Presentation is loading. Please wait.

Presentation is loading. Please wait.

CE 515 Railroad Engineering Line-haul Operations Source: Armstrong Ch 13 “Transportation exists to conquer space and time -”

Similar presentations


Presentation on theme: "CE 515 Railroad Engineering Line-haul Operations Source: Armstrong Ch 13 “Transportation exists to conquer space and time -”"— Presentation transcript:

1 CE 515 Railroad Engineering Line-haul Operations Source: Armstrong Ch 13 “Transportation exists to conquer space and time -”

2 Line-Haul Operations “To safely and efficiently conduct its line-haul operations a railroad must coordinate many otherwise independent activities across a rail network.” – Armstrong Ch. 13, pg 221 What does this mean?

3 Line-Haul Operations Communication Operational practices Safety Coordination

4 Line-Haul Operations We’ve already done this, so what?

5 Line-Haul Operations We’ve already done this, so what? Let’s see just how everything fits together.

6 Line-Haul Operations – We are going on a train trip, on our very own East- West Railroad from chapter 2. – Train: High-priority General Merchandise train H-CHINYC [What does this code mean?] – Where? Chicago to New York East & West RAILROAD Co. Chicago New York Pick-up TWC ABS CTC

7 Train schedule in database is activated to initiate operation The following happens: – “Crew Call System” identifies the crew to be called for duty – Locomotives are prepared by Dispatcher & Service Track Foreman. – Yardmaster and mechanical crews ready cars East & West RAILROAD Co. Line-Haul Operations Chicago New York Pick-up TWC ABS CTC

8 When ready, locomotives are connected to the “head end of the train.” Air brake system is charged and brake test performed. When ready and given the highball by Yardmaster and Dispatcher, train departs. Line-Haul Operations East & West RAILROAD Co. Chicago New York Pick-up TWC ABS CTC

9 On the Steel Highway! When encounter “yard limits” along the way. – Main track controlled by track warrant or dispatcher authority – Is considered priority in yard limits, but must be prepared to stop within one-half of line of sight unless signal indicates otherwise Line-Haul Operations East & West RAILROAD Co. Chicago New York Pick-up TWC ABS CTC

10 Most likely encountering CTC communications – Dispatcher has setup schedule so that the “Meets” and “Overtakes” are consistent with our priority level to other trains. – Can have priority change, if we are early, late, or cause early/late actions to other trains. [Even problems with the exceeding of Federal hours of service rules.] Line-Haul Operations East & West RAILROAD Co. Chicago New York Pick-up TWC ABS CTC

11 As we are a general merchandise, might have to set out or pickup blocks of traffic requiring; – Head end crew movement on ground alongside of train – Additional brake tests, one for each time the train is broken up or added to – May result in delays or needed help from yard mechanical crew. Line-Haul Operations East & West RAILROAD Co. Chicago New York Pick-up TWC ABS CTC

12 Enter upon ABS control, where ; – Must get dispatcher permission to enter the “current of traffic” – Once in, signal indication is first level of communication – IF moving on single train against signals, are moving “against the current of traffic”, a track warrant will dictate the movements and extra care must be exercised Line-Haul Operations East & West RAILROAD Co. Chicago New York Pick-up TWC ABS CTC

13 If we happen to travel onto un-signalized territory, unlikely, but… Must operate in blocks on DTC or TWC Must obtain instructions and permission to travel within each and every block or “authority” Use of forms to document instructions Anything done in given “authority” must be documented and viewed carefully! Line-Haul Operations East & West RAILROAD Co. Chicago New York Pick-up TWC ABS CTC

14 Beware! We might encounter a train defect. – If we encounter an automatic detection on hot bearings, dragging equipment, truck-curving performance, or wheel defects we must; – Result, delays and possible loss of priority! Line-Haul Operations East & West RAILROAD Co. Chicago New York Pick-up TWC ABS CTC

15 Defects might be communicated from new system – AEI – Automated Equipment Identification, which reads computer chips that store information on cars, trailers, containers, locomotives, etc. – Railroad computers take any AEI notice, cross references to find out what train the offending item is on to report the defect to the crew. Line-Haul Operations East & West RAILROAD Co. Chicago New York Pick-up TWC ABS CTC

16 We arrived! – Upon arrival, enter into destination yards to receiving yards – Crew or local hostlers will disconnect locomotives for servicing Line-Haul Operations East & West RAILROAD Co. Chicago New York Pick-up TWC ABS CTC

17 Paperwork – Crew files reports including – If ending at home terminal, drive on home, – Otherwise lodging food and rest until next assignment back home. Line-Haul Operations East & West RAILROAD Co. Chicago New York Pick-up TWC ABS CTC

18 Review – Train operations to build the train – Communication systems to traverse the route – Train operations for en route changes – Actions for any defects or issues – End all operations with documentation Line-Haul Operations East & West RAILROAD Co.

19 Questions?


Download ppt "CE 515 Railroad Engineering Line-haul Operations Source: Armstrong Ch 13 “Transportation exists to conquer space and time -”"

Similar presentations


Ads by Google