction machinery and equipment, light industry (knitwear, garments, footwear), organic agriculture industry, IT sector renewable energy, tourism, crafts; the existence of fixed and mobile telecommunications infrastructure and a well developed high coverage; SWOT ANALYSIS (Strengths, Weaknesses, Opportunities, Threats) for ECOREG project implementation in the northeast development area of Romania

171 Strengths: The area location on E85 European route which runs through the region of north-south segment of the Pan-European Corridor IX (highway Sofia - Chernivtsi) and its intersection with the linking of Moldova and Transylvania; The existence of the bus railway providing passenger and freight traffic through Moldova, Transylvania, Republic of Moldova and Ukraine; SWOT ANALYSIS (Strengths, Weaknesses, Opportunities, Threats) for ECOREG project implementation in the northeast development area of Romania

172 Strengths: The existence of the three international airports (Bacau, Iasi and Suceava, serving and Botosani), requirements for air cargo and passenger transport, customs services on demand; The Suceava Bazaar existence, a big shopping center in the area (draws a huge number of small merchants, including Republic of Moldova and Ukraine); SWOT ANALYSIS (Strengths, Weaknesses, Opportunities, Threats) for ECOREG project implementation in the northeast development area of Romania

173 Strengths: natural resources (fertile land, meadows, metal ores and non-metal, hardwood and softwood forests, mineral springs (over 100 sources in 30 localities), thermal springs, clay, sand and quartz sand, ballast, etc..) historical monuments and medieval art, including some owned by the UNESCO - are major tourist attractions; natural reserves and landscapes of great beauty; SWOT ANALYSIS (Strengths, Weaknesses, Opportunities, Threats) for ECOREG project implementation in the northeast development area of Romania

174 Strengths: fertile land, natural lakes, rivers and streams (attractive crop, livestock, fish, fruit, viticulture - is a tradition in these areas); spaces available for business development (administrative offices, warehouses, halls resulting from privatization and restructuring (eg., mining); operation (in Piatra Neamt) of the ADR NE (implementation and funding of regional and local development programs); SWOT ANALYSIS (Strengths, Weaknesses, Opportunities, Threats) for ECOREG project implementation in the northeast development area of Romania

175 Weaknesses: agricultural land degradation: water erosion, wind erosion, landslides, soil chemical pollution; inefficient agriculture and excessively fragmented agricultural area; insufficient funding from public and private investment; low level of investments in modernization and new technologies, especially for passenger public transport and freight infrastructure; SWOT ANALYSIS (Strengths, Weaknesses, Opportunities, Threats) for ECOREG project implementation in the northeast development area of Romania

176 Weaknesses: insufficient collaboration between research centers / universities and businesses to use research results and technology transfer to achieve the economic environment; the acute crisis of employment (without immediate prospects of resolution); an important segment of the population affected by poverty and social exclusion; SWOT ANALYSIS (Strengths, Weaknesses, Opportunities, Threats) for ECOREG project implementation in the northeast development area of Romania

177 Weaknesses: small number of investors, avoiding this area due to the distance from the capital and poor infrastructure; sewerage systems and water supply in cities are outdated or nonexistent in most rural settlements; lack of cultural activities in most communities, with effects on youth training; SWOT ANALYSIS (Strengths, Weaknesses, Opportunities, Threats) for ECOREG project implementation in the northeast development area of Romania

178 Weaknesses: uncontrolled deforestation, reaching the negative critical limit in environmental impacts; poor management of waste; absence of an organized network of agricultural market, farmers are forced to sell their own products or sell to "middlemen" at very low prices, leading to a very large gap between the prices of raw agricultural products sold by farmers to processors and price leather; SWOT ANALYSIS (Strengths, Weaknesses, Opportunities, Threats) for ECOREG project implementation in the northeast development area of Romania

179 Weaknesses: the vulnerability of local communities exposed to floods, manifested by the weak capacity to absorb the effects of the phenomenon of recovering after its passage; insufficient access to grants available to companies through regional, sectoral and European programs the foreign investment reducing in North East Region; SWOT ANALYSIS (Strengths, Weaknesses, Opportunities, Threats) for ECOREG project implementation in the northeast development area of Romania

180 Weaknesses: low level of entrepreneurial and innovative culture at the level of SMEs; the gap between the North-East and other developing regions (per capita gross domestic product is only 68.39% of the national level); insufficient exchange of experience, information and collaboration within the business environment at regional level; SWOT ANALYSIS (Strengths, Weaknesses, Opportunities, Threats) for ECOREG project implementation in the northeast development area of Romania

181 Opportunities: Romania is a member of the European Union, bringing new sources of investment, including Structural and Cohesion Funds, foreign direct investment, etc.. Romania adopted the legislation and environmental standards in line with the communitarian acquis; market liberalization and modernization of business models; infrastructure development business e-commerce / e-government; SWOT ANALYSIS (Strengths, Weaknesses, Opportunities, Threats) for ECOREG project implementation in the northeast development area of Romania

182 Opportunities: growing of innovation importance in European policies, regional and local availability of resources and local conditions: skilled labor, natural resources, historical and cultural monuments, folk traditions; rehabilitation and development of the regional tourism through public and private investment; opportunities for financing investment projects by national and European funds, regional and structural SWOT ANALYSIS (Strengths, Weaknesses, Opportunities, Threats) for ECOREG project implementation in the northeast development area of Romania

