Presentation is loading. Please wait.

Presentation is loading. Please wait.

I n t e g r i t y - S e r v i c e - E x c e l l e n c e 1 Press Kit IX: Commander’s Inspection Report (CCIR) SAF/IGI Office of The Inspector General 24.

Similar presentations


Presentation on theme: "I n t e g r i t y - S e r v i c e - E x c e l l e n c e 1 Press Kit IX: Commander’s Inspection Report (CCIR) SAF/IGI Office of The Inspector General 24."— Presentation transcript:

1 I n t e g r i t y - S e r v i c e - E x c e l l e n c e 1 Press Kit IX: Commander’s Inspection Report (CCIR) SAF/IGI Office of The Inspector General 24 June 2013 OVERALL BRIEFING CLASSIFICATION: UNCLASSIFIED

2 I n t e g r i t y - S e r v i c e - E x c e l l e n c e CCIR Requirement Wing CC’s will: Forward a report to MAJCOM/CC within 90 days of assuming command and annually thereafter. As a minimum, the report will include the Wing CC’s assessment of the 4 Major Graded Areas (MGAs) and sub-MGAs over the reporting period. 2

3 I n t e g r i t y - S e r v i c e - E x c e l l e n c e How do we build a CCIR? Wg/IG or CCIP Director prepares the report Follow format in the approved template No specific requirement for length longer report is not always better as a minimum, cover MGAs & sub-MGAs remainder IAW Wg/CC & NAF guidance Consider using pre-existing data/trends from: CC’s Inspection Management Board (CIMB) CCIP dashboard Wing Inspection Team (WIT) results/reports MICT results/trends 3

4 I n t e g r i t y - S e r v i c e - E x c e l l e n c e CCIR Process Drafted by Wg/IG or CC’s Inspection Program (CCIP) Director Reviewed/approved by Wg/CC Wg/CC submits to NAF for review/approval After NAF approval, Wg/CC submits final version to MAJCOM Use SIPRnet to transmit CCIR to protect potential vulnerabilities 4 CC to CC accountability, then IG & functional awareness afterwards

5 I n t e g r i t y - S e r v i c e - E x c e l l e n c e What will MAJCOM IG & Functionals do with CCIR? MAJCOM IG Use the CCIR as another input into the overall UEI continuous evaluation Compare the results from UEI Capstone with the CCIR to determine CCIP effectiveness MAJCOM Functionals Use the CCIR to determine what help the Wg/CC needs to solve problems Pursue any problem areas in functional role Determine if any MAJCOM problems exist & way ahead 5

6 I n t e g r i t y - S e r v i c e - E x c e l l e n c e Questions? 6


Download ppt "I n t e g r i t y - S e r v i c e - E x c e l l e n c e 1 Press Kit IX: Commander’s Inspection Report (CCIR) SAF/IGI Office of The Inspector General 24."

Similar presentations


Ads by Google