Presentation is loading. Please wait.

Presentation is loading. Please wait.

PMA 265 – F/A-18 UID Program Overview F/A-18A-F, EA-18GF/A-18A-F, EA-18G ASN-RDAMr John YoungASN-RDAMr John Young DASN LogisticsMr Nicholas KuneshDASN.

Similar presentations


Presentation on theme: "PMA 265 – F/A-18 UID Program Overview F/A-18A-F, EA-18GF/A-18A-F, EA-18G ASN-RDAMr John YoungASN-RDAMr John Young DASN LogisticsMr Nicholas KuneshDASN."— Presentation transcript:

1 PMA 265 – F/A-18 UID Program Overview F/A-18A-F, EA-18GF/A-18A-F, EA-18G ASN-RDAMr John YoungASN-RDAMr John Young DASN LogisticsMr Nicholas KuneshDASN LogisticsMr Nicholas Kunesh PEO TACAIRRDML Dave VenletPEO TACAIRRDML Dave Venlet PMA 265 CAPT Donald GaddisPMA 265 CAPT Donald Gaddis NAVAIRSYSCOMVADM Wally MassenburgNAVAIRSYSCOMVADM Wally Massenburg Boeing, St LouisAir Vehicle SystemsBoeing, St LouisAir Vehicle Systems GE – LynneGFE EnginesGE – LynneGFE Engines F/A-18A-D- In-Service/Out of ProductionF/A-18A-D- In-Service/Out of Production F/A-18 E/F- FRPF/A-18 E/F- FRP EA-18G - SDD ProgramEA-18G - SDD Program FIRST- E/F PBL for Product SupportFIRST- E/F PBL for Product Support

2 UID Re-Engineering ProcessesUID Re-Engineering Processes Identify mission critical systemsIdentify mission critical systems Use OPNAV Mission Essential Subsystems Matrix (MESM)Use OPNAV Mission Essential Subsystems Matrix (MESM) PMA 265 Systems IPT inputsPMA 265 Systems IPT inputs Evaluate most effective way to mark assets based on availability, time constraints and costEvaluate most effective way to mark assets based on availability, time constraints and cost Identify who will mark itemsIdentify who will mark items tiger teamtiger team VendorsVendors OEMOEM DepotDepot OrganicOrganic CommercialCommercial Coordinate best sites and processes (IMC, Mod Lines, etc)Coordinate best sites and processes (IMC, Mod Lines, etc) Coordinate implementation scheduleCoordinate implementation schedule Add to Registry as change occursAdd to Registry as change occurs Repeat for next level of priorityRepeat for next level of priority PMA 265 – F/A-18 UID Program Overview

3 Schedule OverviewSchedule Overview December 2003E/A-18G SDD Contract Let w/ UID RequirementDecember 2003E/A-18G SDD Contract Let w/ UID Requirement 08 July 2004PMA 265 Designated a UID POC – Tracy Moran08 July 2004PMA 265 Designated a UID POC – Tracy Moran 15 July 2004Held PMA 265 UID Strategy Session15 July 2004Held PMA 265 UID Strategy Session 11 Aug 2004Developed Standard F/A-18 E/F/G UID SOW11 Aug 2004Developed Standard F/A-18 E/F/G UID SOW 27 Oct 2004 Held F/A-18 UID/RFID Industry Day at Boeing27 Oct 2004 Held F/A-18 UID/RFID Industry Day at Boeing 10 Nov 2004Updated UID SOW to SOO w/ Industry Inputs10 Nov 2004Updated UID SOW to SOO w/ Industry Inputs 12 Nov 2004 Establish a Legacy Item UID Review team and12 Nov 2004 Establish a Legacy Item UID Review team and Determine Mission Critical Systems for Model Plan 30 Nov 2004Submit Model Plan30 Nov 2004Submit Model Plan To Meet Oct 2010 Compliance RequirementTo Meet Oct 2010 Compliance Requirement 01 May 2005 Begin amending existing contractswith UID language as appropriate01 May 2005 Begin amending existing contractswith UID language as appropriate 31 Oct 2005 Physically begin marking Legacy equipment31 Oct 2005 Physically begin marking Legacy equipment 31 Oct 2010 Meet UID compliance on all assets31 Oct 2010 Meet UID compliance on all assets Budget ImpactsBudget Impacts Funding requirement unknown; not identified in FY 05/06/07 BudgetsFunding requirement unknown; not identified in FY 05/06/07 Budgets Resource requirements will be submitted in POM 08Resource requirements will be submitted in POM 08 Will affect rate of UID implementationWill affect rate of UID implementation

4 PMA 265 – F/A-18 UID Compliant Nameplate

5 PMA 265 – F/A-18 UID Program Overview Supporting Infrastructure AspectsSupporting Infrastructure Aspects OEMs/SuppliersOEMs/Suppliers Utilize PBL contracts, as appropriate Utilize PBL contracts, as appropriate NAVAIR Program Office (IPTs, Tiger Teams, PETs etc.)NAVAIR Program Office (IPTs, Tiger Teams, PETs etc.) Centralized Support/Management Activity under Mission Systems Logistics LeadCentralized Support/Management Activity under Mission Systems Logistics Lead As needed support from other Program Office teamsAs needed support from other Program Office teams Coordinate with NAVAIR and Navy UID LeadsCoordinate with NAVAIR and Navy UID Leads MOU/MOA with other PMAs for GFE etc.MOU/MOA with other PMAs for GFE etc. NADEPNADEP Utilized for sample marking and evaluation of marking technology on assetsUtilized for sample marking and evaluation of marking technology on assets Evaluate for use as a partner to mark assets through PBL, if appropriateEvaluate for use as a partner to mark assets through PBL, if appropriate FleetFleet Support needed for Carriers/Shore Stations/SquadronsSupport needed for Carriers/Shore Stations/Squadrons

6 V-22 UID Anecdote V-22 DAB Brief July 2004 –Anticipated earliest possible implementation for full compliance via 2006 contract (lot 10) Requested Bell-Boeing costs 2005 (Lot 9) advance acquisition contract already signed; will implement as practicable –Looking for ways to expand UID implementation ROM Submittal 9/30/04 –Scoped to meet draft NAVAIR policy to mark only items with MIL-STD 130 nameplate (341 items) –~90% of items from subcontractors –~20% of subs responded with input for ROM –Lot 10 ROM: > $25M –PR-07 Issue submitted to modify Lot 10 –Bell-Boeing requested NAVAIR & OSD support Supplier Conference


Download ppt "PMA 265 – F/A-18 UID Program Overview F/A-18A-F, EA-18GF/A-18A-F, EA-18G ASN-RDAMr John YoungASN-RDAMr John Young DASN LogisticsMr Nicholas KuneshDASN."

Similar presentations


Ads by Google