183 Opportunities: raising the awareness of the business role in economic development districts and regions; the possibility business environment development as a result in the construction of industrial parks and business incubators science; SME sector dynamics growth; development of electronic commerce and e-business market; SWOT ANALYSIS (Strengths, Weaknesses, Opportunities, Threats) for ECOREG project implementation in the northeast development area of Romania

184 Opportunities: possibility of developing regional trade due to location on the longest land border of the European Union, increasing number of the implemented projects in North - East, existence of PAG to identify innovative projects in regional business environment, encouraging the development of growth poles. SWOT ANALYSIS (Strengths, Weaknesses, Opportunities, Threats) for ECOREG project implementation in the northeast development area of Romania

185 Opportunities: the existence of a national development strategy which includes conclusions and recommendations of the European sustainable development strategies (Lisbon and Gothenburg) and of the 6th Environment Action Programme, to ensure the conservation, protection and improving the environment and human health protection the sustainable use of natural resources; granting of transitional periods to comply with relevant directives in the water sector, by 2015, respectively2018; SWOT ANALYSIS (Strengths, Weaknesses, Opportunities, Threats) for ECOREG project implementation in the northeast development area of Romania

186 Opportunities: improving infrastructure, waste management and efficient management of their development; support the programs co-financed by the European Union - ISPA PHARE and MUDP; development and organic farming; motivational prices for organic products; encouraging sustainable water use; SWOT ANALYSIS (Strengths, Weaknesses, Opportunities, Threats) for ECOREG project implementation in the northeast development area of Romania

187 Opportunities: ensuring sustainable use of natural habitats, wild flora and fauna, as well as reconstruction of damaged systems, providing financial support for Natura 2000 sites; information campaigns on protected areas and their importance; information / awareness of local communities regarding the access funding opportunities for sustainable development (eg the Environment Fund Administration program to protect water resources, integrated water supply, treatment, sewage and treatment, released October 5, 2010 ); SWOT ANALYSIS (Strengths, Weaknesses, Opportunities, Threats) for ECOREG project implementation in the northeast development area of Romania

188 Opportunities: promoting measures and actions for prevention, preparedness, protection and response to natural hazards - floods, droughts, landslides and earthquakes, in order to limit and eliminate the effects they produce on people and property of any kind; SWOT ANALYSIS (Strengths, Weaknesses, Opportunities, Threats) for ECOREG project implementation in the northeast development area of Romania

189 Threats: agricultural land and forest degradation, lack of technical development project basis; lack of programs to play in fallow land and degraded forest; reduced willingness of companies to achieve the expenditure in purchasing new technologies, mainly due to financial implications; reduced competitiveness for firms in the region on the European market; SWOT ANALYSIS (Strengths, Weaknesses, Opportunities, Threats) for ECOREG project implementation in the northeast development area of Romania

190 Threats: migration of skilled and specialized labor from the North East region of Romania to other regions and countries; increasing the number of people who work in subsistence agriculture, the lack of conversion of redundant programs or employment of young people in productive activities or services; nonexistent structures that integrate regional innovation systems ; SWOT ANALYSIS (Strengths, Weaknesses, Opportunities, Threats) for ECOREG project implementation in the northeast development area of Romania

191 Threats: lack of coherence and coordination between different sectoral and regional policies with economic development implications; increasing volumes of imported products on the Romanian market; low level of Romanian exports; crease in piracy and economic crime in general; weak involvement of regional and central government in solving the problems of local communities; SWOT ANALYSIS (Strengths, Weaknesses, Opportunities, Threats) for ECOREG project implementation in the northeast development area of Romania

192 Threats: increasing development disparities between Romania's development regions; unbalanced development between East country and other developing regions, chronic underdevelopment concentrated in the North East, there were significant intraregional disparities; higher exposure to North Eastern Development Region competition on global markets; SWOT ANALYSIS (Strengths, Weaknesses, Opportunities, Threats) for ECOREG project implementation in the northeast development area of Romania

193 Threats: socio-economic decline of many large urban centers and reduce their role in the development of adjacent areas; floods in recent years have highlighted both the weaknesses of the techniques used for flood protection and response capacity for the management of the phenomenon; SWOT ANALYSIS (Strengths, Weaknesses, Opportunities, Threats) for ECOREG project implementation in the northeast development area of Romania

194 Threats: pronounced depopulation, demographic phenomena with negative impact on socio-economic development of rural communities: an aging population (high percentage of the population aged over 60), aging workforce, high mortality (15.2 ‰ to 9.7 ‰ in urban areas with very high infant mortality rates and wide variations between regions), low birth rates; Climate change. SWOT ANALYSIS (Strengths, Weaknesses, Opportunities, Threats) for ECOREG project implementation in the northeast development area of Romania

195 Thank you! Ecological Group for Cooperation - GEC Bucovina Adress: Suceava, str. Doamna Maria Voichita nr. 1 Headquarter: str. Nicolae Balescu, nr. 1, parter Tel: 0230-531996 Fax: 0230-523365 Mobil phone: 0722-387525 / 0744-774858 E-mail: gecbucovina@rdslink.ro website: www.gecbucovina.ro